Project GabE ECE 135 – Spring 2005 Patrick Crosby Adam Durity Rahmin Sarabi Omar Al-Jadda.

Slides:



Advertisements
Similar presentations
Torch electronics test environment MCP readout update.
Advertisements

CPE495 Computer Engineering Design I Emil Jovanov Electrical and Computer Engineering The University of Alabama in Huntsville Introduction to PCB Design.
Presenter: Kenny Haulk
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Rahmin Sarabi Adam Durity.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE 135. Opto-Electronics Design Project Spring 2006.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Group 2 - Project Update April 1, 2004 Tyler Helble.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
Cesar Lugo November 7, 2002 Progress Report (October , 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
BUS 630 Week 6 Assignment Final Project Submit a paper on one of the major topics listed below using one of the recommended journal articles found in the.
WEB 434 Complete Class Check this A+ tutorial guideline at Complete-Class-guide WEB 434 Learning Team Presentation.
ECE 135 – BtrLaytDanNvr Presentation 7
Optical Gigabit Ethernet
Kevin Parker with Bryan Chavez & Pat Cleary February 24th, 2005
ECE4006 Group 6 – Presentation 5
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Gigabit Ethernet Design ECE 4006C – Spring 2003
Group #8: Adam Belkhadir Alex Dutrow John Tran
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Melanie Garrick Barry Mullins Nihar Patel Jason Young
Presenter: Chris Lambrecht
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
ECE 135 – Group 3 Presentation 1-2
Presenter: Allen Duncan
DS595/CS525: Urban Network Analysis Prof. Yanhua Li
iReader Schematic & PCB Group 3 Thomas Higdon Mat King
Test Bench for Serdes Radiation Qualification
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Gigabit Ethernet Design ECE 4006C – Spring 2003
Group 5 – ECE 4006: Week 12 Melanie Garrick 1/2/2019.
ECE 4006 Group 6 – Presentation 8
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Project GabE ECE 135 – Spring 2005
ECE135 Group 2 – Presentation 3
Capstone Design Update
ECE 135 – VCSEL Kings Presentation 5
GIS Development Project City of Woodcreek, TX
GIS Development Project City of Woodcreek, TX
Optical Gigabit Ethernet
Status Presentation February 20-27, 2003 Michelle Middleton.
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
Presented by Yuntian Lu
GROUP 1 FINAL PRESENTATION
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Project GabE ECE 135 – Spring 2005 Presentation 10
Task List Group management plan Background studies
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
ECE 135 – The Three Presentation 9
Project GabE ECE 135 – Spring 2005 Week 9
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

Project GabE ECE 135 – Spring 2005 Patrick Crosby Adam Durity Rahmin Sarabi Omar Al-Jadda

Progress Report Submitted Initial Board Design for Review Received suggestions and updated the design taking into consideration several issues that were unresolved in the first submission Checked design against schematic and submitted for final review

Gantt Chart

Design Issues I Symmetry in High Speed Digital Lines Rotated ROSA 45 deg to match line lengths

Design Issues II Daisy Chained Supply Lines Powered Maxim chip directly from Vcc

Design Issues III Increased pitch on Supply Lines More careful with ground plane  separated Tx and Rx ground planes with inductor More conscientious about placing components and how their position on the board could leave Final design review  double checked board against schematic

Final Board Design

Sigma Links Transceiver

Next Two Weeks Write Midterm Report Update Website Submit board to PCB Express Begin building first board R&R!

Thank You Have a good Spring Break