Case Study 1 Problem 5 Styner/Lauder Intersection Moscow, Idaho.

Slides:



Advertisements
Similar presentations
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Advertisements

Capacity, Level of Service, Intersection Design (1)
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
Chapter 14: Basic Freeway Segments and Multilane Highways
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Capacity Analysis CE 453 Lecture #14.
2/8/2006Michael Dixon1 CE 578 Highway Traffic Operations AASHTO Grades.
Case Study 4 New York State Alternate Route 7. Key Issues to Explore: Capacity of the mainline sections of NYS-7 Adequacy of the weaving sections Performance.
CE 578 Highway Traffic Operations Lecture 4: HCM Directional Analysis.
HCM 2010: TWO-LANE HIGHWAYS PRAVEEN EDARA, PH.D., P.E., PTOE UNIVERSITY OF MISSOURI - COLUMBIA
CE 578 Highway Traffic Operations Lecture 7: Two-lane highway performance.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
CE 578 Highway Traffic Operations Lecture 4: HCM Directional Analysis.
CEE 320 Fall 2008 Course Logistics HW3 and HW4 returned Midterms returned Wednesday HW5 assigned today, due next Monday Project 1 due Friday.
2/27/06Michael Dixon1 CE 578 Highway Traffic Operations Lecture 16: Freeways Basic Sections.
Chapter 241 Chapter 25: Analysis of Arterial Performance Know how arterial LOS is defined Be able to determine arterial classes Know how to determine arterial.
3/1/06Michael Dixon1 CE 578 Highway Traffic Operations Lecture 17: Freeways Basic Sections Application.
Highway Capacity Software (HCS) – Part II
Lec 5: Capacity and LOS (Ch. 2, p.74-88)
CEE 320 Fall 2008 Course Logistics Course grading scheme correct Team assignments posted HW 1 posted Note-taker needed Website and Transportation wiki.
Design Speed and Design Traffic Concepts
CEE – Spring 2005 Lectures 10 to 11 (Chapters 21, 22) Analysis of Signalized Intersections.
Level of Service Section 4.5. Level of Service: The Basics MMeasure performance by density. RRatio of operating capacity to speed. UUnits: passenger.
CE 578 Highway Traffic Operations Introduction to Freeway Facilities Analysis.
Lec 17, Ch.9, pp : Capacity of freeway sections (objectives) Understand capacity and level of service are the heart of transportation analyses Understand.
Simpson County Travel Demand Model Mobility Analysis November 7, 2003.
Freeway Capacity Analysis
Case Study 1 Styner/Lauder Intersection Moscow, Idaho.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
Chapter 13: Weaving, Merging, and Diverging Movements on Freeways and Multilane Highways Chapter objectives: By the end of these chapters the student will.
Problem 1: Determination of Facility Types for Analysis.
Problem 4: Okeechobee Road Stopped Control Analysis.
1 Methods to Assess Land Use and Transportation Balance By Carlos A. Alba May 2007.
Interactive Highway Safety Design Model (IHSDM) By Josh Hinds.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
Case Study 1 Problem 3 Styner/Lauder Intersection Moscow, Idaho.
Chapter 9 Capacity and Level of Service for Highway Segments
HCM 2010: FREEWAY FACILITIES PRAVEEN EDARA, PH.D., P.E., PTOE UNIVERSITY OF MISSOURI - COLUMBIA
1 Element 1: The Systemic Safety Project Selection Process Element 1: 4-Step Project Selection Process.
The New 2010 Highway Capacity Manual An Overview.
1 The Highway Safety Manual Predictive Methods. 2 New Highway Safety Manual of 2010 ►Methodology is like that for assessing and assuring the adequacy.
Case Study 4 New York State Alternate Route 7 Problem 2.
Nixon Road Corridor Study: Findings & Options
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
The I-465 West Leg Reconstruction Project
“Bringing Back-of-the-Envelope Back”
Segment Crash Analysis
Case Study 4 New York State Alternate Route 7 Problem 4
Network Attributes Calculator
Multilane Highway Capacity Analysis
Transportation and Traffic Engineering Fundamental parameters
2a. Fully actuated signal - Improved T intersection
Macroscopic Speed Characteristics
Chapter 4. Modeling Transportation Demand and Supply
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
Tasnim Rabee’ Nagham Dmaidi
Freeway Capacity and Level of Service
FM 518 By-pass Traffic Review
Chapter 3. Highway Design for Performance
Highway capacity and Level of Service Analysis
Ventura County Traffic Model (VCTM) VCTC Update
Transportation Engineering LOS on other roadway types March 4, 2011
Problem 5: Interstate 87 Interchange
CE 3500 Transportation Engineering Saturation flow and signal LOS
Problem 3: Shenendehowa Campus
Problem 5: Network Simulation
HIGHWAY CAPACITY & LEVEL OF SERVICE (LOS)
Case Study 1 Problem 2 Styner/Lauder Intersection Moscow, Idaho
Transportation Engineering Calculating Signal Delay February 23, 2011
Broward County Congestion Assessment
Presentation transcript:

Case Study 1 Problem 5 Styner/Lauder Intersection Moscow, Idaho

Problem 5: U.S. 95 South of Moscow How will U.S. 95 operate in the future? 1100 veh/hr in PM peak 700 trips from new development 400 trips from hamlet

Problem 5: U.S. 95 South of Moscow How should this problem be defined and analyzed?

Problem 5: U.S. 95 South of Moscow What are the possible options? What analysis plan should be followed? Existing analysis of 10-mile segment Future analysis of 10-mile segment Analysis of 10-mile segment with bypass

Sub-problem 5a: Existing Analysis of 10-Mile Segment of U.S. 95 What data are required for analysis? What other factors should be considered? What measure should be used to determine the performance of the facility?

Sub-problem 5a: Existing Analysis of 10-Mile Segment of U.S. 95 What data are required for analysis? ADT = 600 veh/hr Shoulder widths = 6 ft Lane widths = 12 ft Directional split = 54/46 PHF = 0.88 %trucks/buses = 10% Free flow speed = 60 mph %no pass zones = 30 2 access points/mile

Sub-problem 5a: Existing Analysis of 10-Mile Segment of U.S. 95 What other factors should be considered? Class I facility What measure should be used to determine the performance of the facility? Travel speed Percent time following Results 52.4 mph 55.7% time following LOS = C

Sub-problem 5b: Future Analysis of 10-Mile Segment of U.S. 95 With Direct Recognition of the Hamlet Consider these issues What can be done to assess the future performance characteristics of the one-mile section of U.S. 95 that passes through the hamlet? How can the estimated performance characteristics of the section of U.S. 95 that is within the hamlet be incorporated into an overall assessment of the 10-mile segment?

Sub-problem 5b: Future Analysis of 10-Mile Segment of U.S. 95 With Direct Recognition of the Hamlet Consider these issues What can be done to assess the future performance characteristics of the one-mile section of U.S. 95 that passes through the hamlet? How can the estimated performance characteristics of the section of U.S. 95 that is within the hamlet be incorporated into an overall assessment of the 10-mile segment?

Sub-problem 5b: Future Analysis of 10-Mile Segment of U.S. 95 With Direct Recognition of the Hamlet Here are some issues to consider as you proceed with the analysis of the future conditions. What volumes should be used in the future conditions analysis? What additional assumptions are necessary for the analysis? What common measure should be used to determine the performance of the facility throughout the various sections?

Sub-problem 5b: Future Analysis of 10-Mile Segment of U.S. 95 With Direct Recognition of the Hamlet Input data: Volumes? Other factors?

Sub-problem 5b: Future Analysis of 10-Mile Segment of U.S. 95 With Direct Recognition of the Hamlet The HCM procedure assumes rank 1 movements do not yield to lower-ranked movements. Why, then, is delay reported for the NB and SB through- and right-turn movements?

Sub-problem 5b: Future Analysis of 10-Mile Segment of U.S. 95 With Direct Recognition of the Hamlet Overall assessment: one approach

Sub-problem 5c: 10-Mile Analysis with a By-Pass

Sub-problem 5: Discussion What have we learned in this problem? The existing HCM procedure for two-lane highways has some limitations An alternative methodology might provide important insights The results may be useful in determining the proper course of action