FOR MORE INFORMATION CONTACT:.

Slides:



Advertisements
Similar presentations
Working Safely in an Engineering Environment Element 4 - Recognise and control hazards in the workplace Page 2File ref:
Advertisements

Earthquakes Earthquakes occur along faults
Module 15 Presentation. What’s Inside Designing a syllabus Students’ presentation Evaluation.
Structural Damage and Response to Historic California Tsunamis By Orville T. Magoon Coastal Zone Foundation Seismic Safety Commission Workshop May 15,
UTAH COUNTY ELEMENTARY SCHOOLS SEISMIC HAZARDS SURVEY AZIMUTH ENGINEERING AMY FREDRICKSON CODY HATCH ASHLEY BLOOD.
SHE Code 26: Safe use of Lifting Equipment and Lifting Accessories Safety, Health and Environment (SHE) Group.
Key elements of an ECP: 1.Statement of Purpose 2.Responsibilities 3.Risk Identification and Risk Assessment 4.Risk Control Measures 5.Education and Training.
The 5th Tongji-UBC Symposium on Earthquake Engineering
Real World Applications of USGS EQ Science: Stacy Bartoletti Degenkolb Engineers Structural Engineers Association of Washington Cascadia Region Earthquake.
CENTRAL U.S. SHAKEOUT  February 7, 2013 ShakeOut Drill 185,000 participants  Increase from only 55,000 participants in 2012  Increased outreach strategy-
Introduction Training on Safe Hospitals in Disasters.
NATURAL FREQUENCY AND BUILDING RESPONSE structural engineers are keeping us safe.
When science meets decision making I work at the interface between science and decision making for DRR and resilience building Understanding how different.
State of Alabama Emergency Management Agency Monique Smith.
The Role of Building Codes in Delivering Seismic Performance John Hooper Director of Earthquake Engineering Magnusson Klemencic Associates.
 Explain how earthquake-hazard level is determined.  Compare methods of earthquake forecasting.  Describe five ways to safeguard buildings against.
The Hastings Opera House Where to now? Ian Harrison – Chair EBSS ebss.org.nz 2 November 2015.
Improving the world through engineeringhttp://nearyou.imeche.orgImproving the world through engineering 1 New Online Quarterly Reporting System Kevin Manning.
Seismic Performance Analysis of Earth Dam - Case Studies During Chi-Chi Earthquake J. C. Chern Geotechnical Engineering Research Center Sinotech Engineering.
Section 3: Earthquakes and Society
Private School Earthquake Safety Working Group Activities I will tell you about: Working Group process and participants Working Group investigations and.
Contact Us.
Earthquakes By Ms. Zavala Date.
Job Hazard Analysis (JHA) Training for Safety and Health Staff
Unit 1 Health and Safety in the Engineering Workplace
Utah County Elementary Schools Seismic Hazards Survey Azimuth Engineering Ashley Blood, Cody Hatch, Amy Fredrickson Problem Statement: Many geologists.
Failure Modes and Effects Analysis (FMEA)
Safety and Risk.
NEHRP Research: U.S. Geological Survey
How To Add A Xerox Printer To Google Chrome
Click for Fire Risk Assessment Luton - Pat-testing-bedford.co.uk
Frio River Cabins - Frio Vacation Homes - Frio Country Resort
Fire Risk Assessments Bedfordshire - Pat-testing-bedford.co.uk
بسم الله الرحمن الرحيم قَالُوا سُبْحَانَكَ لا عِلْمَ لَنَا إلاَّ مَا عَلَّمْتَنَا إنَّكَ أَنتَ العَلِيمُ الحَكِيمُ صدق الله العظيم ( البقرة 32 )
TYPE IN CENTRE NAME LEVEL 1 RISK ASSESSMENT TYPE IN NAME
Best Ideas about Topics over Civil Engineering Seminar or Projects

Community buildings in a changing landscape
SHE Code 33: Safety of Pressure and Vacuum Systems
هل يمكن أن نكون جيل الأرض الأخير؟
Earthquake Readiness presented by The Office of Mission Assurance.
Challenge of Nuclear Governance
Factor Of Safety When is it safe enough?.
Pollution/Radiation Risk
19.4 Earthquakes and Society Reading assignment.
TYPE IN CENTRE NAME LEVEL 2 FIRE MARSHAL TYPE IN NAME
TYPE IN CENTRE NAME LEVEL 1 FIRE SAFETY TYPE IN NAME
Earthquake Readiness presented by The Office of Mission Assurance.
AACPS SCIENCE AND ENGINEERING EXPO – Form 6A
The benefits to perform FMEA
ریسک در بهداشت و درمان چگونه است؟
TYPE IN CENTRE NAME LEVEL 2 RISK ASSESSMENT TYPE IN NAME
What to do with legacy designs?
Safety.
SHE Code 2: Safe Movement of Vehicles on STFC Sites
Conducting a Job Hazard Assessment
ADD YOUR LOGO HERE TYPE IN CENTRE NAME LEVEL 2 RISK ASSESSMENT
ADD YOUR LOGO HERE TYPE IN CENTRE NAME LEVEL 1 FIRE SAFETY
TYPE IN CENTRE NAME LEVEL 2 FIRE MARSHAL TYPE IN NAME
In association with HORNET Quality and Safety in Healthcare
TYPE IN CENTRE NAME LEVEL 1 FIRE SAFETY TYPE IN NAME
Engineering Projects Helpline
Earthquake Hazard Chapter F5
LONE WORKING Introduction
TYPE IN CENTRE NAME LEVEL 2 RISK ASSESSMENT TYPE IN NAME
Firebase Vs. MongoDB: Choose the Best Database of 2019
Meet Us
Contact Us
Ferrero International S.A.
Earthquake Readiness presented by The Office of Mission Assurance.
Presentation transcript:

FOR MORE INFORMATION CONTACT:

FOR MORE INFORMATION CONTACT: 12%

SAFETY NOTICE Engineers have assessed the seismic performance of this building as potentially an EARTHQUAKE RISK meaning that you may not be safe inside or near this building during or after a moderate to severe earthquake. Every person must make their own judgment about entering this building. FOR MORE INFORMATION CONTACT:

SAFETY NOTICE Engineers have assessed the seismic performance of this building as LOW RISK meaning that there is a low risk of building failure during or after a moderate to severe earthquake.. FOR MORE INFORMATION CONTACT:

SAFETY NOTICE Engineers have assessed the seismic performance of this building as LOW RISK meaning that there is a low risk of building failure during or after a moderate to severe earthquake.. FOR MORE INFORMATION CONTACT: