Fabrication of Boilers and Pressure Vessels ZOYEB BATLIWALA SIR PADAMPAT SINGHANIA UNIVERSITY
PERFECT ENGINEERING & ALLIED WORKS PVT. LTD. LOCATION HISTORY, Reference page 1 FACILITIES, Reference page 4 WORK FORCE, Reference page 8
Rotocone Vacuum Dryers PRODUCTS: Rotocone Vacuum Dryers Activated Carbon Adsorber Heat Exchangers Reference : page 3 of report
CLIENTELE:
MY WORK Study and use of Codes and Standards Essential fabrication techniques On-field observation of fabrication and inspection processes Fabrication Drawings with basic design calculations Reference : page 2 of report
ASME BOILER AND PRESSURE CODE (BPVC) SECTION II MATERIALS Part A Ferrous Material Specifications Part B Nonferrous Material Specifications Part C Specifications for Welding Rods, Electrodes and Filler Metals Part D Properties (Customary) Part D Properties (Metric) Reference : page 43 | Appendix A of report
SECTION V NONDESTRUCTIVE EXAMINATION Radiography Examination Ultrasonic Examination Liquid Penetrant Examination Magnetic Particle Examination Eddy Current Examination Acoustic Emission Examination
SECTION VII RULES FOR CONSTRUCTION of PRESSURE VESSELS Division 1 Division 2 Alternative Rules Up to 70MPa Division 3 Alternative Rules for construction of high pressure vessels Above 70Mpa Up to 20MPa Widespread use No stress analysis SECTION VII RULES FOR CONSTRUCTION of PRESSURE VESSELS
SECTION IX WELDING & BRAZING QUALIFICATIONS 1. Relates the qualifications of welders and welding operations, brazers and brazing operations and procedures. 2. Establishes basic criteria for welding — weld orientations, tests and examinations, braze orientations and various tests. 3. A welding operation may be qualified mechanical, bending tests, and radiography, unlike brazing.
ASME/ANSI B16 : STANDARDS OF PIPE AND FITTINGS Reference : page 21 of report
WORK DONE Study and use of Codes and Standards Essential fabrication techniques On-field observation of fabrication and inspection processes Fabrication Drawings with basic design calculations Reference : page 2 of report
BUFFING/FINISHING/POLISHING Abrasive/work-wheel Polishing and buffing differences Reference : page 23 of report
WELDING GTAW, TIG MMAW, SMAW
STRESS RELIEVING FURNACE Fe–C Equilibrium Diagram Reference : page 18 of report
WORK DONE Study and use of Codes and Standards Essential fabrication techniques On-field observation of fabrication and inspection processes Fabrication Drawings with basic design calculations Reference : page 2 of report
FABRICATION PROCESS
WORK DONE Study and use of Codes and Standards Essential fabrication techniques On-field observation of fabrication and inspection processes Fabrication Drawings with basic design calculations Reference : page 2 of report
NON-DESTRUCTIVE TESTS NDTs Volumetric techniques Radiography Test Ultrasonic Test Acoustic Test Surface/sub-surface techniques Magnetic Particle Test Eddy Current Test Surface techniques Visual technique Liquid penetration technique Reference : page 24 of report
WORK DONE Study and use of Codes and Standards Essential fabrication techniques On-field observation of fabrication and inspection processes Fabrication Drawings with basic design calculations Reference : page 2 of report
ASSIGNMENTS Made basic design calculations as per ASME SECTION VIII Division 1 and made fabrication drawings on CAD of the following equipment: UH-25 scrubber (Satish Dhawan Space Centre, Sriharikota) b) ECR proton source LCW holding tank (Bhabha Atomic Research Centre, Mumbai) c) Isrosene storage tank (ISRO Liquid Propulsions Systems Centre, Mahendragiri)
CONCLUSION Engineering problem solving skills The ASME BPVC is a very comprehensive code PV Elite, which has pre-feeded standardized values : Reference, page 37 Testing, Inspection and Certification (TIC) purpose A project requires thorough co-operation from all departments No single NDT technique serves all the purpose. Promoting sustainable development