Ryan Thurston | Duncan McLennan

Slides:



Advertisements
Similar presentations
MODULAR BUILD - Introduction a. What is Modular Build? b. Basic Components c Standard Dimensions d. Uses Cost Competitive System.
Advertisements

Construction Method, Material Selection & Building Services
Building Codes, Zoning Ordinances
Dr. Ruth Collins TrinityHaus
Structural Steel Construction
Contents: Cover
Pryda Floor & Rafter Truss Systems
Portal Framed Construction
Comparison of Concrete Reinforced Building System and Light Steel Building System.
Lightweight Forming System and Roofs for Concrete Floors.
REVOLUTIONARY BUILDING SYSTEM TM. TIMECOSTENERGY THE PROBLEM A NEED FOR INNOVATION.
Timber Framed Structures
Above Ground Storage Tanks &
Brief Introduction of 3D Construction System
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Building Methods Types of Structure.
Concrete Pre Cast Panel By Peter Spence ID:
The development of floors After the foundations have been completed and the external walls constructed the construction of the floors commences. There.
The development of wall structures After the foundations have been completed the external walls are set out and construction commenced. There are many.
By.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Case Study – St Clair Park Village, Auckland, NZ
Residential Roofing Systems
CONSTRUCTION AND DETAILING 1
Unit 1 Types of Construction
Topic C1 Superstructures - walls
Prefabricated Timber Frame Construction
Building With Superior Walls Introducing The Superior Advantage.
PRECAST CONCRETE CONSTRUCTION
Building Construction Types and Size-Up Considerations.
SHREE J.M.SABVA INSTITUTE OF ENGINEERING &TECHNOLOGY, BOTAD 1.BELADIYA VISHAL R. 2.PARMAR PRAKASH K. 3.DESAI PARAS V. 4.PARMAR VISHAL D. 5.GOHEL KAMLESH.
Chapter 25 Framing Methods. 2 Links for Chapter 25 Balloon Framing Platform Framing Post-and-Beam Framing Related Web Sites Steel Construction Concrete.
UAS Universal Anchoring Solutions The Helipost™ An environmentally friendly engineered alternative to expensive concrete anchors and piers, the Helipost.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Chapter 43 Common Commercial Construction Materials.
Chapter 28 Structural Components of Framed Construction.
9. THERMAL MASS  Thermal mass is a measure of a material's capacity to absorb heating or cooling energy. Materials such as concrete or bricks are highly.
Unit 6/P6 – Timber Frame Construction Name ________________
QuickWalls® strong. fast. simple. *Light Weight *Insulated
3D Panel Construction System
Locrete Palestine Mr. Fahim Kasis, Managing Director Locrete Industries.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Robustdetails Feedback from Robust Details Technical Advisors.
Cross Wall Construction
Energy Seminar A prefabricated, non-disruptive approach to whole house energy retrofit. Stock assessment, appropriate properties and implementation. John.
Precast Concrete Panel Group 6 Alex Cooper Yadir Avila Erjan Kadrakunov.
LAS SALINAS CONDOMINIUMS Key West, Florida. Featuring: A Sprayed Polyurethane Roof System Applied To Concrete.
FACTORS EFFECTING COST OF BUILDING ELEMENTS
Learning Outcome Lesson Objective
Learning Outcome Lesson Objective
Floor Systems and Foundation Support
Vendelso.
P4 Part 2 Carl James.
CONCRETE AND SUSPENDED TIMBER
Prefabricated Timber Frame Construction
Temporary Works – P8 Project Practice.
BUILDING TECHNOLOGY IN CONSTRUCTION
Types of ground floors.
Building Methods Types of Structure.
[16469] Low Energy Building Design
Progress Charts.
Wood Structures Topic 6 Roof Framing Trusses
Pre-Contract Cost Control
Offsite Applications for Rail Overbuild Part 1
Building Construction I Sofia Sebastian 1
6 MMC (Off Site Production)
STRUCTURAL TIMBER FRAMING
Name____________________________ Tutor Group _____
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
5. HEAVY TIMBER FRAME CONSTRUCTION
Presentation transcript:

Ryan Thurston | Duncan McLennan

How OSEC was developed Conceived and designed by engineers to provide a fast track, Green and efficient flooring & roofing solution To utilise in-house design expertise and steel sections for superior structural performance Market research showed nothing the same Prototype designs provided proof of concept Successful completion of trial show houses and a commercial retail unit have proved it in practice

What is OSEC? Off Site Engineered Cassette Modules Designed by Structural Engineers for each application Modular floor and roof units Have been used in Residential constructions Have been used in Commercial constructions Have been used in Light Industrial constructions

How are they made? ‘C’ section galvanised steel joist framework Welded or Tek screwed Typical finish for floor units is moisture resistant 22mm thick chipboard Additional finishes to required specification can be incorporated to the modules within the factory Sealed and produced to factory controlled conditions and tolerances Loaded onto lorry in the reverse laying sequence for ease of unloading/installing

How are they installed? Delivered to site Modules are then hoisted using removable lifting eyes into the structure by crane, or other appropriate plant Positioned by Installation Team Lined and Levelled Bolted together for structural integrity to meet loading specification Inspected, handed over and signed off

Green Benefits Sustainable materials which can be reused/recycled in total – helping embodied carbon reduction for 2019 Modules can be supplied in a range of U values to suit special project requirements Reduced lorry movements to site when compared to Site or Ready Mixed concrete In contrast to ground bearing concrete slabs – No material wastage; less removal of spoil; No A142 mesh; No wash-out debris; No insulation < 5C; No sand/cement screed etc.

Green Benefits contd. Compared to traditional Upper Floor construction: Achieves Element ‘A’ rating for Upper Floors in Green Book Specification Shallower floor build-ups without compromising structural performance, providing design flexibility Longer spans, potentially removing need for load bearing internal walls and foundations Galvanised finish provides superior protection over timber joists for longevity

Key Benefits Cost effective against traditional floor construction through efficiency savings (reduced build time) and preliminary savings for site/overheads Improved Health & Safety due to reduced site activity Bespoke design floor cassettes built to contract requirements

Key Benefits No additional precautions required in hot weather Instant working platform, allowing follow-on trades to continue as soon as the floor installation is complete Manufactured to factory tolerances in quality controlled conditions (sheltered from the elements) No delays through rain, or temperatures below 5C No insulating covers required during cold weather

Technical Compliance Excellent air tightness can be achieved where the modules abut different wall construction methods, by adopting appropriate construction detail For upper floors within dwellings, OSEC modules meet the Class C classification for 40dB when specified to meet clause 5.23 of Approved Document E BCSA to support carbon comparison assessment against traditional construction methods

End of Slides