Summary of IAP comments from 2007 EURISOL Town Meeting

Slides:



Advertisements
Similar presentations
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Advertisements

1 Advisory Council April 1, 2011 Child Care Development Fund – State Plan for Federal Fiscal Years 2012 and 2013.
1 EEC Board Meeting May 10, 2011 Child Care Development Fund – State Plan for Federal Fiscal Years 2012 and 2013.
RAL 27 April 2006The beta-beam task, EURISOL1 Status of the beta-beam study Mats Lindroos on behalf of the EURISOL beta-beam task.
Screen 1 of 24 Reporting Food Security Information Understanding the User’s Information Needs At the end of this lesson you will be able to: define the.
B&O Committee May 2015 iTRAK - Change Management An Agency Adapting to Change.
Protection Against Occupational Exposure
Best Practices In Design Outcomes Of A Survey P. H. King, PhD, PE Joan Walker, PhD Vanderbilt University.
Regional Accreditation Workshop For Latin America & Caribbean Region Panama City, Panama th Nov, 2011.
IAEA International Atomic Energy Agency EPR-Public Communications L-011 Good Practices for PIOs.
IS-700.A: National Incident Management System, An Introduction
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Test Organization and Management
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
System Planning- Preliminary investigation
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
European design study on Neutrinofacilities - Euronu within FP7.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
11/24/20151 Guidelines for NECA CMP Representatives National Electrical Contractors Association.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
University of Southern California Center for Systems and Software Engineering RDCR ARB CS 577b Software Engineering II Supannika Koolmanojwong.
EURISOL DS Mid Term Review Orsay April 24th 2007 Management Aspects Collaboration and Interaction Administration and financial aspects with comparison.
Orsay, 03/Feb/05EURISOL - Beta Beam TaskM. Benedikt 1 The Beta-Beam Task Status and Planning 02/2005 to 01/2006 Michael Benedikt AB-Department, CERN.
Working group meeting 07/05/15. Agenda Overview of review and current action list Relief system – Summary of problem – Details of analysis, testing and.
Health Impact Assessment for Healthy Places: A Guide for Planning and Public Health Module 5: Reporting Goals: The goals of this step are to determine.
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
Orientations towards the Scoping Paper H2020 Transport Programme Committee Brussels, 22 June 2016 SMART, GREEN and INTEGRATED TRANSPORT.
DOE Accelerator Safety Workshop 2017 Bob Lowrie
Stages of Research and Development
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
THE SUPERFUND PROCESS Assessment and Listing
Goal of the workshop To define an international roadmap towards colliders based on advanced accelerator concepts, including intermediate milestones, and.
Status of the beta-beam study
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Overview – Guide to Developing Safety Improvement Plan
Overview – Guide to Developing Safety Improvement Plan
Introduction to Projects
W. T. Weng Brookhaven National Laboratory
CS 577b Software Engineering II -- Introduction
CS577a Software Engineering ARB #2 Workshop
Assessing Academic Programs at IPFW
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
Leading Practice Implementation Guide
INTERNAL AUDIT COMMUNICATIONS AND REPORTING ( %)
Leading Practice Implementation Guide
A High Intensity Neutrino Oscillation Facility in Europe
AICT5 – eProject Project Planning for ICT
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points
SUSTAINABLE ENERGY SUPPLY
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Safety Program for LCLS Experiments
Dairy Subgroup #1: Fostering Markets for Non-Digester Projects
Comments on the North Experimental Area Consolidation Request Form
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Summary of IAP comments from 2007 EURISOL Town Meeting Sytze Brandenburg, for the IAP

Response to previous report IAP appreciates & acknowledges written response to last year’s report design study initiatives following the comments IAP concerned about issues not addressed

Comments from 2007 meeting coordination & overall progress evident format 2007 town meeting format not appropriate for detailed assessment project progress information website no remedy

Comments from 2007 meeting driver accelerator credible proposal for multiple independent beams good positive progress on prototypes concern: beam losses H- stripping losses heavy ions ‘vacuum’ stripping losses, ECR beam emittance

has been done two weeks ago Comments from 2007 meeting 100 kW targets plan for 100 kW targets appropriate & credible mMW Target fission target based on MAFF-design step towards credibility emphasis on Hg-film target assessment consequences 235U to be evaluated isotopes and intensities licensing independent evaluation of UCx development program has been done two weeks ago

Comments from 2007 meeting beam preparation progress difficult to assess (not evident from the presentations and website) critical issue: gas-filled RFQ-cooler post-accelerator post accelerator continues to be credible good progress on prototyping study stripping option insufficiently advanced concern: study of beam losses by ‘vacuum’ stripping

Comments from 2007 meeting beta beams good progress on radiation issues impact alternative scenarios for production feasibility full-scale LLN-approach to be studied coordination with EURO concern: no strong support from neutrino community

Comments from 2007 meeting radiation safety: several urgent issues: DRL define constraints for estimations propose credible concepts to achieve these limits use GANIL or CERN as guidelines for estimates? not necessary to set up models to determine DRLs evaluate credible environmental & accident consequences propose mitigation schemes explore exposure maintenance personnel exposure, remote handling & nuclear ventilation impacts concern: progress on system integration radiation safety

Comments from 2007 meeting physics and instrumentation updated case and proposed experiments OK document format clear and concise

Comments from 2007 meeting user group not moving towards advocacy role as quickly as expected the progress and goals disappointing to the IAP outreach brochure good start towards outside support

Comments from 2007 meeting site study committee IAP is concerned about the mandate of this sub committee has the charge been adequately defined? EURISOL future the community needs to be informed of project continuity new priorities need to be set so that the EURISOL DS results can be exploited with maximum benefit to the community a transition plan needs to be established & approved