Cornell Updates Commissioning of T-map for ILC single cell starts.

Slides:



Advertisements
Similar presentations
6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
Advertisements

KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
US Cavities Status and Plan Mark Champion 01 October 2009.
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Gradient Yield Rongli Geng Jefferson Lab ILC AD&I at DESY, May 28-29, 2009.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
9-cell cavity coordination CM Ginsburg 8 Mar
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
10/1/09 R.L. Geng ALCPG09, Albuquerque, NM 1 Cavity R&D Status and Future Plans - with a partial summary of SRF2009 Rongli Geng Jefferson Lab.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
Current study status of high gradient at KEK Fumio Furuta KEK SCRF meeting Fermilab. Apr
Americas S0 Cavity (Tesla-style) Test Philosophy and Test Status results from JLab, Cornell and FNAL C.M. Ginsburg (FNAL) GDE SCRF Meeting April 21, 2008.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
ILC 07 May 30-June 3, 2007 N.Solyak 1 MULTIPACTORING SIMULATIONS IN CAVITIES AND HOM COUPLERS Nikolay Solyak, Ivan Gonin, Jiajian Li Fermilab.
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
JLab Update Rongli Geng, Aril Palczewski, Yongming Li September 4, nd ILC Cavity Group Meeting.
FNAL SRF Program: 1.3 GHz Camille M. Ginsburg (FNAL) Fermilab Accelerator Advisory Committee November 7-9, 2011.
Plans for Gradient R&D and Cavity Processing and Testing in the Americas Region in FY08-09 Mark Champion 21 April 2008.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Recent FNAL/ANL Cavity Performance C.M. Ginsburg (FNAL) On behalf of the FNAL/ANL Cavity Crew TTC Meeting - Milano 28.Feb.-3.Mar
9-cell cavity coordination CM Ginsburg 15 Mar
JLab Update Rongli Geng, Ari Palczewski, Yongming Li December 11, rd ILC Cavity Group Meeting.
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Strategy and Status of Reference Cavities for European XFEL
Cornell Updates Series test of single cell is on going.
Motivation Vertical Electro-Polishing for high gradient cavity R&D.
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
ILC R&D Board Meeting: SRF Cavities Status and Plans
Cavity Gradient R&D Status and Future Plans for TDP-2
FNAL recent coupler troubles
Rongli Geng Jefferson Lab & GDE
for the FNAL/ANL, JLab, and Cornell cavity teams
WG-1 Session Cavity Performance Cryomodule Performance
Surface Analysis of the Quench Area Sample of Cavity Z111
S0 Status report from KEK
ILC Cavity & Cryomodule Overview
Production Cavities in progress
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Recent VT Results in the STF-2 cavities
WG3: Main Linac SCRF(cavity,cryomodule)
TTC topical-meeting on CW SRF 2013
TTC Meeting, 28 February - 2 March, 2011, Milan
Cavity Degradation Experience at S1-Global
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

Cornell Updates Commissioning of T-map for ILC single cell starts. 3-cell re-entrant is under prep. for VT. Flatness tuning done, VT is planed at end of this month. New VT insert w/ T-map for multi-cell is under assembly, commissioning will start next month.

Cornell Updates Initial test of T-map for ILC single by Sam One of the data analysis for two bords. iris equator iris *preliminary T-map data, not yet calibrated well. T-map system works well. Data calibration and analysis is on going. Additional test is planed for system commissioning.

Cornell Updates 3-cell re-entrant by Fumio History Plan Previous VT results of LR3-1, 14April2009 History Oct-Dec2008 Tumbling, 29Jan2009 VEP(200um),HT(800C x 2h), Micro-VEP, USC, HPR, 120C Bake, 15Apr2009 VT, Q-disease, 20May2009 HT (800C x 2h) again, cavity stuck with furnace and deformed when took out. Eacc=25.3MV/m Qo=2.0E+09 Plan > straighten cavity, done. > inspection, done. > Flatness tuning , done. > HPR + VT are planed to check the status. > additional process + VT. Flatness = 96%

Cornell Updates New VT insert w/ T-map for multi-cell by Mingqi. New insert Temp. shields T-map boards support

Fermilab S0 News TB9ACC015 TB9NR004 Limiting pit was tumbled away, ~18 MV/m -> ~35 MV/m Test Oct.27: 35 MV/m with Q0=1E10 Reaches ILC spec in gradient and Q0, but still high field emission Cavity was tested with add’l FE instrumentation (Faraday cup) as part of instrumentation development TB9NR004 First test after standard EP at FNAL/ANL facility Test Nov.1: 30 MV/m with Q0=1.2E10, also had significant FE present One1-cell for R&D, and one JLab beta=0.61 1-cell for PrX were tested No more 9-cell vertical tests until mid-January VTS upgrades and cryogenic system downtime started Limited 1-cell tests will be available at the A0 facility Processing continues to prepare (stack up) cavities for when VTS is back up Next cavities 8 ARRA Niowave-Roark 9-cells arrived late Oct; not through inspection yet Remaining 2 had equator weld blow-throughs which have to be repaired – plan underway 22.November 2011 Ginsburg FNAL S0 Report

JLab Status: 9-Cell Cavities DESY seamless 9cell#1 RF test following Ethanol rinsing and additional HPR Pi-mode quench limit 21 MV/m due to probably one defect in cell#4 7 out of 9 cell reached Pi-mode equivalent gradient in range of 33-42 MV/m Thermometry test next week JLAB LG#1 Medium Pressure Rinse (MPR) completed following local grinding at quench-causing defect in cell#6 (done in August at JLab by K. Watanabe and H. Hayano) Light EP next week ICHIRO 9-cell cavities ICHIRO8 vertical bead pull completed, tune for flatness is next, light EP before Christmas, vertical test in January 2012 MHI#8 and ICHIRO#7 are returned to KEK New 9-cell cavity fabrication (SLAC LSF shape) under way 11/21/2011, Rongli Geng 37th ILC Cavity Group Meeting

37th ILC Cavity Group Meeting JLab Status: Cryogenic Radiation Instrumentation & Dark Current Simulations Cryogenic radiation instrumentation KEK Si diodes validated and checked for sensor variability and sensitivity (with respect to the standard JLab VTA radiation detector) Dark current Simulations TESLA 9-cell models being looked at using Omega-3P and CST MWS Looking at peak electric field at HOM coupler tip among other things Track-3P to be used for simulation of field emitted electrons A. Palczewski Y.M. Li 11/21/2011, Rongli Geng 37th ILC Cavity Group Meeting