MFD Meeting Logistics The documents and schema used are available from the MFD page <http://www.pwg.org/mfd> The phone bridge will be the same as used.

Slides:



Advertisements
Similar presentations
Additional Supplements Presented By: Sugath Karunaratne, Software Trainer.
Advertisements

1Copyright © 2007, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. Imaging Device Security (IDS) Working Group Longmont, CO - PWG F2F Meeting June 25, 2008.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August 14, 2008 Camas, WA PWG F2F Meeting.
1Copyright © 2009 Printer Working Group. All rights reserved. 1 IPP Working Group Session 24 June 2009 Rochester, NY - PWG F2F Meeting.
1 Copyright © 2013 The Printer Working Group. All rights reserved. The Printer Working Group Working Group Name Month DD, 2011 City, State 1.
1Copyright © 2009, Printer Working Group. All rights reserved. MFD Meeting Agenda Monday 1:00-1:15 :Introductions, Assign Minute Taker(s) 1:15-2:15 :Discussion.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2009 Cupertino, CA PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2008 Lexington, KY PWG F2F Meeting.
1 Copyright © 2013 The Printer Working Group. All rights reserved. The Printer Working Group Semantic Model Working Group Camas, WA Daniel Manchala (Xerox)
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group June, 2009 Webster, NY PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2010 Scottsdale, AZPWG F2F Meeting.
1Copyright © 2009 Printer Working Group. All rights reserved. 1Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group Session.
1Copyright © 2008, Printer Working Group. All rights reserved. Imaging Device Security (IDS) Working Group Camas, WA - PWG F2F Meeting August 13, 2008.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group December, 2009 Austin, TX PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2009 Waikoloa, HI PWG F2F Meeting.
1Copyright © 2012, Printer Working Group. All rights reserved. Semantic Model Meeting Logistics The documents and schema used are available from the SM.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2011 Wailea, HI PWG F2F Meeting.
Social Bookmarking With del.icio.us del.icio.us Rob Barth Web 2.0 In The Know.
VSS – VENDOR SELF SERVICE Registration Guide. The first step of VSS Registration is to open and review the 3 documents linked on the Purchasing & Contracts.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group December, 2011 Austin, TX PWG F2F.
WRA INTRODUCTION TO WEB AUTHORING. HELLO, MY NAME IS: JOHN Basics Former PW Alum Really like tv, video games, and MSU sports and the Tigers.
Copyright © 2010 Pearson Addison-Wesley. All rights reserved. Chapter 12: Introduction to ASP.NET Programming the World Wide Web 2009 Fifth Edition by.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group April, 2009 Mount Laurel, NJ PWG F2F Meeting.
1Copyright © 2013, Printer Working Group. All rights reserved. Semantic Model Working Group Agenda February 6, 2013 El Segundo, CA PWG F2F Meeting Daniel.
14 – 19 Area Prospectus Pilot Meeting 7 January 2009.
1Copyright © 2012, Printer Working Group. All rights reserved. Semantic Model Meeting Logistics The documents and schema used are available from the SM.
Electronic Notetaking Template Use this electronic template to help you take notes to complete your assignment. First, save this document with a new descriptive.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group December, 2012 Irvine, CA PWG F2F.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group Decemberr, 2010 Irvine, CA PWG F2F Meeting.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group February, 2012 Irvine, CA PWG F2F.
Name:________________________ Phone:________________________ WEBSITE: _________________________________________ © Copyright 2014 WBNES.
1Copyright © 2010, Printer Working Group. All rights reserved. MFD Meeting Logistics The documents and schema used are available from the MFD page
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2010 Lexington, KY PWG F2F Meeting.
Title Name Teacher’s Last name - # Hour Date Due.
Introduction Introduction Task ProcessTask Process Resources Resources EvaluationConclusionEvaluationConclusion Copyright Laws/Plagiarism How to Hyperlink.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August, 2009 Redmond, WA PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August, 2010 Bagsværd, DenmarkPWG F2F Meeting.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2012 Redmond, WA PWG F2F.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February 7, 2008 Irvine, CA PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2011 Camas, WA PWG F2F Meeting.
Comprehensive Continuous Improvement Plan (CCIP)
MFD Meeting Agenda Tuesday
Semantic Model Meeting Logistics
MFD Meeting Logistics The documents and schema used are available from the MFD page The phone bridge will be the same as used.
PWG Plenary Status Report MFD Working Group
PWG Plenary Status Report Semantic Model Working Group
Power Hour April 2011 DITA and ePublisher
PWG Plenary Status Report MFD Working Group
PWG Plenary Status Report MFD Working Group
Call us HP Support Phone Number.
It’s Time for a Break!!!.
Introduction to E-learning.
PWG Plenary Status Report MFD Working Group
Semantic Model Working Group
PWG Plenary Status Report Workgroup for Imaging Management Solutions
Semantic Model Workgroup
Semantic Model Workgroup
PWG Plenary Status Report MFD Working Group
Plenary Status Semantic Model Workgroup
Semantic Model Workgroup
7th Grade Math Warm-ups Week of October 3-7, 2016.
7th Grade Math Warm-ups Week of October 24-28, 2016.
Semantic Model Working Group
Semantic Model Working Group
Semantic Model Working Group
Semantic Model Working Group
How to JOIN a MEETING via ZOOM
Reading STAAR Benchmark 8:00 AM- 11:15 AM
Presentation transcript:

MFD Meeting Logistics The documents and schema used are available from the MFD page <http://www.pwg.org/mfd> The phone bridge will be the same as used throughout the meeting Live meeting (Tues/Wed) will be available at <https://www.livemeeting.com/cc/xerox/join?id=N8PNWC&role=attend&pw=QqF26w_%60D> Unable to join the meeting? Follow these steps:  Copy this address and paste it into your web browser: https://www.livemeeting.com/cc/xerox/join Copy and paste the required information: Meeting ID: N8PNWC Entry Code: QqF26w_`D Copyright © 2009, Printer Working Group. All rights reserved.

MFD Meeting Agenda Tuesday 9:00-9:15 : Introductions, Assign Minute Taker(s) 9:15-10:30 : Detailed review of Overall MFD specification <ftp://ftp.pwg.org/pub/pwg/mfd/wd/wd-mfdoverallmod10-20091201.pdf> 10:30-10:45: Break 10:45-12:00: High level review of the FaxOut specification <ftp://ftp.pwg.org/pub/pwg/mfd/wd/wd-mfdfaxoutmodel10-20100126.pdf> 1:15-2:45: Detailed review of Copy Service specification <ftp://ftp.pwg.org/pub/pwg/mfd/wd/wd-mfdcopymodel10-20100102.pdf> Copyright © 2009, Printer Working Group. All rights reserved.

MFD Meeting Agenda Wednesday 9:00-9:40 : Discussion of goal for the MFD modeling effort <ftp://ftp.pwg.org/pub/pwg/mfd/white/GoalForTheMFDModelingEffort20100114.pdf> 9:40-10:20 : Discussion of MFD System Service 10:20-10:30 : Next Steps Copyright © 2009, Printer Working Group. All rights reserved.