CSFWG – Spectrum of Oversight (f) and Time Requirements (g) subgroup:

Slides:



Advertisements
Similar presentations
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
Advertisements

California Public Utilities Commission Residential Rate Structure Rulemaking R Workshop Overview Time Variant Pricing (TVP) Workshop Gabe Petlin.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
Resource Adequacy, Reliability, Risks and Markets October 9, 2006 Sean Gallagher California Public Utilities Commission Energy Division, Director.
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
Workshop for Proposed EPIC Triennial Plans Investor Owned Utility Programs July 31, 2014.
Renewable Net Short.
California Energy Commission Draft Rate Scenario Model Methodology DAWG Forecasting Subgroup Sept. 11, 2014 Lynn Marshall Supply Analysis.
Energy Storage R Energy Storage Procurement & Policy Options Arthur O’Donnell/Aloke Gupta/Elizaveta Malashenko Energy Division Grid Planning.
California Energy Action Plan Tim Tutt California Energy Commission Dan Adler California Public Utilities Commission June 24, 2004 Goal II – Accelerate.
Post 2012 Energy Efficiency Planning Schedule: Options and Implications February 16, am - 5 pm CPUC Auditorium.
Laura Doll Deputy Executive Director, CPUC October 18, 2006 Platt’s CA Power Market Forum C ALIFORNIA P UBLIC U TILITIES C OMMISSION Fulfilling Resource.
1 Connecting the Dots Edward Randolph Director, Energy Division California Public Utilities Commission Date (example: April 26, 2012)
Transmission Planning at the California ISO September 10, 2015.
0 Distributed Energy Resources: Going Small IEP 2015 Annual Conference September 30, 2015 Colin Cushnie V.P., Energy Procurement & Management Southern.
By Erik Takayesu, PE Director, Electric System Planning Southern California Edison More Than Smart Webinar August 4, 2015 Distribution Resources Plan.
MTS Working Group September 8, Introduction More Than Smart Mission – Enabling state integrated distribution grid efforts 1.Continue the work.
Utility Procurement: What’s Next? IEP 2015 Annual Conference
1 California Energy Commission April 27, 2015 Valerie Winn Chief, State Agency Relations Contingency Planning and Diablo Canyon Power Plant.
SDG&E Generation Additions Jim Avery Chief Development Officer.
MTS Working Group October 8, Introduction More Than Smart Mission – Enabling state integrated distribution grid efforts 1.Continue the work of.
Integration Capacity Analysis & Locational Net Benefits Analysis Working Groups Kick-off Meeting May 12, 2016.
Workshop: IOU Energy Storage Track 1, R July 28, 2015 Procurement Best Practices – Lessons Learned Consistent Evaluation Protocol – Identify.
MTS Working Group San Francisco F2F Agenda Mar. 23, 2015.
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Locational Net Benefit Analysis Working Group June 1, am – 3 pm Webinar drpwg.org.
Joint CPUC-CAISO Workshop: IOU Energy Storage Track 2, R May 2, 2016 STATION POWER Gabriel Petlin/ Manisha Lakhanpal Grid Planning and Reliability,
1 Distribution Resources Plan [R ] Locational Net Benefit Analysis (LNBA) and Demonstration Project A (Demo B) Workshop California Public Utilities.
Locational Net Benefit Analysis Working Group June 9, pm – 3:30 pm CPUC Golden Gate Room, San Francisco drpwg.org.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
Integrated Capacity Analysis Working Group June 1, am – 12 pm CPUC Hearing Room E drpwg.org.
Integrated Capacity Analysis Working Group June 9, am – 12 pm CPUC Golden Gate Hearing Room drpwg.org.
Joint CPUC-CAISO Workshop: IOU Energy Storage Track 2, R May 3, 2016 Multiple-Use Application of Energy Storage Systems Gabriel Petlin/ Manisha.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
1 CSFWG – Spectrum of Oversight (f) and Time Requirements (g) subgroup: Meeting 2 – Distribution Planning Group (DPRG) Structure and Time Requirements.
1 Integrated Capacity Analysis Working Group August 31, Frank H. Ogawa Plaza, Oakland, CA drpwg.org.
1 Integrated Capacity Analysis Working Group August 31, Frank H. Ogawa Plaza, Oakland, CA drpwg.org.
Locational Net Benefit Analysis Working Group
Locational Net Benefit Analysis Working Group
CPUC Supply-side Procurement Processes
LNBA Subgroup: Avoided Transmission Value
Integrated Capacity Analysis Working Group
Transmission-Distribution Interface Working Group Meeting
Pacific Coast Inter-Staff Collaboration Summit
Locational Net Benefit Analysis Working Group
Locational Net Benefit Analysis Working Group
August ICA Agenda Time Topic 8:00 – 8:15
SEIA Perspective on Marginal/Avoided CAISO Transmission Costs
Integrated Capacity Analysis Working Group
Locational Net Benefit Analysis Working Group
Integrated Capacity Analysis Working Group
Integrated Capacity Analysis Working Group
Integrated Capacity Analysis Working Group
Potential and Goals Primer
Subteam 1a Competitive Solicitations Framework Working Group Meeting
Integrated Capacity Analysis Working Group
August LNBA Agenda Time Topic 1:00 – 1:15
CPUC Rate Proceedings Relevant for TOU
SDG&E Procurement Perspective IEPA 35th Annual Meeting September 21st, 2016 Dan Skopec Vice President, Regulatory Affairs Sempra Energy Utilities.
Rule 21 Working Group 2 Issue 6 subgroup
Integrated Distribution Planning Process
Introduction to Growth Scenario Working Group
Integrated Capacity Analysis Working Group
SIWG CALL ISSUES 27 AND 28 APRIL 4,
SIWG CALL ISSUES 27 AND 28 APRIL 4,
ICA Methodology Clarifications ICA Working Group 5/18/2016
DER Growth Scenarios and Load Forecasts Working Group
California Transportation Electrification Activities
DC National Grid Modernization Trends NC DEQ Clean Energy Plan Workshop #3 April 22, 2019 Autumn Proudlove Senior Manager of Policy Research NC Clean.
Presentation transcript:

CSFWG – Spectrum of Oversight (f) and Time Requirements (g) subgroup: Roadmaps Documents Presented By: Zita Kline, Senior Analyst June 15, 2016

DRP/IDER Proceeding to Date DRP (distribution grid deferral) (R.14-08-013) ICA Demo A Rule 21 Fast Track LNBA Demo B, C, D, E IDER (DER sourcing) (R. 14-10-003) Cost Effectiveness Calculator IOU Solicitation Framework IOU Incentives Proposal IOU Incentives Pilot ? The Voice of Consumers, Making a Difference!

The Voice of Consumers, Making a Difference! DRP Proceeding Scope DRP (distribution grid deferral) ICA Demo A Rule 21 Fast Track PEV, ES, DR Microgrid integration LNBA Demo B DER Growth Scenarios Demo C, D, E DPRG CEC IEPR coordination CAISO TPP Coordination CPUC IRP/ Solicitation CPUC GRC Data Sharing The Voice of Consumers, Making a Difference!

Spectrum of Oversight - DPRG DPRG Activities Oversight ICA/LNBA Group (Identify DPAs) Distribution Planning Group (Identify deferral projects/features) Operations and Maintenance Group (Identify O&M deferrals) Circuit Reliability Improvement Group (includes Volt/VAR) Technical Expert Independent Evaluator Nonmarket Participants DPRG Market Participants? (J.Clinton) Commission Approval Application? Tier 3 Advice letter? (Florio Incentive Proposal) ACR ICA/LNBA DRP Guidance* ** * DRP Guidance, Attach. p. 12, (“The output of [phase 2a] will be “Distributed Energy Resource Development Zones” (could be Distribution Planning Areas) that can be associated with locational values. In these zones, additional DER portfolios would be defined using the process of value optimizations.) ** Projects Identified according to: deferral start date a) 1.5-3 year near-term forecast, b) 3-5 year intermediate-term forecast, c) 5-10 year long-term forecast and d) >10 year ultra-long term forecast . ACR ICA/LNBA (May 2, 2016), p. 28. Current distribution planning schedule (IOU Joint proposal)   The Voice of Consumers, Making a Difference!

Theoretical Structures for DER Procurement Framework Bundled Procurement Plan (BPP) (Biennial) Contract length > 5 years LNBA value largely T&D T&D Deferral RFO Application LNBA value largely NOT T&D Incorporate into existing RFOs Approval coincident with RFO outcome (Application) Contract length < 5 years Tier 3 Advice Letter Preapproved Use Cases TBD (Standard Pro Forma) Tier 1,2 Advice Letter Incorporate into existing RFOs? Approval coincident with RFO outcome (AL/ App.) DER Procurement Plan (Annual) - OR - Remaining process analogous to BPP but distribution deferral-specific. Decision points for the working group Annual v. biennial filing sufficient? Incorporate into BPP or separate filing. Is the distribution deferral significantly different than BPP? Incorporate a portion of distribution deferral into existing procurement process? What is the method for incorporating distribution deferral? The Voice of Consumers, Making a Difference!