Alignment and stability session

Slides:



Advertisements
Similar presentations
October 21, 2005 Internal LCLS Undulator Alignment and Motion Review Georg Gassner, SLAC / MET 1 HLS Monitoring System Georg.
Advertisements

Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
Sta bilization of the F inal F ocus : Stabilization with Nano-Meter Precision.
Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 Plans for first installation 30 June to 19 July 2009.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
ATF2 week meeting: Impact of cooling water on the final doublets vibrations Benoît BOLZON Laboratories in Annecy working on Vibration Stabilization 15/10/08.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Tue 22 Sept 2009 Stabilization Day 7 Oxford MONALISA 1 MONALISA update Could the messenger of bad vibration news be the cause of it? beam pipe Shintake.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
Update of the ground motion generator of A. Seryi for ATF2 thanks to ground motion measurements in the ATF2 beam line 1 Benoît BOLZONATF2 software task.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
Alignment and Beam Stability
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
Installation of HLS at the ATF2 Mika Masuzawa, Masanori Satoh and Ryuhei Sugahara (KEK) Georg Gassner and Robert Ruland (SLAC) 1.Motivation 2.What is HLS?
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,
New IP chamber for ATF2 goal 2 Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4.
MONALISA an Update David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
Stabilization of Focus at ATF2 David Urner University of Oxford.
BPM support and beam pipe length FD support status A.Jeremie.
MONALISA David Urner Oxford University. Straightness Monitor Build from Distance Metres Decision taken this workshop to move from existing extraction.
Update of a ground motion generator to study the stabilisation usefulness of ATF2 final focus quadrupoles 1 Benoît BOLZON B. Bolzon, A. Jeremie (LAPP)
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
How high frequency we care if we need the stabilization of 1nm level?
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
MONALISA Update David Urner ATF2 Meeting Dec
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
ATF2 weekly meeting 4 July 2007 MONALISA: Attachment of Vacuum Vessels for ATF2 David Urner.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
Progress of Shintake Monitor (ATF2 IP-BSM) KEK site meeting 2008/10/31 Takashi Yamanaka.
Vibration measurements with and without Monalisa 15/07/09 Benoît BOLZON (LAPP) David Urner (Oxford) Paul Coe (Oxford) 1 Benoît BOLZON.
FF Stabilisation A.Jeremie (Summary of things learned and work done at LAPP, CERN, SYMME, Oxford, SLAC)
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
David Urner Oxford University/JAI
Summary FD Support System
Tolerances & Tuning of the ATF2 Final Focus Line
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy, C.Girard, (G.Gaillard)
3: ISI ASCR, Brno University of Technology, Brno, Czech Republic
Laboratories in Annecy working on Vibration Stabilization
ATF2: final doublet support
Alignment Results of Magnets in the ATF2 Beam Line
David Urner Paul Coe Matthew Warden Armin Reichold Oxford University
ATF2 IP Tuning Task Simulation Updates
ATF2 review R. Tomas ATF2 review web:
The Storage Ring Control Network of NSLS-II
A.Jeremie, B.Bolzon, N.Geffroy
Final Focus Optics Test at ATF
IP configuration session
Presentation transcript:

Alignment and stability session A.Jeremie (Sugahara-san KEK convener)

Outline Alignment and Stability 13:30 Alignment results of ATF2 beam line Ryuhei Sugahara (KEK) 13:50 Short report on FD magnet alignment Nobuhiro Terunuma (KEK) 14:00 Installation of HLS at the ATF2 Mika Masuzawa (KEK) 14:20 GM generator for ATF2 Benoit Bolzon (LAPP) 14:45 Short report on Monalisa measurements David Urner (University of Oxford)

• Alignment was performed with a Laser Tracker, a Leveling telescope and an Electrick Level • Magnetic field of QEA-mag were all measured at KEK, and their offsets, dX and dY, and Roll Angle were measured and recorded. Those errors were corrected in the alignment Sugahara-san

• Alignment for ATF2 magnets have been carried out, and have resulted alignment errors of 0.081mm for X, 0.121mm for Y and 0.080mm for Height in RMS • Current ATF2 beam line has an angle of 48 rad to the Y-axis • Only the last magnet, QD02A, needs to be improved in Y position Sugahara-san dX_summary

Terunuma-san

Terunuma-san

Alignment of SLAC QDs and SXs will be tried soon. Terunuma-san

Hydrostatic Leveling System Introduction The proposed Hydrostatic Leveling System (HLS) determines height differences between points. The disadvantage of using the equipotential surface as a reference is that the earth surface itself is not stable but in constant motion. Earth tides due to sun and moon Up to 30mm for a 130 m long undulator Can be modeled Ocean tide loading and atmospheric loading Can reach up to 30 mm Can’t be easily modeled Advantages: No direct line of sight needs to exist Not affected by optical refraction High accuracy Fully automated In-situ calibrating Equipotential surface is the reference Absolute measurements before beam based alignment SLAC team (G. Gassner & R.Ruland) kindly agreed to collaborate with us on HLS. 8th ATF2 Project Meeting June 9,2009 Masuzawa -san

8th ATF2 Project Meeting June 9,2009 Possible Installation locations: Plan A & B A: On top of the magnets Potential to connect the ATF and ATF2 Beam lines smoothly. B: On the concrete support 8th ATF2 Project Meeting June 9,2009 Masuzawa -san

8th ATF2 Project Meeting June 9,2009 Proposal (has not been approved yet) 31 m Access to/from the beam line Final Focus Q ATF2 ATF Plan D Plan C Plan C&D short span 8th ATF2 Project Meeting June 9,2009 Masuzawa -san

B.Bolzon GM generator A generator has been made in the past to simulate spatial and temporal properties of ground motion [A. Seryi, O. Napoli, “Influence of ground motion on the time evolution of beam in linear colliders”, DAPNIA/SEA, 95-04, August 1995]. Input parameters of this generator can be updated to fit measurements done on various sites in the world. Thanks to new measurements done in the ATF2 beam line with CMG-40T geophones and ENDEVCO 86 accelerometers, these parameters have been updated for ATF2 simulations. Relative beam motion due to all QFF motions Relative beam motion due to each QFF motion Beam relative motion to IP due to jitter of all FF quads almost within tolerances for 5% error on beam size measurements and high ATF2 GM Necessity to look at beam relative motion due to jitter of all quads

Integrated RMS of absolute/relative motion vs distance B.Bolzon Integrated RMS of absolute/relative motion vs distance Increase of relative motion with increase of distance up to 190nm at 45m (absolute motion of about 240nm) Very good agreement simulations /measurements for each distance Confirmed the quality of the parameter tuning Below 4m, measured and theoretical RM overestimated due to very high SNR needed and lower correlations than in reality (measurements) 12

Shintake Monitor mounting plate Calibration Study “Calibration” = Where are these components located on their mounting plate? Shintake Monitor mounting plate mounting plate QD0 What is the effect of calibration errors? a scale error in displacement measurements Simulated a “minimal” calibration scenario: e.g vibrations with amplitude 1μm would be limited in reconstructed accuracy to 3nm from calibration a long-term shift of 100 μm would be limited in reconstructed accuracy to 300nm 1mm uncertainty in component locations 0.3% scale error for vertical motion D.Urner

Plan Test vacuum and pressure feedback in Oxford next week Ship entire system to KEK to arrive by July1. Attach MONALISA system to the table: July 7th to 9th. Vibration measurements: July 9th to 15th. Detach MONALISA system from the table: July 15th to 17th. Store MONALISA system at KEK until final installation later this year or beginning of next year. Double bellow system D.Urner

Conclusion Great care has been taken for the alignment of magnets; still one or two magnets to finalize alignment FD alignment and 3 FF sextupoles to be aligned with new instrument HLS system: do we install or not? When do we need to decide? GM generator updated for simulation; FF magnets do not need stabilisation; at short distance, the simulation underestimates correlation Monalisa plans to test set up in ATF2 beginning of July: schedule tight!