ISIS Accelerator Division

Slides:



Advertisements
Similar presentations
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
Advertisements

ISIS Accelerator Division
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
ALPHA Storage Ring Indiana University Xiaoying Pang.
Space Charge and High Intensity Studies on ISIS C M Warsop Reporting the work of D J Adams, B Jones, B G Pine, C M Warsop, R E Williamson ISIS Synchrotron.
ESS DTL beam commissioning
100 MeV- 1 GeV Proton Synchrotron for Indian Spallation Neutron Source Gurnam Singh Beam Dynamics Section CAT, Indore CAT-KEK-Sokendai School on Spallation.
ISIS Upgrade Options ISIS Accelerator Division John Thomason.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Proton Driver Status ISIS Accelerator Division John Thomason.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
MW Upgrades for the ISIS Facility John Thomason. OptionCommentsBeam Power (MW) Neutron Yield 1(a)Add 180 MeV LinacTechnical Issues~ (b)Add 800.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Alexander Aleksandrov Oak Ridge National Laboratory
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Proton Driver Keith Gollwitzer May 31, Initial Design Overview For design purposes, the following is assumed –H - beam comes from PIP II and follow-on.
FFAG Studies at RAL G H Rees. FFAG Designs at RAL Hz, 4 MW, 3-10 GeV, Proton Driver (NFFAGI) Hz,1 MW, GeV, ISIS Upgrade (NFFAG) 3.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
ISIS Upgrade Modelling Dean Adams On behalf of STFC/ISIS C Warsop, B Jones, B Pine, R Williamson, H Smith, M Hughes, A McFarland, A Seville, I Gardner,
J-PARC Accelerator and Beam Simulations Sep. 7th, SAD2006 Masahito Tomizawa J-PARC Main Ring G., KEK Outline of J-PARC Accelerator Characteristics of High.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Lecture17(Course Summary).PPT - E. Wilson - 3/3/ Slide 1 COURSE SUMMARY A Design Study of a Compressor ring for A Neutrino Factory MT 2009 E. J.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
F D F November 8, 2006Alessandro G. Ruggiero1 of GeV 10-MWatt Proton Driver Target 200-MeV DTL 1.0-GeV FFAG H – Stripping Foil Injection Energy,
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
Proton Driver Developments and the Neutrino Factory Christopher R Prior ASTeC Intense Beams Group STFC Rutherford Appleton Laboratory, U.K.
Proton Driver Scenarios at RAL and CERN
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Towards a Common Proton Driver for a Neutrino Factory
A.Lachaize CNRS/IN2P3 IPN Orsay
Progress in the Multi-Ion Injector Linac Design
Jeffrey Eldred, Sasha Valishev AAC Workshop 2016
Acknowledgments: LIU-PT members and deputies, H. Bartosik
PSB rf manipulations PSB cavities
1- Short pulse neutron source
Injector Chain General and more about p-RCS
12 GeV CEBAF.
Injector Chain General and more about p-RCS/i-RCS
FFAG Accelerator Proton Driver for Neutrino Factory
Update on PTC/ORBIT space charge studies in the PSB
LHC (SSC) Byung Yunn CASA.
Collective Effects and Beam Measurements in Particle Accelerators
A Design Study of a Compressor ring for
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring
MEBT1&2 design study for C-ADS
Physics Design on Injector I
Kicker and RF systems for Damping Rings
Status of the JLEIC Injector Linac Design
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
JLEIC 200 GeV Ion Injector Chain and Bunch Formation
Multi-Ion Injector Linac Design – Progress Summary
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

ISIS Accelerator Division ISIS Upgrade Options John Thomason ISIS Accelerator Division

0.24 MW ISIS • Assumes an optimised 2RF system giving 300 µA in the synchrotron • 4/5 pulse pairs to TS-1 (192 kW) and 1/5 pulse pairs to TS-2 (48 kW) • Must keep beam to TS-2 for the foreseeable future

Upgrade Options Option Comments Beam Power (MW) Neutron Yield 1(a) Add 180 MeV Linac Technical Issues ~ 0.4 1.7 1(b) Add 800 MeV RCS Operational Issues ~ 0.5 2.0 1(c) Upgrades 1(a) + 1(b) Technical/Operational Issues ~ 0.9 3.8 2 Add ~ 3 GeV RCS Recommended 1st Upgrade 1 3.2 3 Add ~ 6 GeV RCS Technical/Cost Issues 5.6 4 Upgrades 1+2 or 1+3 ~ 2 – 6 ~ 6.4 – 16.8 5 400 – 800 MeV Linac + 3 GeV RCS Recommended 2nd Upgrade 2 – 5 6.4 – 16.0 6 1.334 GeV Linac + Accumulator Ring Good “Green Field” Option 18.8 • Upgrade routes for ISIS are summarised in the table above. All designs are to be developed primarily for an optimised neutron facility, and should provide provision of an appropriate proton beam to the newly built TS-2. The list here is not exhaustive, but presents the main, reasonable routes that would provide a major boost in beam power. Primary considerations are the cost relative to a new facility and the impact on ISIS operations.

Linac Upgrade • Replaces oldest and probably most vulnerable part of ISIS accelerators • Increased energy (up to 180 MeV) gives increased intensity in synchrotron and more beam to target • Similar designs are already available e.g. CERN Linac4, J-PARC • Would require a new building and reconfiguration of the TS-1 neutron and muon targets

(Steve Jago, Stuart Birch, Adrian McFarland) 180 MeV Injection (Steve Jago, Stuart Birch, Adrian McFarland) HEDS Line - DC Dipoles and Quadrupoles Vertical “Sweeper” - Pulsed Dipole Injection Septum - High Current DC Dipole Injection Dipoles - 4 Pulsed Dipoles - Closed Orbit Bump Stripping Foil - Beam rigidity - Aperture - Increased field/current/voltage - Stripping efficiency - Lifetime Single Turn / Ferrite Core 155 mm Aperture Peak Field ~ 0.11 T for 70 MeV Peak Current ~ 12200 A Rise / Fall Time ~ 80 µs Flat-top ~ 400 µs

70 MeV Magnetic Model Calculated current - 12195 A Actual current – 12200 A Calculated voltage - 175 V Actual voltage ~ 250 – 300 V

180 MeV Magnetic Model Peak field ~ 0.18 T for 180 MeV Calculated current - 20725 A Calculated voltage - 290 V

Power Supply I > 21000 A Rise/fall ~ 80 µs Flat-top ~ 400 µs Possibility of tuneable gradient on “flat-top” Current waveform Voltage waveform

180 - 800 MeV Acceleration (Chris Prior) Initial calculations (done in 2003) show that 180 MeV injected beam should be cleanly accelerated to 800 MeV in the ISIS ring at intensity levels giving 0.5 MW on target There should already be enough RF acceleration available in the ISIS ring to accommodate this (calculations were better optimised for fundamental only rather than dual harmonic acceleration) Did not include transverse effects Requires beam chopping

Recommended MW Upgrades • Based on a ~ 3 GeV RCS fed by bucket-to-bucket transfer from ISIS 800 MeV synchrotron (1MW) • RCS design also accommodates multi-turn charge exchange injection to facilitate a further upgrade path where the RCS is fed directly from a 800 MeV linac (2 – 5 MW)

RCS Rings (Chris Warsop, Grahame Rees, Dean Adams, Ben Pine, Bryan Jones, Rob Williamson)

Outline Work Plan Main topics to cover Pull work together: comparisons Longitudinal Calculations/Simulations for candidate FI Rings, then MTI Build up MTI simulation 2D to 3D, then acceleration Model Injection Magnet and Region (CST based, as profile monitors) Transverse Space Charge and Working Point, Correction Schemes Lattice Optimisation, Analysis, Correction Instabilities: standard checks, e-p work Collimation: outline designs, full simulations with activation Review all main systems Pull work together: comparisons Best lattice and ring size; RF and MMPS combinations Estimated losses and activation Started Next Uncertain Cover

Simulation Hardware SCARF: Linux only: Red Hat Enterprise 4.4 GNU, Intel, PGI compilers for Fortran, C, java AMD, Intel, ATLAS, Goto BLAS, BLACS, ScaLAPACK, FFTW libraries MPI is the parallel framework 3 main sections of cluster Can choose section or just submit Access by grid certificate Obtained from e-Science locally ORBIT MPI installed as a module Synchrotron Physics and Intense Beams Groups have purchased 17 nodes = 136 processors Will be available soon after 16th February Larger jobs possible using normal SCARF queues Will still maintain access to 16 processor development rig

Simulation Codes ORBIT MPI: Strip-foil injection, including painting and foil scattering RF focusing and acceleration Transport through various magnetic elements Longitudinal and transverse impedances Longitudinal, transverse, and three-dimensional space charge forces Collimation and limiting apertures Calculation of many useful diagnostic quantities Parallel version of ORBIT available on SCARF Set Development (Ben Pine): Parallel version of Set running on SCARF Currently 2D with space charge Work advancing on adding 2.5D Main goals this year: - Benchmarking against standards - Adding new 2D boundary conditions - Starting to think about full 3D And: Add other software Add other accelerator codes

Visualization e-Science Application Development Group Parallel visualization cluster Expertise in data mining, computational steering Could use existing tools if data put into nexus data format http://www.nexusformat.org/Main_Page Simulation hardware, code and visualization resources on site to do the world-class accelerator physics required for ISIS upgrades

(Grahame Rees, Ciprian Plostinar) 800 MeV H- Linac (Grahame Rees, Ciprian Plostinar) Design Parameters: Beam power for 2 MW, 30 Hz, 3.2 GeV RCS: 0.5 MW Beam pulse current before MEBT chopping: 43.0 mA Beam pulse current after MEBT chopping: 30.0 mA Number of injected turns for 370 m RCS: ~500 turns Beam pulse duration at the 30 Hz rep rate; ~700.0 μs Duty cycle for the extent of the beam pulse; ~2.1 % MEBT(in) normalised rms emittances: 0.25, 0.375 (π) mm mr MEBT(out) normalised rms emittances: 0.292, 0.42 (π) mm mr Cell equipartition transv/long phase shift ratios: 1.40

All options have the same 324 MHz, 74.8 MeV stage 1: Design Options All options have the same 324 MHz, 74.8 MeV stage 1: IEBT DTL MEBT RFQ 74.8 MeV Options F (MHz) Stage 2 Stage 3 Stage 4 1 648 ScL 1 ScL 2 ScL 3 2 648 CCL ScL 2 ScL 3 3 972 ScL d ScL e ScL c 4 324-?-972 ScL a ScL b ScL c ~200 MeV 800 MeV

Beam Envelopes for Option 2 DTL CCL (193 MeV) ScL (800 MeV)

800 MeV H- Linac Studies Still Needed MEBT comparisons Selection of option ScLa/b spoke cavities? Refine stage matchings Linac error effect study Effect of failed cavities Ring collimation line