Copyright , Government of India (DietY) All rights reserved Department of Electronics & Information Technology Ministry of communications.

Slides:



Advertisements
Similar presentations
Organised by Civil Service College, Dhaka Md. Abu Rashed Senior Consultant (PPP) Infrastructure Investment Facilitation Center 18 February 2012 PPP Frameworks.
Advertisements

Contract Management and Regulation Vickram Cuttaree The World Bank St. Petersburg – May 24, 2008.
Introduction to Public Private Partnerships
Public Debt Management with emphasis on PPP 1 Ministry of Finance 08 th Dec 2014.
HEALTH PPPs An introduction Is there a recipe for success?
PPP’s IN NIGERIA: Prospects in the Water Sector
Mangement and Economic Aspects Mária Zúbková „This project has been funded with support from the European Commission. This publication [communication]
Organised by Civil Service College, Dhaka Nazrul Islam Executive Director and CEO Infrastructure Investment Facilitation Center 11 February 2012 Basics.
Structure of Project in PPP- (2) John Plumb. Agenda Following on from the Strategy and business case to develop the ideas Structure of PPP arrangements.
Workshop – Local Financing, Role of ESCo Gavin Slater City Energy & Carbon Manager, Glasgow City Council
Copyright ⓒ 2011 Samsung SDS Co., Ltd. All rights reserved | Confidential Public Private Partnerships in Korea: A Private Sector Perspective from Samsung.
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
Public Private Partnership- Identification, Viability and Implementation Prof. Yashvir Tyagi Prof. Yashvir Tyagi Department of Economics Department of.
PROJECT FINANCE INITIATIVE and PUBLIC PRIVATE PARTNERSHIPS Simon Par Keeling, Société Générale Paris.
Smart Service Delivery in Challenging Times Shared services – what does it mean for you? Alan Higgins Chair, CIEH Council Director, Environmental Health.
Financing Urban Public Infrastructure
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
BUILDING SUSTAINABILITY: PARTNERSHIPS AND FINANCE by S. Adrian Ross Senior Programme Officer PEMSEA.
An Introduction to Public Private Partnerships: Why Government needs to work with the private sector Vilnius 22 nd November 2006 Stephen Harris - Head,
Fundamentals of PPPs VASCUPP September 25, 2013 Rick Norment, NCPPP.
Iraq Finance 2012 Public Private Partnerships Abraham Akkawi September 18, 2012.
Management and Economic Aspects of Brownfield Regeneration Mária Zúbková „This project has been funded with support from the European Commission. This.
An Integrated Control Framework & Control Objectives for Information Technology – An IT Governance Framework COSO and COBIT 4.0.
Seite 1 REETA Planning Workshop, Georgetown 11./12. February 2014 Developing Public-Private Partnerships for Sustainable Energy.
Building Blocks for a Successful Public- Private Partnerships Presented by Igor Abramov Counsel & Co-chair, Eurasia and Russia Practice Group, Heenan Blaikie.
Challenges in Meeting Public Sector Financing Needs – Financing Key PPP Projects. A Paper Delivered at the 2008 Perchstone & Graeys Annual Lecture by Jide.
Financing for Development United Nations Risk Mitigation for Mobilizing Private Sector Investments in Infrastructure in Developing Countries Pradeep Singh.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Selecting and Designing Concession / PPP Projects Martin Darcy.
Public Private Partnerships (PPPs) and The World Bank
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
What is it ? is a government service or private business venture which is funded and operated through a partnership of government and one or more private.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
Definitions and objectives of public private partnerships (PPPs) Annemarie Mille.
Dr. Steven Van Garsse PPP Unit Flemish Department for the General Government Policy.
CLC1501 Introduction to the PPP Procurement Approach – Principles of PPP Procurement.
Developing Logistics Centres in Inland Ports Dr Saša Jovanović, dipl.ing. Workshop on Ports as Engines of Economic Development and Strategic Management.
SESSION 2 Tuesday 9.30 – Selection of PPP Projects.
Public private partnership
Finding the Revenue Stream to Make P3s Work
Chinese Urbanism in Global Context
BOT LAW (R.A. No. 6957, as amended by R.A. No. 7718)
Presentation to the Public-Private Partnerships in Highways Workshop
Legal Aspects Related to Brownfield Regeneration
The public – private continuum
THE SELF SUSTAINING NON-PROFIT Golden Lessons From the Development and Corporate Sectors 14th Eastern Africa Resource Mobilization Workshop Paper.
Developing Public-Private Partnerships for Sustainable Energy
The New Italian Law on Ports in the European Perspective
 Remaining public investment needs in the face of declining aid flows: what scope for public-private partnerships in BiH? Serban Ghinescu, EBRD 4.
Public Private Partnerships (PPP)
UNCITRALThird International Colloquium on Public-Private Partnerships (PPPs) October 2017, Vienna Experts for Chapter IV October 2017.
Module 8 : Implementing Port Reform
Project risk and Government support
A bank’s perspective on PPP projects
ASEAN PPP Summit The Public-Private Partnership Model and
Regulation of Public-Private Partnerships
Toolkit for Public-Private Partnership in Highways
Internet Interconnection
The SWA Collaborative Behaviors
PUBLIC PRIVATE PARTNERSHIPS KERJASAMA PEMERINTAH SWASTA
Ministry of Regional Development and Public Works
progress of the water reform in bulgaria
Public private partnership
Build operate and transfer project delivery System in Saudi Arabia
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
WATER UTILITY REFORM PLAN
Capital Improvement Plans
The Role of Private Sector in Capital Budgeting
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
Presentation transcript:

Copyright , Government of India (DietY) All rights reserved Department of Electronics & Information Technology Ministry of communications Information Technology Government of India Department of Electronics & Information Technology Ministry of communications Information Technology Government of India Introduction to Public Private Partnerships As A Business Model 30 th September 2016 B Krishnamurthy (BKM)

Copyright , Government of India (DietY) All rights reserved Agenda 2  Introduction to PPP  Introduction to PPP models  Structuring considerations in a PPP  Risks and challenges in PPP  PPP in e-Governance implementations in India

Copyright , Government of India (DietY) All rights reserved Defining Public Private Partnerships A public private partnership or PPP involves:  Government and private sectors working together to deliver infrastructure or services that are traditionally provided by government  Private financing, implementation and management of key infrastructure and with the primary objective of improving public services 3 PPP is a generic term for the relationships which are formed between public bodies and the private sector with the aim of introducing private sector resources and/or expertise to provide and deliver public sector assets and services.

Copyright , Government of India (DietY) All rights reserved Defining Public Private Partnerships 4 Traditional Model of Public Service Delivery Government Organization Private Sector Public Services Citizens & businesses Private sector was supporting the government in delivery of public services to citizens Shift in Public Service Delivery Government Organization Private Sector Public Services Citizens & businesses Private sector is participating in public services delivery to citizens

Copyright , Government of India (DietY) All rights reserved Various Models For Private Sector Participation 5 Risk Transferred to the Private Sector Government Control Privatise Conventional BOO(T) PPP Outsource

Copyright , Government of India (DietY) All rights reserved PPP Basics PPPs are concerned with services, not assets  The government does not need to own infrastructure to deliver services  PPPs are a procurement option, not a novel method of developing public infrastructure  PPP policy sits alongside other procurement methods – ie conventional, outsourcing, leasing etc.  Suitable to some public projects, not all projects  PPPs are not “new money”  Service outputs must be paid for, whether directly (e.g. user charges) or by appropriation  Must therefore be affordable – either to users (user charges) or to the Budget 6

Copyright , Government of India (DietY) All rights reserved More about PPP 7  The government retains political responsibility/accountability to deliver services for the community;  The government defines the timeframe in which the services must be delivered; and the quality and quantity of services needed;  The private sector delivers the services and finances or part finances the project;  Private sector remunerated through services charges/transaction fees/gap funding;

Copyright , Government of India (DietY) All rights reserved More about PPP 8  A mid/ short-term relationship is established, typically(in e governance) between 3 to 5 years, depending on the nature of the facilities, assets or services to be delivered;  The different functions of system design, development, maintenance and operation are integrated to release the synergies between them and discourage low- capital/high-operating expenditure solutions;  Risks are allocated between the public and private sectors;  There is an emphasis on output-based specifications;

Copyright , Government of India (DietY) All rights reserved Benefits of PPP 9  Allowing the government to concentrate on its core activities  Allocation of Risk and Responsibility where it can be best managed  Unity of responsibility leading to improved delivery of public services  Reduced lifecycle costs of a project;  Quantifying more accurately the costs of service delivery;  Reduced risk of cost overruns;  Increased revenues;  Maintaining an efficient government and a lean civil service;  Spreading the government’s capital works expenditure over the life of a project;  Invoking private sector skills, experience, access to technology, and innovation.

Copyright , Government of India (DietY) All rights reserved What Distinguishes PPP ?  SHARING OF RISK Private party bears significant financial, technical and operating risk Promise of a sustained service Financial rewards to private sector linked with output  CAPITAL INVESTMENT AND CAPACITY BUILDING Significant private capital deployed for citizen services or use of already developed capabilities Building capacities for servicing at a faster pace  JOINT OWNERSHIP Well defined roles and responsibilities Clarity in ownerships and other terms Full control by Government over key data Concessions and Guarantees from and to the Government 10 The principle of risk transfer is fundamental for all PPP type transactions What does this mean?

Copyright , Government of India (DietY) All rights reserved Typical Project Risks 11  Land acquisition, planning and permissions  Design  Construction  Commissioning  Latent defects  Operating performance  Operating and maintenance costs  Third party revenue  Demand (volume)  Residual value  Inflation  Regulatory  Taxation  Force Majeure  Changes in requirement

Copyright , Government of India (DietY) All rights reserved Risk Allocation Key considerations for risk allocation: – Who is best placed to reduce the probability of risk occurring? – Who is best placed to manage the cost of risk if it does occur? 12 Minimizing the expected cost of risk is crucial for maximizing returns Risks should be allocated to the party best able to understand and manage them.. Public Shared Private Risk

Copyright , Government of India (DietY) All rights reserved Risk Allocation  LAND ACQUISITION, PLANNING / PERMISSIONS  DEMAND RISK (?)  CHANGES IN REQUIREMENTS  LATENT DEFECTS (EXISTING) Risks should be allocated to the party best able to understand and manage them.. PUBLICPRIVATESHARED RISK INFLATION REGULATORY TAXATION FORCE MAJEURE DESIGN AND CONSTRUCTION COMMISSIONING OPERATING AND MAINTENANCE COSTS OPERATING PERFORMANCE LATENT DEFECTS (NEW) THIRD PARTY REVENUE 13

Copyright , Government of India (DietY) All rights reserved What Should Private Partnership Bring? 14 Real financial benefit and a better utilisation and allocation of public funds; Development of efficient public infrastructures/projects in shorter terms than otherwise; Ensure of good quality public services; Economic growth and boosted direct investment by private sector Efficient control over the formation of long-term private sector liabilities;

Copyright , Government of India (DietY) All rights reserved Role Of Government In PPP 15  Set policy, identify opportunities, and define objectives;  Decide amongst competing priorities for public resources;  Ensure transparency and probity in the procurement process;  Identify needs in terms of output specifications that encourage flexibility and innovation in the manner of performance;  Set and ensure the achievement of standards;  Establish, monitor and enforce the levels of service;  Ensure value for money is achieved;  Determine and manage reward mechanisms and tariff structures;  Identify and propose the allocation of risks;  Provide a clear regulatory framework and perform regulatory functions; and  Safeguard the interests of customers and the general public.

Copyright , Government of India (DietY) All rights reserved Role of the Private Parties 16  Achieve defined levels of performance in service delivery;  Provide expertise and innovation;  Provide access to private financing, as appropriate; and  Provide a sufficient return to investors and other stakeholders.  Do not take the responsibility of risks which cannot be managed by the private sector  Understand the contractual terms comprehensively as the government contracts are rigid.

Copyright , Government of India (DietY) All rights reserved PPP is Now Omnipresent In Various Sectors 17

Copyright , Government of India (DietY) All rights reserved Diagnostics for a PPP (Issues needing attention) 18

Copyright , Government of India (DietY) All rights reserved Technical Issues 19  Present delivery system  Proposed delivery model  Defining and documenting the desired outcomes  Identifying differentiating factors in each of the components of a project  Procurement plan for each of the components  Defining the metrics for performance measurement

Copyright , Government of India (DietY) All rights reserved Legal Regulatory and Policy Frameworks 20  Understanding of regulatory bodies, regulations;  Major sector institutions and government entities related to the sector;  User charges and subsidy policies and arrangements;  Existence and applicability of legally mandated service quality standards;  Environmental and health regulations;  Relevant labor laws and regulations  Arbitration frame works  Audit of performance standards and service level agreements

Copyright , Government of India (DietY) All rights reserved Institutional Structures And Capacity 21  Institutional and legislative frameworks to support the business model  Capacity to match the role and responsibilities of stake holders  Institutional structure to delegate the responsibilities to private sector  Alignment of risk and reward with the ability to manage the risk by a stake holder  Capacity to monitor the performance and service level agreements

Copyright , Government of India (DietY) All rights reserved Commercial, Financial and Economic issues 22  COMMERCIAL  Suitability of the business model  Funding arrangements  Win-win strategy  Commercial viability to the private sector  FINANCIAL  Design of realistic pricing of user charges  Social responsibility of the government  Need for subsidy and viability gap funding  Business case analysis  ECONOMIC  Cost –benefit analysis  Benefits analysis in qualitative terms

Copyright , Government of India (DietY) All rights reserved PPP: Basic Options 23

Copyright , Government of India (DietY) All rights reserved Services Contracts 24 Similar to the Outsourcing model  Government maintains complete control on the project creation, execution and assets  Government funds the project investments for the capital and operational expenditure during the project tenure  Government leverages private sector strengths for creation of the project or maintenance of the project or both  Risks are allocated to the government and private sector based on the responsibilities (e.g. government will have the risk of project demand, the private sector will carry the risk of performance and quality of the services delivered to the government)  Does not attract capital investment  No deeper impact on the services delivery

Copyright , Government of India (DietY) All rights reserved Management Contracts 25  Similar to the Outsourcing model  Contractual arrangement for the management of a part or whole of a public enterprise by the private sector  Allows private sector skills to be brought into service design and delivery, operational control, labour management and equipment procurement.  Public sector retains the ownership of facility and equipment.  The private sector is provided specified responsibilities concerning a service and is generally not asked to assume commercial risk.  The private contractor is paid a fee to manage and operate services.  Normally, payment of such fees is performance- based  But longer period may be used for large and complex operational facilities such as a port or airport.

Copyright , Government of India (DietY) All rights reserved Lease Contracts 26  Assets are owned by the public sector  Operator takes lease of both infrastructure and equipment from the government for an agreed period of time  Government maintains the responsibility for investment and thus bears investment risks  The operational risks are transferred to the operator  Fixed facilities and land are leased out for a longer period than for mobile assets.  Private sector is responsible for the service delivery  Under a lease, the operator retains revenue collected from customers/users of the facility and makes a specified lease fee payment to the contracting authority

Copyright , Government of India (DietY) All rights reserved Concessions  In this form of PPP, the Government defines and grants specific rights to an entity (usually a private company) to build and operate a facility for a fixed period of time  Private sector is the concessionaire  The Government may retain the ultimate ownership of the facility and/or right to supply the services  In concessions, payments can take place both ways: concessionaire pays to government for the concession rights government may also pay the concessionaire, if necessary to make projects commercially viable and/or reduce the level of commercial risk taken by the private sector,  Private sector invests in project design, construction, implementation and operations based on the concessions provided by the public sector  Revenues from the project are accrued to the private sector and private sector pays for concession rights to the public sector (if agreed). 27

Copyright , Government of India (DietY) All rights reserved BOT (Build Operate and Transfer) 28  A concession type of arrangement  Private sector is the concessionaire  Similar to ‘Project Finance’ model discussed in the previous session  BOT is a common form of PPP in all sectors in Asian countries. A large number of BOT port and road projects have been implemented in the region.  the concessionaire undertakes investments and operates the facility for a fixed period of time after which the ownership reverts back to the public sector  operating and investment risks can be substantially transferred to the concessionaire  By retaining ultimate ownership, the government controls policy and can allocate risks to those parties best suited to bear them or remove them  Other variants of this model include BTO (Build Transfer Operate), Build Lease Transfer (BLT)

Copyright , Government of India (DietY) All rights reserved Build Own Operate (BOO) 29  This model refers to private ownership of assets or privatisation of the services  The Government grants licenses to private undertakings to provide services such as fixed line and mobile telephony, Internet service, television and radio broadcast, public transport, and catering services on the railways.  Licensing may also be considered as a form of “concession” with private ownership of assets.  Private sector remains responsible for design, construction and operation of the project/facility  In some cases the public sector may relinquish the right of ownership of assets to the private sector  This is the most common form of private participation in the power sector in many countries

Copyright , Government of India (DietY) All rights reserved Thank you 30