CMS DAQ project at Fermilab

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

Slice Test DAQ. Two Systems Underway There are essentially two systems being designed concurrently: Trackfinder test, and EMU slicetest. Goals of the.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Remigius K Mommsen Fermilab A New Event Builder for CMS Run II A New Event Builder for CMS Run II on behalf of the CMS DAQ group.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. The Power of Data Driven Triggering DAQ Topology.
Fermilab Fermilab Scientific Computing Division & Computing Enabling Technologies Department, Fermi National Accelerator Laboratory, Batavia, Illinois,
K. Honscheid RT-2003 The BTeV Data Acquisition System RT-2003 May 22, 2002 Klaus Honscheid, OSU  The BTeV Challenge  The Project  Readout and Controls.
Hall D Trigger and Data Rates Elliott Wolin Hall D Electronics Review Jefferson Lab 23-Jul-2003.
TB2004 DAQ Code Development Status & Prospect. July 1, 2004TB2004 DAQ Code Development2 Contents 1.TB status –run control –peripheral/FED crate –DAQ column.
A TCP/IP transport layer for the DAQ of the CMS Experiment Miklos Kozlovszky for the CMS TriDAS collaboration CERN European Organization for Nuclear Research.
Boosting Event Building Performance Using Infiniband FDR for CMS Upgrade Andrew Forrest – CERN (PH/CMD) Technology and Instrumentation in Particle Physics.
The Run Control and Monitoring System of the CMS Experiment Presented by Andrea Petrucci INFN, Laboratori Nazionali di Legnaro, Italy On behalf of the.
ILC Trigger & DAQ Issues - 1 ILC DAQ issues ILC DAQ issues By P. Le Dû
VLVNT Amsterdam 2003 – J. Panman1 DAQ: comparison with an LHC experiment J. Panman CERN VLVNT workshop 7 Oct 2003 Use as example CMS (slides taken from.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
Dynamic configuration of the CMS Data Acquisition Cluster Hannes Sakulin, CERN/PH On behalf of the CMS DAQ group Part 1: Configuring the CMS DAQ Cluster.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
Pierre VANDE VYVRE ALICE Online upgrade October 03, 2012 Offline Meeting, CERN.
EPS 2007 Alexander Oh, CERN 1 The DAQ and Run Control of CMS EPS 2007, Manchester Alexander Oh, CERN, PH-CMD On behalf of the CMS-CMD Group.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
CMS ROC Report Patricia McBride May 26, 2005.
HTCC coffee march /03/2017 Sébastien VALAT – CERN.
Detector Control System
Slow Control and Run Initialization Byte-wise Environment
Slow Control and Run Initialization Byte-wise Environment
MPD Data Acquisition System: Architecture and Solutions
The CMS High-Level Trigger
Controlling a large CPU farm using industrial tools
RT2003, Montreal Niko Neufeld, CERN-EP & Univ. de Lausanne
ProtoDUNE Installation Workshop - DAQ
PXD ATCA DAQ for DESY Test
mmDAQ (Muon Atlas MicroMegas Activity – ATLAS R&D)
Commissioning of the ALICE HLT, TPC and PHOS systems
CMS DAQ Event Builder Based on Gigabit Ethernet
DAQ upgrades at SLHC S. Cittolin CERN/CMS, 22/03/07
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
CMS High Granularity Calorimeter (HGCAL) Beam H2 2017
Toward a costing model What next? Technology decision n Schedule
M. Gulmini, G, Maron, N. Toniolo, L. Zangrando
LHC Collisions.
The LHCb Event Building Strategy
Characterization and test beam results of novel triple-GEM
CERN, the LHC and the Grid
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
The First-Level Trigger of ATLAS
Regional Cal. Trigger Milestone: Production & Testing Complete
Example of DAQ Trigger issues for the SoLID experiment
LHCb Trigger and Data Acquisition System Requirements and Concepts
RPC Detector Control System
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
M. Krivda for the ALICE trigger project, University of Birmingham, UK
John Harvey CERN EP/LBC July 24, 2001
Hall D Trigger and Data Rates
A Fast Hardware Tracker for the ATLAS Trigger System
LHCb Trigger, Online and related Electronics
ALICE Data Challenges Fons Rademakers Click to add notes.
RPC Detector Control System
The Trigger Control System of the CMS Level-1 Trigger
Plans for the 2004 CSC Beam Test
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

CMS DAQ project at Fermilab Ichiro Suzuki CD/CEPA/OAA Fermi National Accelerator Laboratory CD status report, 2003/03/26

CMS Experiment CMS (Compact Muon Solenoid) One of four experiments at CERN/LHC (Others are ATLAS, ALICE and LHC-B) Ready for collisions in 2007

CMS DAQ System Input: 100kHz Output: 100Hz Building events of 1MB from 500 x 2kB fragments 'Slice'd design A 'slice' is a 64x64 switching event builder (EVB) Eight 'slice's work in parallel

Event Manager Event control and tracking unit One for each 'slice' Receiving trigger information from the GTP (global trigger processor) and propagate it to RUs (Readout Units, input side nodes of the switch) Managing/tracking events in the system One for each 'slice' Responsibility of Fermilab-MIT group

US-CMS Slice Test A full-chain readout test in surface building (experimental area is under ground) at CERN Small parts of HCAL and EMU detectors (both detectors are US's main contribution) + Mini-DAQ Proving completion of US detector construction projects Planned in 2004

The EVM Project Two goals: The FNAL EVM Test Bench Development of the EVM Supporting US-CMS DAQ developments for the slice test The FNAL EVM Test Bench Small cluster of PCs and network switches working as a mini-scale DAQ A test stand for EVM development An event builder for sub-detector (HCAL, EMU) readout front-end

Current Activities Benchmark test of the CERN EVB software EVM specific add-on to the EVB Reliable broadcast library Java EVB control library Dummy GTP (trigger unit) HCAL beam-test DAQ support Modification of the EVB software Software integration help EMU beam-test DAQ support Housing the EMU front-end crate in the EVM test bench Software integration help

Plan HCAL + EMU beam test support: '03 Q2 Development of the slice test DAQ: '03 Slice test DAQ integration: '04 US-CMS slice test at CERN: '04 Q4 EVB benchmarks and improvements: '03 Q2-3 EVM study for better traffic control: '03 - '04 CMS DAQ commissioning: '05 - CMS data taking: '07

People V. O'Dell (FNAL/PPD): Project manager I. Suzuki (FNAL/CD): EVM R&D Test bench sysadmin EVB improvement EVM software Beam test DAQ support D. Charak (FNAL/CD): EVM R&D Dummy trigger processor K. Sumorok (MIT): Supervision,Documentation