Introduction to Value Stream Mapping & Management

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Starting the Journey. Lean Means Eliminating WasteLean Means Eliminating Waste  Ohno – Reduce customer order to cash collection by removing non-value.
VALUE STREAM MAPPING Analysis of Material Transport.
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
IENG 451 JIT. Production Physics Little’s Law Throughput = WIP/Cycle time For fixed capacity, cycle time and WIP or proportional – thus you can increase.
Chapter 2 - The Value Stream
Value Stream Analysis Kaizen Training
Lean Six Sigma Knowledge of Lean 6σ Tools can help you in your daily work.
Summary: Review of Lean Principles
Lean and Sustainable Supply Chains. 1. Describe how Green and Lean can complement each other. 2. Explain how a production pull system works. 3. Understand.
CONTINUOUS IMPROVEMENT PROGRAM
Value Stream Mapping.
The Value of Lean Thinking Presented by: Brian D Krichbaum Process Coaching Incorporated.
Process Improvement Strategies Takt Time Future State Value Stream Map
Chapter 5 Value Stream Mapping
Implementation of Lean at Rheem Manufacturing Presenter Dr. Joan A. Burtner Associate Professor Industrial and Systems Engineering Mercer University School.
Value Stream Mapping How to Create the Future State Issue: You have mapped a current state, so what should your ideal or future state map look like? Overproduction.
Value Stream Mapping. Introductions & Objectives Value Stream Mapping.
Pg 1 What Is A Value Stream? All actions (Value and Non-Value-Added) currently required: – To design a product from concept to launch – To produce a product.
Value Analysis/ Flow Analysis
Lean Basics Dewey Warden.
Simple Process Mapping Techniques
1 Introduction to Value Stream Mapping & Management Major Mark McNabb, USAF.
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
QUALITY IN THE TRIANGLE Welcome! “Value Stream Mapping” Presenter : Pauline Campbell May 22, 2007.
OPERATIONS MANAGEMENT for MBAs Fourth Edition 1 Meredith and Shafer John Wiley and Sons, Inc. Chapter 5: Process Improvement: Reducing Waste Through Lean.
JUST IN TIME Operational Systems for Manufacturing… JIT and Lean Production.
Dr. Joan Burtner1 Introduction to the Lean Enterprise as a Quality Improvement Initiative Presented By: Dr. Joan A. Burtner Industrial and Systems Engineering.
Value Stream Mapping Quick Start. 2Employ Improvement Initiatives A series of steps that must be performed in the proper sequence to create value for.
Lean is a business system that focuses on doing only those things that add value to the customer, creating continuous one piece flow, and placing a high.
The Idea of Being Lean Cost Control and More! Steve Peirce, CMQ/OE, CQPA, Six Sigma Black Belt Director, Process Improvement Alberta Health Services CHPCA.
Process Characteristics
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Supplier Development project Tools for supplier development Inspiration for tools to be used in workshops.
Review of Lean Topics Dewey Warden.
Implementation of Lean at Rheem Manufacturing
Operations Fall 2015 Bruce Duggan Providence University College.
1 Lean Manufacturing Overview Lean Manufacturing Overview
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
1 Lean Office - Value Streams
Value Stream Mapping. Tips Keep it high level Remember this is a value stream map NOT a process map Use approximately 8 process steps Focus on the high.
Lean Manufacturing. Lean Enterprise - A business system for organizing and managing product development, operations, suppliers and customer relations.
Lean Production Strategy Lean Manufacturing Strategy
Mel Wendell – Mountain Pointe High School
Lean Manufacturing Series
Lean operations and JIT
Lean Manufacturing Basic Overview XYZ Company.
Pull Manufacturing and Just In Time
Lean Thinking ‘’ A small Professional Approach ‘’
Introduction to Lean Emily Varnado.
IENG Lecture 06 Process Tools:
Welcome to my presentation
Value Stream Mapping GEOP 4316.
Introduction to Materials Management
MODERN TRENDS IN PRODUCTION ENGINEERING
MGS 4020 Business Intelligence LSS Jul 19, 2018
Value Stream Mapping (VSM) Training
Value Stream Mapping ASQ March 2018.
Process Improvement Strategies Takt Time Future State Value Stream Map
Value Stream Map : Supplier : Picking cart : Fork lift : Material
What is a Value Stream Map?
L Maximizing Resources: Applying Lean Six Sigma Principles to Your Print Operation Monday March 18, AM – 12 PM.
Implementation of Lean at Rheem Manufacturing
IENG Lecture 06 Process Tools:
Six Sigma and Lean Thinking
Chapter 5 Value Stream Mapping
Chapter 5 Value Stream Mapping
Process improvement for the lab
Presentation transcript:

Introduction to Value Stream Mapping & Management Major Mark McNabb, USAF

Value and Lean - Major Principles Waste = Unnecessary Non-Added Value -- Scrap, rework, waiting for batches, unneeded space/items/etc -- People are NOT waste—they ARE the most versatile resource Value is Ultimately Defined by the End Customer -- Operators, maintainers, “emergency” folks, etc--Not just buyers Identify the Value Stream (VS) -- All steps in product creation, from first idea/action to end user -- Work Backwards from End User Needs, to Beginning of VS Make Value Flow Eliminate waste, Minimize non added-value, so that the item moves easily, from one value creating step to the next Let Customers PULL Value from Producer -- Don’t make then Push product along without a clear rqmt./signal from the next step- schedule by demand rather than forecasts Strive for Perfection (at VS level, Avoid optimizing individual steps)

Lean: Wasteful / Not Added-Value Conditions Over- Production Underused TALENTS Over- Processing Excess Inventory Many Cost, . Quality, Schedule Controls focus Only on Defect-causing “fabrication” -Which is the TIP of the waste . ICEBERG !! DEFECTS Waiting Transport Motion Six Sigma Focus Sources: Toyota, MIT

Lean, Value, Variation & Quality – F-16 MLG Door Defect-causing Process Variations Occur in the many Not-Added Value / Wasteful (NAV/W) steps, Not Just in the fewer Value Added steps. SO, Eliminating NAV/W steps can Reduce Variation, Improve Product Quality!

Best Method: Target “Non-Value” FIRST, then Six Sigma the “Value Added”

Learning to See, by Rother & Shook What is Value Stream Mapping (VSM) ? VSM comes from Toyota process flow improvement tools, as expanded by the Lean Enterprise Institute. It involves: A. Identifying (up to) All steps currently involved in providing a Product (Good or Service), from: -- Idea to Reality -- Raw Substances to Finished Product -- Product Delivery to Final Disposal B. Determining the Materiel and Information Functional flows associated with each step C. Evaluating which steps add value to the end item customer, and which are just pure Waste or are Necessary but non-added value (NAV) D. Developing a new Functional flow plan that eliminates Waste steps and reduces NAV steps Sources: Lean Thinking by Womack & Jones, Learning to See, by Rother & Shook

VSM: Getting Started - Identify your boundaries--start/end points, the Product Family you want to map, and the Value Stream Manager/Mapper for that Family - Gather the basic/key Information (Customer Needs, Process Measures, Supplier inputs) Lay out Process Steps on Paper in a simplified Visual Functional Flow, using Common Symbols Look for ways to cut/combine Steps to improve Flow, enable Pull, to Reduce Waiting & Inventory Lay out Better Value Stream on Paper

Guidance for Identifying Boundaries 1. START Simple: “Door to Door” within One facility (i.e. key materiel In from a supplier(s), product Out to a customer)—Nothing Less, or you are Sub-optimizing 2. Pick ONE Product Family, that is “representative” or “typical”. The Waste you find will Also be “typical”! -- A Product Family: normally defined as ”use of several common processes to create multiple items” Identify/Create A Value Stream Manager/Mapper: the person Responsible for that Product Family -- This person is not a specialist, and should answer Only to the Plant manager (Or even Higher authority)

Guidance for Info Gathering / Mapping Work “Upstream”, i.e. Start with Customer Rqmts, Then Process Inputs/Actions/Outputs, then Supplier(s) Inputs to Your Facility The VSM/their own Small “cadre” Walks the factory floor during a “typical” period(s), gathers Current “slice in time” information Information Gathering/Mapping Tools: Paper, Pencils (w/good Erasers), Stop-Watch/Calendar. Information Sources: VSM Observations (NOT Shop Chiefs’ Data, or Trends, or Averages, or Ideals, or post-Disasters) Protocol: Tell floor operators in Advance what and why you are mapping, encourage them to provide inputs, suggestions, Changes to your map. This is NOT “time & motion” or “prep for downsizing” !!

Common Information Types Cycle Time (C/T) Changeover Time (C/O) Uptime Number of Operators Number of product Variations Pack Size Working Time (Minus Breaks) Scrap Rate

Some Important Issues to Address When Developing a Future State Map Takt Time Supermarket vs. Shipping Continuous Flow “Scheduling” Production (Pacemaker) Production Mix Leveling Continuous Improvement