Native and Wild Trout Conference April 21, 2016 Phoenix AZ

Slides:



Advertisements
Similar presentations
The Upper Columbia United Tribes (UCUT) Formed in 1983 to provide a common voice for our region through the collaborative efforts of the Upper Columbia.
Advertisements

Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
LOWER SALMON RIVER Tributary Protection and Enhancement.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
Conserving Americas Fisheries U.S. Fish and Wildlife Service Columbia River Fisheries Program Office Future of Our Salmon A Vision of Restoration in the.
Planning for fish bearing waters between Glen Canyon Dam and Lake Mead.
Glen Canyon Dam Adaptive Management Program WY 2000 Low Steady Summer Flow Randy Peterson, BOR Barry D. Gold, GCMRC A Test of Concept.
PROPOSED PRIORITIES FOR SCIENCE AND COLLABORATION OCTOBER 2012.
Proposed Research and Monitoring Plan for Evaluating Trout Management Flows below Glen Canyon Dam AZDFG, USFWS, GCRMC, Reclamation, Western.
Narragansett Bay Estuary Program Narragansett Bay CCMP  Original done 1992  Stakedholder-developed goals, objectives, actions  Many key actions implemented.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
Hydroelectric Relicensing in Vermont Brian Fitzgerald Vermont Agency of Natural Resources.
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
San Joaquin River NWR Proposed Expansion Planning Process Summer 2011 Fall 2011 Spring 2012 Summer 2012 Public Input Public Input Prepare Draft Environmental.
EPA & Ecology 2005 # 1 AN ACADEMICIAN’S VIEW OF EPA’s ECOLOGY PROGRAM ESPECIALLY ITS ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM (EMAP) N. Scott Urquhart,
Glen Canyon Dam and the Colorado River: Diseases in the Grand Canyon. By Stephanie Boone.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
FERC & Hydrokinetic Projects Ocean Energy for New England Conference Hosted by the Marine Renewable Energy Center at the Advanced Technology and Manufacturing.
Glen Canyon Dam: The Elevation of Social Engineering Over Law Joseph M. Feller College of Law, Arizona State University National Wildlife Federation, Boulder,
Colorado River Overview February Colorado River Overview Hydrology and Current Drought Management Objectives Law of the River Collaborative Efforts.
Impacts of Low-Flow Rates on Recreational Rafting Traffic on the Colorado River in Grand Canyon National Park Catherine A. Roberts Joanna A. Bieri.
USGS Water Resource Monitoring and Assessment Activities Salinity and other topics presented to the Garfield County Energy Advisory Board Dec. 1, 2005.
8/29/2006 DRAFT Implementing an Adaptive Management Framework for the Fish and Wildlife Program DRAFT.
Fish and Wildlife Service Mission Conserve, protect and enhance fish, wildlife, and plants and their habitats for the continuing benefit of the American.
Alternative Gear Implementation Project Pat Frazier WDFW Region 5 Fish Program Manager Photo by Wild Fish Conservancy.
Mechanical Removal of Non-native Fishes in the Colorado River within Grand Canyon Lew Coggins, Michael Yard, Daniel Gwinn, and Clay Nelson 1 USGS, Grand.
TRAVEL MANAGEMENT PLAN Wallowa-Whitman National Forest March 2008 Nez Perce Tribe Update Nez Perce Tribe Update.
Farm Ponds and Fish and Wildlife
Management Strategies for Columbia River Recreational and Commercial Fisheries and Beyond Oregon and Washington Staff Options for Initial Analysis.
2 International efforts to coordinate Mekong water development started in 1920s – Series of international agreements mainly for navigation and boundary.
NOAA Science Advisory Board …advises the Secretary of Commerce for Oceans and Atmosphere on long- and short- range strategies for research, education,
The Endangered Species Act 1973, 1982, 1985, 1988 By Tristan Armstrong.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Managing Western Water as Climate Changes Denver, CO February 20-21, 2008.
Your Help is Requested Chatfield is critical to the future water needs of the Front Range area. Please help by writing letters of support for this project.
Phase 3 Environmental Documentation Process SEQUOIA NATIONAL FOREST AND GIANT SEQUOIA NATIONAL MONUMENT.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
Hawaiian Islands Humpback Whale National Marine Sanctuary Malia Chow, PhD NOAA Sanctuary Superintendent Marine And Coastal Advisory Council March 6, 2015.
Magnuson-Stevens Reauthorization Act of 2006 March 2007.
Topics for today Dams - Geography –Elwha River Dams –Glen Canyon Dam –Colorado Compact (1922) Ground water Chapter IX pp Importance Processes –Hydraulic.
January 27, 2011 Examples of Recovery Evaluation Objectives in the Western U.S. Delta Stewardship Council Presentation by the Independent Consultant.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
Watershed Restoration Overview for the Klamath Basin.
U.S. Department of the Interior U.S. Geological Survey Sandbars and Floods in Grand Canyon: Current Research and Monitoring Paul Grams, USGS.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS.
Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Department of Environmental Quality Coastal Habitat Protection Plan (CHPP) 2 Department of Environmental Quality Environmental Management Commission.
Lower Truckee River Bioassessment Symposium January 5 & 6, 2009 Desert Research Institute Status Report on Fish Populations in the Truckee River Matt Maples.
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
> Las Vegas Valley Watershed Advisory Committee Regional Water Quality Plan.
1 Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Yolo Bypass Fisheries Enhancement.
K1 Proposed National Levee Safety Program An Introduction for the Tribal Assistance Coordination Group May 12, 2011.
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
Interagency Coordination in Long Range Transportation Planning
Collaboration on the Colorado River: Lessons Learned from 5 years of Glen Canyon Dam Planning (LTEMP EIS) December, 2016.
Conservation in Action:
Protecting the Quality of our Water
Comprehensive Conservation & Management Plan (CCMP)
Do we focus too much on flows
photo : Michael Collier
Executive Order – The Basics
Alaska Roadless Rulemaking
Lecture 1: Introduction to Fisheries
North Shore Streamkeepers February 23, 2019
Bannock County Comprehensive Plan
Presentation transcript:

Native and Wild Trout Conference April 21, 2016 Phoenix AZ Trout Advocacy Glen Canyon Dam Adaptive Management Program & Glen Canyon Dam Long Term Experimental and Management Plan Draft Environmental Impact Statement Chris Budwig, Trout Unlimited Technical Work Group Representative, Glen Canyon Dam Adaptive Management Program Native and Wild Trout Conference April 21, 2016 Phoenix AZ

Glen Canyon Dam Adaptive Management Program Cooperative effort to integrate of dam operations, downstream resource protection and management, and monitoring and research to improve the values for which the Glen Canyon National Recreation Area and Grand Canyon National Park were established. Established in 1995 pursuant to GCPA and related EIS Led by the Assistant Secretary, DOI 25 member Federal Advisory Committee includes seats for AGFD and recreation fishing interests Major focus on humpback chub recovery, sediment conservation (beaches), and the Lees Ferry trout fishery

Lees Ferry Catch Rates 1963-2013 Dam operations really matter

Lees Ferry Recreational Trout Fishery Management Recommendations Proactive effort to identify actions to maintain/enhance the trout fishery without impacting native fish downriver Recommendations take into consideration other Colorado River resource values below Glen Canyon Dam Tier off the NPS Fishery Plan and GCD AMP Desired Future conditions Plan will guide input to the Long Term Experimental and Management Plan EIS

Goals Goal 1. Maintain and enhance a wild (self-sustaining) Blue Ribbon rainbow trout fishery consistent with the protection and recovery of the native aquatic community in Grand Canyon National Park. Goal 2. Provide a dependable, high- quality recreational trout fishery that sustains economic support for local businesses and Coconino County.

Recommendations Report contains 15 recommendations Focus on four major issues Aquatic food base Excessive recruitment of young trout Glen Canyon Dam operations (high flows, fluctuating flows, low flows, etc.) Rising Water temperatures Recommendations will benefit humpback chub, riparian wildlife species, hydropower production, sand conservation, and archaeological site preservation

Glen Canyon Dam Long Term Experimental and Management Plan (LTEMP) EIS Proposed action: Develop and implement a structured, long‐ term experimental and management plan for operations of Glen Canyon Dam • Purpose of the proposed action: Provide a framework for adaptively managing Glen Canyon Dam operations over the next 20 years consistent with the Grand Canyon Protection Act and other provisions of applicable federal law

Experiments under the Preferred Alternative Extended Duration Fall high flows Low summer flows: 5,000 to 8,000 cfs reduced fluctuation releases from Jul. through Sep. to provide warmer water for humpback chub Trout management flows: short duration high fluctuations to reduce trout production Steady low weekend flows from May through August to increase aquatic food base production •

Angler Recommendations Recognize that the Lees Ferry Rainbow Trout fishery as priority resource “value” Incorporate the goals and objectives of the AZGFD Fishery Management Plan into the LTEMP. More fully consider the impacts of repeated fall high flow experiments on the aquatic food base, rainbow trout, and invasive species in Glen and Marble Canyons. Provide more emphasis on conducting high flow experiments in the spring vs fall Test the use of steady weekend “bug flows” to increase the production and diversity of the aquatic insects in the Colorado River below GCD. Carefully test the use of Trout Management Flows (TMF) only when there is an identified need to reduce the number of young of the year rainbow trout

Next Steps and Angler Action LTEMP EIS comments due by May 7, 2016. Sign the petition (today) Send Comments (draft comment letter) Info is included in meeting packet

Questions? Chris Budwig Phone: Email:   Photo by: George Andrejko