CMGT 410 aid Education Begins/cmgt410aid.com

Slides:



Advertisements
Similar presentations
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Advertisements

Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Management.
IT 499 Bachelor Capstone Week 4. Adgenda Administrative Review UNIT three UNIT Four Project UNIT Five Preview Project Status Summary.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
HRM 498 ASSIST Teaching Effectiverly/hrm498assist.com FOR MORE CLASSES VISIT
CMGT 410 Course Tutorial For more course tutorials visit
PM 586 ACADEMIC PROFESSOR/TUTORIALRANK For more course Tutorials
HCIS 410 Read, Lead, Succeed/Uophelpdotcom For more course tutorials visit
CIS 170 MART Teaching Effectively/cis170mart.com FOR MORE CLASSES VISIT HCIS 410 AID Inspiring Minds/hcis410aid.com FOR MORE CLASSES.
MGT 437 OUTLET Become Exceptional/mgt437outlet.com FOR MORE CLASSES VISIT
CMGT 410 Week 1 Individual Project Proposal Check this A+ tutorial guideline at 410/CMGT-410-Week-1-Individual-Project-
CMGT 410 Week 2 Individual Project Task-List Check this A+ tutorial guideline at Week-2-Individual-Project-Task-List.
CMGT 410 Week 2 Learning Team Project Charter Check this A+ tutorial guideline at 410-Week-2-Learning-Team-Project-Charter.
CMGT 410 Week 3 Individual Project Budget Check this A+ tutorial guideline at Individual-Project-Budget.
CMGT 410 Week 4 Individual Project Controls Check this A+ tutorial guideline at Week-4-Individual-Project-Controls.
CMGT 410 Week 4 Learning Team Project Costing Check this A+ tutorial guideline at Team-Project-Costing.
CMGT 410 Week 5 Learning Team Project Evaluation and Control Check this A+ tutorial guideline at
HCIS 410 AID Experience Tradition /hcis410aid.com
PM 586 Slingshot Academy / pm586.com
HRM 498 ASSIST Experience Tradition/hrm498assist.com
Systems Analysis and Design in a Changing World, 4th Edition
HRM 310 GUIDE Success trials - hrm310guide.com
Chapter 3 Managing the Information Systems Project
CMGT 410Possible Is Everything/tutorialrank.com
CMGT 445 Competitive Success/snaptutorial.com
CPMGT 300 Competitive Success/snaptutorial.com
CMGT 575 Competitive Success/snaptutorial.com
HRM 324 Competitive Success/snaptutorial.com
CMGT 410 Possible Is Everything/snaptutorial.com
CIS 207 Competitive Success-- snaptutorial.com
CMGT 410 Education for Service-- snaptutorial.com.
HCIS 410 Education for Service-- snaptutorial.com.
INF 342 Enthusiastic Study/snaptutorial.com
HCIS 410 ASSIST Education Your Life-- hcis410assist.com ENV 340 STUDY.
CMGT 410 HOMEWORK Education Your Life--cmgt410homework.com.
HCIS 410 ASSIST Lessons in Excellence- - hcis410assist.com.
CMGT 410 AID Lessons in Excellence-- cmgt410aid.com.
CMGT 410 Lessons in Excellence-- cmgt410.com. CMGT 410 Entire Course (updated) For more course tutorials visit CMGT 410 Week 1 Individual.
CMGT 575 Education Begins / tutorialrank.com. CMGT 575 All Assignments For more course tutorials visit CMGT 575 Week 2 Individual.
CMGT 410 Perfect Education/ cmgt410.com.
CMGT 410 HOMEWORK Lessons in Excellence--cmgt410homework.com.
CMGT 410 AID Perfect Education/ cmgt410aid.com.
CMGT 410 HOMEWORK Perfect Education/ cmgt410homework.com.
CMGT 445 MASTER Perfect Education/ cmgt445master.com.
CMGT 445 TUTORIAL Perfect Education/ cmgt445tutorial.com.
CIS 207 Education for Service-- snaptutorial.com
CMGT 410Education for Service/tutorialrank.com
CMGT 445 Education for Service/snaptutorial.com
CPMGT 300 Education for Service/snaptutorial.com.
HCIS 410 PAPER Lessons in Excellence - - hcis410paper.com.
HRM 324 Education for Service/snaptutorial.com
HCIS 410 ASSIST Education for Service- -hcis410assist.com.
CMGT 410 Teaching Effectively-- snaptutorial.com.
CMGT 575 Teaching Effectively-- snaptutorial.com.
HCIS 410 Teaching Effectively-- snaptutorial.com.
CIS 207 Teaching Effectively-- snaptutorial.com
CMGT 410 HOMEWORK Education for Service-- cmgt410homework.com.
CMGT 445 TUTORIAL Education for Service-- cmgt445tutorial.com.
CMGT410 Education for Service-- cmgt410.com. CMGT 410 Entire Course (updated) For more course tutorials visit CMGT 410 Week 1 Individual.
HCIS 410 Education for Service-- tutorialrank.com
CMGT 445 Teaching Effectively-- snaptutorial.com.
CPMGT 300 Teaching Effectively-- snaptutorial.com.
ISCOM 471 MASTER Invent Yourself/iscom471master.com
Effective Project Management: Traditional, Agile, Extreme
Executive Project Kickoff
Chapter 2 Managing the Information Systems Project
Chapter 3 Managing the Information Systems Project
CMGT 410 HOMEWORK best future education / cmgt410homework.com.
Presentation transcript:

CMGT 410 aid Education Begins/cmgt410aid.com FOR MORE CLASSES VISIT www.cmgt410aid.com

CMGT 410 Entire Course We have another new set of CMGT 410 Tutorials which could be found here http://www.cmgt410aid.com/product-36-CMGT-410-Entire-Course-%28updated%29 CMGT 410 Week 1 Individual Assignment Project Proposal CMGT 410 Week 1 DQ 1 and DQ 2 CMGT 410 Week 2 Individual Assignment Project Task List CMGT 410 Week 2 Learning Team Project Charter CMGT 410 Week 2 DQ 1 and DQ 2 CMGT 410 Week 3 Individual Assignment Project Budget CMGT 410 Week 3 Team Assignment Project Schedule CMGT 410 Week 3 DQ 1 and DQ 2 CMGT 410 Week 4 Individual Assignment Project Controls CMGT 410 Week 4 Team Assignment Project Costing CMGT 410 Week 4 DQ 1 and DQ 2 CMGT 410 Week 5 Team Assignment Project Evaluation and Control CMGT 410 Week 5 Final Powerpoint Presentation CMGT 410 Week 5 DQ 1 and DQ 2

CMGT 410 Entire Course (updated) CMGT 410 Week 1 Individual Assignment Project Proposal (2 Sets) CMGT 410 Week 1 DQ 1 and DQ 2 CMGT 410 Week 2 Individual Assignment Project Task List CMGT 410 Week 2 Individual Assignment Project Task List (New) CMGT 410 Week 2 Learning Team Project Charter CMGT 410 Week 2 DQ 1 and DQ 2 CMGT 410 Week 3 Individual Assignment Project Budget CMGT 410 Week 3 Individual Assignment Project Budget (New) CMGT 410 Week 3 Team Assignment Project Schedule CMGT 410 Week 3 DQ 1 and DQ 2 CMGT 410 Week 4 Individual Assignment Project Controls

CMGT 410 Week 1 DQ 1 and DQ 2 CMGT 410 Week 1 DQ 1 and DQ 2

CMGT 410 Week 1 Individual Assignment Project Proposal (2 Sets) This tutorial contains 2 different Sets Consider the following scenario: You have been hired by a large company with branch offices around the country to assist with rollout of a new companywide compliance system. While initially the focus was on implementation of the technology, it was found that success will require at least 10 hours of training for all managers across the country on both the use of the new platform as well as a host of new compliance policies being introduced. Of the options discussed, it was generally agreed than the training should be hands-on

CMGT 410 Week 2 DQ 1 and DQ 2 CMGT 410 Week 2 DQ 1 and DQ 2

CMGT 410 Week 2 Individual Assignment Project Task List (New) You have been tasked with the project of organizing a company offsite 2-day training session in which people are brought in from different parts of the country. This entails everything from preparation, accommodations, and facilities. Create a Microsoft® Project file for the project that includes the following: Create a Work Breakdown Structure (WBS) that includes all project tasks (hierarchically grouped) and durations. Establish task precedence relationships. Show milestones and deliverables. Click the Assignment Files tab to submit your assignment.

CMGT 410 Week 2 Individual Assignment Project Task List We have another set with new instructions which can be found here http://www.cmgt410aid.com/product-40-CMGT-410-Week-2-Individual-Assignment-Project-Task-List-%28New%29 You have been tasked with the project of organizing a company offsite 2-day training session in which people are brought in from different parts of the country. This entails everything from preparation, accommodations, and facilities. Submit a 2- to 3-page executive memo summarizing the project's objective, any scoping boundaries used to define the project, and relevant facts about the tasks or resources. Identify all related tasks and resources needed to complete this project. Highlight or specify any measurable deliverables relating to your project. Attach a task list with assigned resources from a Microsoft® Project file that supports what you have outlined in your memo.

CMGT 410 Week 2 Learning Team Project Charter Choose a project involving an IT requirement with multiple tasks and human resources. This project must come from a business situation—for example, hardware procurement and installation, network acquisition, implementation, or expansion—in which each Learning Team member contributes background details. This is a consolidated source of information which lays the foundation for successful completion of any project by identifying your project vision and communicating the overall approach for a project to all key stakeholder audiences.

CMGT 410 Week 3 DQ 1 and DQ 2 CMGT 410 Week 3 DQ 1 and DQ 2

CMGT 410 Week 3 Individual Assignment Project Budget (New) The project for the company offsite 2-day training session has been given a preliminary go-ahead. However, a budget needs to be submitted for approval. Update the Microsoft® Project file submitted in Week Two by adding the following information: Identify resources (both personnel and materiel) needed for the project. Assign the resources to the project tasks. Estimate the costs for the resources, and add the costs to the resource information in the Microsoft Project file. Estimate the total cost for the project, using the Microsoft® Project budget or cost reports. Submit all Individual assignments (Project Proposal and Project Task List and Schedule) with updates based on instructor feedback. Click the Assignment Files tab to submit your assignment.

CMGT 410 Week 3 Individual Assignment Project Budget We have another set with new instructions which can be found here http://www.cmgt410aid.com/product-39-CMGT-410-Week-3-Individual-Assignment-Project-Budget-%28New%29 The project for the company offsite 2-day training session has been given a preliminary go-ahead. However a budget needs to be submitted for approval. Write a 2- to 3-page memo explaining the financial implications of your project that does the following: Adds costs estimates to your resources (both labor and material) – Refer to websites like the United States Department of Labor for estimates. Adds estimates for all task duration and sequencing of tasks (including precedence relations) Summarizes any relevant facts about the project duration, number or type of resources, critical task sequencing, and how duration estimates were arrived at Highlights if there are any milestones for your project Include a Microsoft® Project Gantt chart, as an attachment, showing the WBS of tasks (with dependencies) and task sequences, along with any budget or cost reports to support your memo.

CMGT 410 Week 3 Team Assignment Project Schedule This is the core of any project plan used to communicate what tasks are needed and the order of sequence to be done to meet deadlines and deliverables. At a minimum the section will contain the following: • Business requirements document (BRD) that provides additional details regarding the expectations (such as user, system, and functional) that must be met for achieving goals of the project

CMGT 410 Week 4 DQ 1 and DQ 2 CMGT 410 Week 4 DQ 1 and DQ 2

CMGT 410 Week 4 Individual Assignment Agile Project Management Practices As a project manager, you are going to prepare two project outlines for the development of a mobile application. One project outline uses a waterfall model, another uses an agile method. Prepare two project outlines using Microsoft® Project. Each outline shall consist of a task list and a Gantt chart showing task durations and precedence relationships. Include a 350- to 700-word brief explanation of how the two project outlines differ. Be sure to address how Agile addresses complexity and uncertainty. Click the Assignment Files tab to submit your assignment.

CMGT 410 Week 4 Individual Assignment Project Controls The company offsite 2-day training session project is about ready to enter the execution phase. However, management has a history of being surprised with projects that finished over-budget, did not adhere to the timeline, evinced waste of resources, or did not meet expectations. Address your strategy for the following in a 2- to 3-page memo to gain their confidence in your project management abilities:

CMGT 410 Week 4 Team Assignment Project Costing The allocation and cost of resources need to be carefully monitored if a project is to be delivered on-time and on-budget. At a minimum this section will contain the following: • Allocation of resources to project tasks (both labor and material) • Cost estimates for project resources

CMGT 410 Week 5 DQ 1 and DQ 2 CMGT 410 Week 5 DQ 1 and DQ 2

CMGT 410 Week 5 Final Powerpoint Presentation Prepare a 10- to 12-slide Microsoft® PowerPoint® presentation of the entire Learning Team Project, as completed in Weeks Two, Three, Four, and Five. Include detailed speaker notes.

CMGT 410 Week 5 Individual Assignment Comparison of Project Management Models Consider the following scenario: Your company has been using Traditional Project Management (TPM) methods for years, but is now looking into the possibility of adopting agile practices. Your boss has asked you to prepare a paper comparing TPM to agile practices and summarizing the benefits and limitations of each. Write a 5- to 7-page paper including, at a minimum, the following information: Briefly describe the TPM waterfall method. Briefly describe one or more Agile project management approaches. Compare and contrast TPM and Agile methods, emphasizing the strengths and weaknesses of each. Discuss what kind of projects would be more appropriate for TPM approaches and what types would be more appropriate for Agile approaches. Discuss how a project

CMGT 410 Week 5 Team Assignment Project Evaluation and Control Revise and submit all sections of your Learning Team project along with the Week Five section below. It is essential for establishing confidence that a project will be executed effectively and with minimal waste. A plan for performance measurement requires identifying which critical element should be measured, how they are measured, and when they are measured to communicate if the project is on track. At a minimum the section will contain the following:

CMGT 410 aid Education Begins/cmgt410aid.com FOR MORE CLASSES VISIT www.cmgt410aid.com