Marcel Stanitzki Rutherford Appleton Laboratory

Slides:



Advertisements
Similar presentations
A MAPS-based readout of an electromagnetic calorimeter for the ILC Nigel Watson (Birmingham Univ.) Motivation Physics simulations Sensor simulations Testing.
Advertisements

R Frey SiD at SLAC 16Dec DBD Planning: ECal LOI section still a good starting point Guiding principles based on optimizing physics performance constrained.
CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
SPIDER Silicon Pixel Detector R&D  Birmingham University (N. Watson, J. Wilson, R. Staley), Bristol University (J. Goldstein, D. Cussans, R. Head, S.
UK CALICE plans Birmingham, Cambridge, Imperial, Manchester,RAL,RHUL,UCL.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Thursday, May 10th, 2007 Calice Collaboration meeting --- A.-M. Magnan --- IC London 1 Progress Report on the MAPS ECAL R&D on behalf of the MAPS group:
RAL, 25-Jan-2005Nigel Watson / CCLRC-RAL PPD CALICE Calorimetry for LC  Physics motivation  Calorimetry  Design Considerations  CALICE  Status  Future.
20 Sep 2007Paul Dauncey1 CALICE beam tests Fantastically successful beam test at CERN this summer Yoshi will give a report on this shortly UK easily pulled.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
CALICE-UK Status Marcel Stanitzki Rutherford Appleton Laboratory.
PASI 2013, 3 rd – 5 th April 2013, RAL 03-Apr-2013Fergus Wilson, STFC/RAL1 UK Silicon Digital Calorimetry.
M. Tyndel, SPIDER proposal 1Aug 7 th, phone Schedule and resources  SPIDER has been streamlined to cover:  1) 1 submission ‘small pixel’ ISIS (vertexing/tracking.
31 October 01Plans for ECAL Involvement Plans for UK involvement in ECAL (CALICE) Paul Dauncey Imperial College z Status of (non-UK) ECAL work z What is.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
7 Apr 2010Paul Dauncey1 Tech Board: DECAL beam test at DESY, March 2010 Paul Dauncey.
23 Apr 2008Paul Dauncey1 Future proposal possibilities Paul Dauncey.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
Lepton Collider Increased interest in high energy e + e - collider (Japan, CERN, China) STFC funded us for £75k/year travel money in 2015 and 2016 to re-
16 Sep 2009Paul Dauncey1 DECAL beam test at CERN Paul Dauncey for the CALICE-UK/SPiDeR groups: Birmingham, Bristol, Imperial, Oxford, RAL.
GLD Calorimetry 2005/Mar/03 K. Kawagoe / Kobe-U. Introduction Current design –To be optimized for Particle Flow Algorithm (PFA) aiming at 30%/sqrt(E)
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
UK Activities on pixels. Adrian Bevan 1, Jamie Crooks 2, Andrew Lintern 2, Andy Nichols 2, Marcel Stanitzki 2, Renato Turchetta 2, Fergus Wilson 2. 1 Queen.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
HV-HR CMOS activity in Glasgow TCAD simulations of TowerJazz HR-CMOS sensors Characterisation of AMS350nm HV-CMOS pixels & strips R. Bates, C. Buttar,
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
A MAPS-based readout for a Tera-Pixel electromagnetic calorimeter at the ILC Marcel Stanitzki STFC-Rutherford Appleton Laboratory Y. Mikami, O. Miller,
Jan p 11 The aims of the meeting are to prepare ourselves for interacting with STFC as the situation unfolds. Specifically: Review and summarise.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Monolithic and Vertically Integrated Pixel Detectors, CERN, 25 th November 2008 CMOS Monolithic Active Pixel Sensors R. Turchetta CMOS Sensor Design Group.
CARE08 Dec 2008Jean-Sebastien GraulichSlide 1 MICE, a facility for precision beams and muon cooling o MICE in EuCARD o MICE Facility: Beam, Infrastructure.
TORCH IOP meeting Manchester March 31, 2015 TORCH Maarten van Dijk On behalf of the TORCH collaboration (CERN, University of Oxford,
1. 2  42 people for the meeting is nice and it shows how spirited active we are.  It shows to the outside world the level of activities  Everybody.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
Advanced Monolithic Active Pixel Sensors with full CMOS capability for tracking, vertexing and calorimetry Marcel Stanitzki STFC-Rutherford Appleton Laboratory.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
14.4. Readout systems for innovative calorimeters
SVT – SuperB Workshop – Annecy March 2010
Final CALICE OsC meeting: Status and summary of project
for the SPiDeR collaboration (slides from M. Stanitski, Pixel2010)
CALICE Oversight Committee
CALICE: Thermal, Mechanical and Assembly issues
DESY contributions to MAPS DESY testbeam
LC Test Beam Activities
Preparations for the SiD Workshop at Fermilab, April 9-11
MICE Project in the US: Completion of Efforts
CLIC detector at SiD meeting 28/3/2010
(My personal) CALICE Report
Testbeam Timing Issues.
Granular calorimeters Infrastructure
Report on EUCARD WP6: MICE Transnational Access (TA)
Status of International Collaboration for CEPC Detectors R&D
ILC Detector R&D in Japan
DECAL beam test at CERN Paul Dauncey for the CALICE-UK/SPiDeR groups:
Stéphane Callier, Dominique Cuisy, Julien Fleury
9B present perfect + for or since
CALICE: News Since May Paul Dauncey Three main items: Beam test status
CALICE: Major Items Since September
CALICE: Options for the future
EPIC UK funding situation
Upcoming CALICE meetings
Presentation transcript:

Marcel Stanitzki Rutherford Appleton Laboratory CALICE-UK Status Marcel Stanitzki Rutherford Appleton Laboratory

Instead of a talk ... CALICE-UK Birmingham, Cambridge,Imperial, Manchester, RAL, Royal Holloway, UCL 5 Work packages Test beams/DAQ/MAPS/Mechanics/Simulation Funding till April 2009 (Shutdown package) Way less than originally planned Marcel Stanitzki

WP1 Test beams Successful testbeam campaign 2006 DESY & CERN 2007 CERN 2008 FNAL UK heavily involved before the budget cuts DAQ/Analysis Marcel Stanitzki

Some results ECAL Noise Energy Resolution Marcel Stanitzki

WP2 DAQ Work has been focused on providing DAQ for EUDET Still some work on High-speed detector links Marcel Stanitzki

WP3 MAPS Continued testing of TPAC1 Designed and submitted TPAC 1.1 received back 3 weeks ago already started testing Continue working on the chips Will go for another testbeam in Winter 2009 Marcel Stanitzki

Some results Single active pixel with/without laser firing Marcel Stanitzki

More results use 55Fe source on Pixel Array Single active pixel with/without source Marcel Stanitzki

WP4 Mechanics After STFC cuts Focus on detector slab assembly Contribute to EUDET module Glue studies continue Marcel Stanitzki

WP5 Simulations CALICE-UK actively involved in SiD ILD Lots of work on detector optimization Physics studies continue ZHH WW/ZZ Marcel Stanitzki

The future STFC's Detector R&D line Two bids with CALICE-UK participants SPIDER Pixel R&D collaboration Birmingham, Bristol, Imperial, Oxford, RAL Generic DAQ R&D UCL et. al. Marcel Stanitzki

The PFA bid ... Proposal by Cambridge and RAL already submitted 18 month ago reviewed 1 year ago and approved Sitting in Swindon ever since We've been asked to present it again .., Marcel Stanitzki

Summary CALICE-UK will be finishing April 2009 We are in ramp-down mode Still lots of new results Several bids for Detector R&D We plan to continue our R&D Marcel Stanitzki