Briefing on Proposed Amendments to Rules for Underground Storage Tank Management, Chapter 391-3-15 August 1, 2017.

Slides:



Advertisements
Similar presentations
Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
Advertisements

Environmental Protection Commission of Hillsborough County Rule Revision Update June 28, 2012.
Southwest District Storage Tanks Program presented by Leslie Pedigo Southwest District Storage Tanks Program presented by Leslie Pedigo.
Pesticide Container-Containment Regulations: FIFRA 19(f)(2) Determinations of Adequacy.
1 MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) PROGRAM Baseline Compliance Assessment 1 MassDEP 8/2/2011.
ACCA Legislative Conference Underground Storage Tank Compliance
Plans and Preparations for the PST Energy Act Investigations Texas Commission on Environmental Quality Environmental Trade Fair May 5-6, 2015.
MassDEP Underground Storage Tank Program Program Requirements for Third Party Inspectors Winter 2015 Workshops.
Reducing the Threat of Fuel Release from the Red Hill Fuel Storage Facility A Unique Engineering Challenge.
Staying in Compliance Dispensing Equipment Spill/Overfill Presented by B. J. Benton United Pump and Controls, Inc.
Idaho’s UST Program UST Program Summary  Fairly New Program  Energy Act of 2005  Statute Feb  Rules April 2008  State Program Approval.
Underground Storage Tank Compliance Act of 2005 Bill Torrey UST/LUST Regional Program Manager US EPA – New England EBCNE April 19, 2006.
Adem.alabama.gov ADEM Land Division Update Chip Crockett Chief, Industrial Hazardous Waste Branch Air & Waste Management Association Southern Section Pine.
WWQRR, Chapter 17, Section 44 Page  Have not performed tank leak detection in 60 days  Did not perform CP test within 90 days of due date 
Large-Scale Comprehensive Plan Amendment Adoption Hearing October 23,
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
PowerSouth Energy Cooperative:
1 Status of Ongoing Rulemakings and Safety Culture Update Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking OAS Annual.
SPCC & CCP Issues Jim Roewer APPA E&O Conference April 12, 2006.
Status of Ongoing Rulemakings OAS Annual Meeting August 29, 2012 Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking.
Getting The Most Out Of Release Detection Testing National Tanks Conference 2015 Phoenix, Arizona September 15,
PRODUCT LINE LEAK DETECTION (including a summary of the 2015 UST regulations) Katie Seaborn AMERICAN CONTAINMENT SERVICES, INC. ® Annual GTEC Underground.
Workshop on Permanent Closure of Single-Walled USTs and Funding Opportunities For Closure and Cleanup.
Staying in Compliance Inventory Control Bill Greer GTEC.
BY: Winston G. Smith Environmental Engineer UST/PCB & OPA Enforcement & Compliance Section EPA Region 4.
Joe Stapinski Senior UST Inspector (317)
Overview of 3 rd Party Inspection Program for USTs.
Staying in Compliance Dispensing Equipment Spill/Overfill Presented by Travis Benton United Pump and Controls, Inc.
1 1 Staying in Compliance: Spill and Overfill Presented by: Brent Roth OPW Retail Fueling IPECA UST Seminar 2015.
Release Reporting. How Do I Know If I Have a Leak in My UST System? 1. Unusual operating conditions; such as, erratic behavior of the dispensing pump.
EXCALIBUR GROUP, LLC Evolving Regulations for USTs in New York For New York State August 1, 2013.
Beth Blalock, Asst. Chief Land Protection Branch GEORGIA EPD LAND PROTECTION BRANCH UPDATE MARCH 2016.
1 Final Rulemaking - Chapter 245, Administration of the Storage Tank and Spill Prevention Program (Subchapters A-H) Environmental Quality Board Meeting.
Veeder-Root Company Presents: EPA Compliance Basics Presenters: Bill Tobias, Director of Sales, Veeder-Root Carlton Knowles, Territory Sales Manager, Veeder-Root.
Edward S. Kubinsky Jr. CROMPCO, LLC
UST Inspection Program
Major Changes Additional Updates
United Pump and Controls, Inc.
Using Data to Support Your Program and Tell Your Story
Release Reporting Lesson 17 covers the subject of Release Reporting. You will learn how you know when you have a leak and what leaks require reporting.
2007 EPA Region 4 – Department of Defense – States Environmental Conference June 21, 2007 Atlanta, Georgia.
Underground Storage Tanks New Federal 2015 Requirements
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Petroleum Storage Tanks – Program Updates
July 13, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
New Install Proposed rule changes
September 8, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
GTEC 2017 Annual UST Management & Compliance Assistance Seminar
Methane Emission Standards for Crude Oil and Natural Gas Facilities
Operator Training.
COMPLIANCE CHALLENGES FACING OWNERS OF UNDERGROUND STORAGE TANKS
Alabama Tools Seminars
2015 Federal UST Regulation Changes
Changes to Chapter , Florida Administrative Code Underground Storage Tank Systems (USTs) Effective – 1/11/2017.
Georgia Update Jeff Cown Land Protection Branch
Rulemaking and Readoption of 15A NCAC 02T .1500
Julie Woosley, Division of Waste Management
Temporary Rulemaking for 15A NCAC 02L Section .0400
NEW COMPLIANCE REGULATIONS
COMPLIANCE VIOLATIONS FOUND DURING INSPECTIONS
Julie Woosley, Division of Waste Management
Branch Organization Chuck Mueller, Branch Chief
Air and Water Management Association Regulatory Conference Symposium
RCRA Updates Larry L. Lamberth Enforcement and Compliance Branch
TCEQ’s PST Rulemaking: Adopted Rule Changes
Cupa violation Review BAESG Meeting May 20, 2019 Matthew Burge
Petroleum Storage Tank Rule Updates Complying with the new PST rules and changes to the PST Compliance Notebook Trade Fair 2018 Rebekah Stanush Compliance.
Petroleum Storage Tanks – Program Updates
Compliance Assistance Specialist
Presentation transcript:

Briefing on Proposed Amendments to Rules for Underground Storage Tank Management, Chapter 391-3-15 August 1, 2017

Purpose July 2015 – EPA published changes to the 1988 UST Regulation State Program Approval (SPA) requires adoption of federal requirements No less stringent requirement Incorporating by reference Deletion of past implementation deadlines Editorial and typographical corrections Two additional state-specific requirements

New FEDERAL requirements Three-year implementation timeframe for existing systems: Monthly Walkthrough Inspections Spill prevention and release detection (RD) equipment Annual walkthrough Inspections Containment sumps and hand-held RD equipment Release Detection Equipment Testing (annual) Spill Prevention Equipment Testing (triennial) or use double-walled spill bucket with interstitial monitoring Overfill Prevention Equipment Inspections (triennial) Containment Sump Hydrostatic Testing (triennial) or use a double-walled sump with interstitial monitoring Note: For new systems, the spill prevention testing, overfill inspections, and containment sump testing will be required upon installation.

New FEDERAL requirements Discontinuing use of ball floats for overfill prevention Testing after repairs Compatibility demonstration for biofuel blends Permanent closure of failing tanks with non- repairable internal liners Update Codes of Practice Removal of past deferrals for emergency generator tanks, field constructed tanks, and airport hydrant systems Secondary Containment and Interstitial Monitoring (effective since 2008 based on Energy Policy Act) Notification Requirements (effective since 2008 based on EPA Energy Policy Act) Some of the past deferral requirements will have a 2020 implementation deadline, the rest listed will be immediately effective

New STATE requirements Increase record retention timeframe for all records to 3 years Will primarily impact non-GUST facilities Revised deadline for Annual Tank Registration to December 31 (from September 1)

Implementation schedule

Implementation schedule

Implementation schedule

Milestone Schedule