Thought on SCIPP’s Participation in SiLC Test Beam Activities

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

Marco Bregant Vertex05 - Nikko, November 2005 Dipartimento di Fisica Universit à di Trieste & Istituto Nazionale di Fisica Nucleare (INFN) - Trieste ALICE.
May 14, 2015Pavel Řezníček, IPNP Charles University, Prague1 Tests of ATLAS strip detector modules: beam, source, G4 simulations.
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
Long Shaping-time Silicon Readout Bruce Schumm University of California, Santa Cruz Amsterdam ECFA-DESY Workshop April
Long Shaping-time Silicon Readout Bruce Schumm UC Santa Cruz Arlington Linear Collider Workshop January
SCIPP R&D on Long Shaping- Time Electronics SLAC SiD Workshop October 26-29, 2006 Bruce Schumm.
Testbeams for Tracking Prototypes Two categories: TPC/Gaseous tracking – please chime in Solid-state (silicon  strip) tracking – will present some issues.
SCIPP R&D on Time-Over-Threshold Electronics and Long-Ladder Readout Beijing Linear Collider Workshop Beijing, China February Bruce Schumm.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SiLC Meeting November 18, 2005.
Thoughts on B-Field Uniformity for the SD Tracker SID Tracking Meeting October 22, 2004 Bruce Schumm UC Santa Cruz March 2001 Baseline Thanks to Harry.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LC Workshop January 6-10, 2004.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
ATLAS SCT module performance: beam test results José E. García.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Victoria Linear Collider Workshop July 28-31, 2004.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Patrick Spradlin, SCIPP trip to LLU, May 2, 2001 Detector Characteristics.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
A new idea of the vertex detector for ILC Y. Sugimoto Nov
STS Simulations Anna Kotynia 15 th CBM Collaboration Meeting April , 2010, GSI 1.
Study of FPCCD Vertex Detector 12 Jul. th ACFA WS Y. Sugimoto KEK.
Fine Pixel CCD Option for the ILC Vertex Detector
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Cornell LC Workshop July 13-16, 2003.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
ILC VXD Review, Fermilab, October 2007 Ariane Frey, MPI für Physik DEPFET Vertex Detector Simulation and Physics Performance Ariane Frey for the DEPFET.
Thomas Jefferson National Accelerator Facility Page 1 SVT – Review January Sensors for the Silicon Vertex Tracker Amrit Yegneswaran.
Vertex Detector for GLD 3 Mar Y. Sugimoto KEK.
Highlights From ILC R&D at SCIPP LCWS 2010 Friendship Hotel, Beijing, PRC March Bruce Schumm Santa Cruz Institute for Particle Physics.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Fine Pixel CCD for ILC Vertex Detector ‘08 7/31 Y. Takubo (Tohoku U.) for ILC-FPCCD vertex group ILC vertex detector Fine Pixel CCD (FPCCD) Test-sample.
LHCb VErtex LOcator & Displaced Vertex Trigger
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
FPCCD Vertex detector 22 Dec Y. Sugimoto KEK.
SCIPP R&D on the International Linear Collider Detector DOE Site Visit June 28, 2005 Presenter: Bruce Schumm.
Silicon Detector Tracking ALCPG Workshop Cornell July 15, 2003 John Jaros.
Forward Pixel Beamtest Analysis Carsten Rott Purdue University Januar 24, 2001.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
STS simulations: Layout, digitizers, performance Radoslaw Karabowicz GSI.
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Tracking R&D at SCIPP: Charge Division Long Ladder Readout Noise Non-Prompt Tracks with SiD CERN Linear Collider Workshop October
Study of Belle Silicon Vertex Detector Intrinsic Resolution Saša Fratina, Jožef Stefan Institute, Ljubljana, Slovenia for Belle SVD group.
Silicon Microstrip Tracking R&D in the US SiLC Collaboration Meeting University of Paris VII January 25, 2010 Bruce Schumm Santa Cruz Institute for Particle.
ILC Instrumentation R&D at SCIPP ALCPG ‘09 University of New Mexico September 29 – October Bruce Schumm Santa Cruz Institute for Particle Physics.
Timepix test-beam results and Sensor Production Status Mathieu Benoit, PH-LCD.
Octobre 2007LAL Orsay Very Forward Instrumentation of the ILC Detector Wolfgang Lohmann, DESY.
SPHENIX Mid-rapidity extensions: Additional Tracking system and pre-shower Y. Akiba (RIKEN/RBRC) sPHENIX workfest July 29,
Operation & Performance of the ATLAS SemiConductor Tracker Dr. Petra Haefner Max-Planck-Institut für Physik.
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
H.-G. Moser Max-Planck-Institut für Physik 2nd DEPFET workshop 3-6 May 2009 Open Issues Readout cycle: 10 µs or 20 µs ? Advantages of 20 µs: - smaller.
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
H.-G. Moser Max-Planck-Institut fuer Physik DEPFET Meeting Heidelberg Sept DEPFET Geometry for SuperBelle Sensor Geometry Pixel Pitch Constant/variable.
L. Bosisio - SVT TDR Meeting SuperB SVT Update on Strip Parameters and Layer 3 Readout Options Irina Rashevskaya, Lorenzo Vitale, Livio Lanceri,
The timing upgrade project of the TOTEM Roman Pot detectors
Tracking detectors/2 F.Riggi.
Time-Over-Threshold Readout Long Ladder Readout Noise
Effect of L* Changes on Vertex Detector and Forward Calorimeter Performance LCWS 2015 Whistler, BC, Canada November Bruce Schumm UCSC/SCIPP 1.
DESY contributions to MAPS DESY testbeam
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Radiation Damage Studies for Solid State Sensors Subject to Mrad Doses
Integration and alignment of ATLAS SCT
SuperB SVT Update on Sensor and Fanout Design in Trieste/Como
SuperB SVT Definition of sensor design and z-side connection scheme
ILC Instrumentation R&D at SCIPP
Design and fabrication of Endcap prototype sensors (petalet)
Beam Test Results for the CMS Forward Pixel Detector
Setup for testing LHCb Inner Tracker Modules
Aras Papadelis NIKHEF Vertex 2005, Nikko, Japan
International Tracking Testbeam Needs
Presentation transcript:

Thought on SCIPP’s Participation in SiLC Test Beam Activities SiLC Meeting Barcelona, Spain (by telephone) December 19 2006 Bruce Schumm

What might we want to demonstrate by 2011 (partial list)? Power Cycling Long-ladder operation / system noise Efficiency vs. occupancy for long ladder Point resolution (vs. incident angle) Timing resolution Rate capability / readout scheme Propagation effects (distance from readout chip) * Item in green can only be assessed with high-energy test beam, but some others might benefit

Faking the Magnetic Field Michael Young, UCSC Resolution Track Angle Different track angles for 5T field (B-Field) or 180 mrad tilt with no B-field (Tilted).

Faking the Magnetic Field Michael Young, UCSC Resolution Magnetic Field (T) Different B-Fields (B-field) or detector tilt to simulate Lorentz angle (Tilted)  Do we need high-field test beam facilities?

SiLC will want to develop both new sensors and new readout It would be best to test new sensors with established readout and new readout with established sensors IDEA: Might SCIPP be able to provide assemblies (ladders) of establihsed sensors borrowed from other experiments for readout groups to use in testing their electronics? Problem: ILC optimization points to Long Ladders – must worry about parallel noise Long Shaping Time – must worry about leakage current High Resolution – must worry about strip/readout pitch

Helmuth Spieler’s Rule of Thumb for Equivalent Noise Charge Qn (p 148 of his Semiconductor Detector Systems): where: Id = detector leakage current Rp = parallel resistance (bias resistance) C = effective capacitance = shaping time Ideally, Qn < 2% of a min-i signal, or roughly 500 e-. At  = 2 sec, this limits Id to be less than ~ 10 nA and Rp to being greater than ~ 5 M, where individual bias resistors in the ladder add in parallel.

Existing Sensors 7 m resolution goal suggests ~50 m is correct scale for readout pitch LHC sensors tend to have larger (~100 m pitch) Tevatron upgrade vertexing inner layers have correct pitch D0 L2-5 sensors have 30 m pitch with 60 m readout CDF L00 sensors have 25 m pitch with 50 m readout

D0 Layer 2-5 Sensors Very large (~ 1000) supply Characterization data-sheets available Leakage currents ap-pear acceptable (spec is ~ 10 nA/strip; actual is much better) Polysilicon bias resistor rather small

CDF Layer00 Sensors More limited supply (???; have 20 in hand, but can only keep 10) Will do characterization ourselves this winter Leakage current spec OK Polysilicon bias resistor OK (Both Rb and Ileak are a little marginal, but should be fine for initial testbeam

So, CDF L00 detectors looks possible, but only one at a time… “Long” ladder is one 8cm sensor and a big discreet capacitor? Or: build long ladder by bonding a single 8 cm sensor to low-leakage, large-bias-resistor, coarse-pitch detectors (GLAST would be a possibility) to allow for antenna, transmission line effects Or: identify more appropriate existing sensor (?)

Particularly for long ladders, angle of incidence can really matter  I believe it to be very important that we be able to rotate ladder around axis perpendicular to the beamline

What might SCIPP bring to a testbeam run for the mutual benefit of SiLC? (enlightened self-interest) Long (or “long”) ladder with well-understood sensor?  would need to develop front- and back-end specs for those wishing to plug electronics into it and to read out the electronics Alternatively, could produce several and ship them? Rotating jig for SCIPP ladder(s)? Would depend on availability of funding (“Supplemental” proposal is pending)