Imaging issues Full beam, full bandwidth, full Stokes noise limited imaging Algorithmic Requirements: –PB corrections: Rotation, Freq. & Poln. dependence,

Slides:



Advertisements
Similar presentations
Fourteenth Synthesis Imaging Workshop 2014 May 13– 20 Wide-Field Imaging I: Full-Beam Imaging & Surveys Steven T. Myers (NRAO-Socorro)
Advertisements

Interferometric Spectral Line Imaging Martin Zwaan (Chapters of synthesis imaging book)
The EVLA and SKA pathfinder surveys Jim Condon NRAO, Charlottesville.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array EVLA Observations of.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Cross Correlators Walter Brisken.
Frazer Owen NRAO UNM Astrophysics Seminar November 3, Galaxy Evolution and Mechanical Energy Abell 2256 with the EVLA: Data Reduction and Results.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Rick PerleyNSF Mid-Project Review May , EVLA Technical Performance Rick Perley With much essential help from Barry Clark, Ken Sowinski, Vivek.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Emmanuel Momjian (NRAO)
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Squint, pointing, peeling and all that Jazz Juan M. Uson (NRAO) 12/02/08.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Andreas Horneffer Status of MKSP LOFAR Observations.
J. Hibbard Spectral Line II: Calibration & Analysis 1 Spectral Line II: Calibration and Analysis Bandpass Calibration Flagging Continuum Subtraction Imaging.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The Expanded Very Large.
1 The OSKAR Simulator (Version 2!) AAVP Workshop, ASTRON, 15 th December 2011 Fred Dulwich, Ben Mort, Stef Salvini.
S.T. MyersEVLA Advisory Committee Meeting September 6-7, 2007 EVLA Algorithm Research & Development Steven T. Myers (NRAO) CASA Project Scientist with.
Introducing the EVLA NRAO Postdoctoral Symposium, 29 April-1 May 2009 Michael P. Rupen Project Scientist for WIDAR.
8/12/201514th RHESSI Workshop 1 Dale E. Gary, Center for Solar-Terrestrial Research, Physics Department, NJIT.
RadioNet First Software Forum, Jodrell Bank – 01Mar05 1 Algorthmic Issues from the First RadioNet Software Forum – a synthesis Steven T. Myers National.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Spectral Line II John Hibbard.
Мulti-frequency VLA observations of M87. Observations’ parameters Test VLA observations (configuration D) of M87 (RA=12:28, Dec=12:40) took place on November.
Sanjay BhatnagarEVLA Advisory Committee Meeting May 8-9, EVLA Algorithm Research & Development Progress & Plans Sanjay Bhatnagar CASA/EVLA.
Observing Strategies at cm wavelengths Making good decisions Jessica Chapman Synthesis Workshop May 2003.
Recent progress in EVLA-specific algorithms EVLA Advisory Committee Meeting, March 19-20, 2009 S. Bhatnagar and U. Rau.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The Expanded Very Large.
L. Young, Synthesis Imaging Summer School, 19 June Spectral Line I Lisa Young This lecture: things you need to think about before you observe After.
Dependence of the Integrated Faraday Rotations on Total Flux Density in Radio Sources Chen Y.J, Shen Z.-Q.
Мulti-frequency Algorithm at Russian Software Package ASL L. Kogan, S. Likhachev, N. Kardashev, E. Fomalont, F. Owen, E. Greisen.
Мulti-frequency Simulation of Space VLBI using VLA and VLBA L. Kogan, S. Likhachev, N. Kardashev, E. Fomalont, F. Owen, E. Greisen.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
Wednesday Lunch Talk, NRAO, Socorro 28 March /18 Correcting for wide-band primary-beam effects during imaging and deconvolution Urvashi Rau Sanjay.
1/20 Radio interferometric imaging of spatial structure that varies with time and frequency Urvashi Rau ( NRAO ) Wednesday Lunch Talk 29 Aug 2012 Outline.
S. Bhatnagar: CALIM2010, Dwingeloo, Aug. 24th 2010.
1 Owen, Rudnick, Eilek, Rau, Bhatnagar, Kogan Relics and Jets in Abell 2256 at 1.5 GHz. EVLA data : 1-2 GHz Lband A merging rich cluster of galaxies. Z=0.058,
1 S. Bhatnagar: Deep Surveys with SKA Pathfinders, Perth, April 4, 2008 Low Frequency Imaging Challenges S. Bhatnagar NRAO, Socorro.
S. Bhatnagar: Wed. Lunch, Socorro, Sept. 22nd 2010.
Direction dependent effects: Jan. 15, 2010, CPG F2F Chicago: S. Bhatnagar 1 Direction-dependent effects S. Bhatnagar NRAO, Socorro RMS ~15  Jy/beam RMS.
Surveying Cosmic Time with the WIDAR Correlator
EVLA Spectral-Line Science Below 1200 MHz
AAVS1 Calibration Aperture Array Design & Construction Consortium
S. Likhachev (1), L, Kogan(2), E. Fomalont(2), F. Owen(2)
EVLA Availability - or - When Can I Use It?
Observing Strategies for the Compact Array
S. Bhatnagar: ASTRON, Dwingeloo, June 29th 2010
EVLA Project Peter Napier
Imaging and Calibration Challenges
Polarization Calibration
Oxford Algorithms Workshop
HERA Imaging and Closure
EVLA Status and Prospects
Rick Perley National Radio Astronomy Observatory
Observational Astronomy
Observational Astronomy
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
EVLA and LWA Imaging Challenges
VLA to EVLA Transition Plan
Some Illustrative Use Cases
From Russia with love!!!.
EVLA Advisory Committee Meeting
Science Commissioning
Early indications of performance
Prototype Correlator Testing
Basic theory Some choices Example Closing remarks
Shared Risk Science with the EVLA
EVLA Algorithm Research & Development
Correlator Growth Path
Rick Perley NRAO - Socorro
Presentation transcript:

Imaging issues Full beam, full bandwidth, full Stokes noise limited imaging Algorithmic Requirements: –PB corrections: Rotation, Freq. & Poln. dependence, W-term (L-band) –Multi-frequency Synthesis at 2:1 BWR PB scaling with frequency, Spectral Index variations Scale and frequency sensitive deconvolution –Direction dependent corrections Time varying PB, pointing offsets, polarization

Cross hand power pattern PB rotationally asymmetric PB rotation with PA PB scaling with frequency Antenna pointing errors Sources of time variability Gain change at first side lobe due to rotation Gain change in the main-lobe due to rotation Time varying gains: PB rotation (Brisken, EVLA Memo #58)

Imaging limits: Due to PB rotation Limits due to asymmetric PB –In-beam max. 10% point: ~10000:1 –Errors due to sources in the first side-lobe: 3x-5x higher –Less of a problem for non-mosaicking observation at higher frequencies (>C-band) But similar problems for mosaicking at higher frequencies Limits due to antenna pointing errors –In-beam and first side-lobe errors: ~10000:1 –Similar limits for mosaicking at higher frequencies

Wide-band static PB Avg. PB Spectral Index (1-2GHz) Wide-band power pattern (3 Channels spanning 1 GHz of bandwidth) 90% 50% 10%

Imaging limits: Due to bandwidth Frequency dependence –Instrumental: PB scales by 2X is strongest error term –Sky: Varying across the band – needs to be solved for during imaging (MFS) Limits due to sky spectral index variations: –A source with Sp. Index ~1 can limit the imaging dynamic range to ~

Measurement Equation Generalized Measurement Equation J ij are Direction Independent Mueller Matrix J s ij are Direction Dependent Mueller Matrix Unknowns in the above equation: J ij, J s ij and I o Data Corruptions Sky

Projection methods: General approach Construct a K ij which models the desired DD effect For an iterative deconvolution, compute update direction (Dirty Image) as Accurate residual computation (Chisq) as If the operator is approximately unitary, the iterations will converge

Before correction Stokes-I Stokes-V (Bhatnagar et al., EVLA Memo 100 (2006), A&A (2008) Correction for PB rotation

Before correction After correction (Bhatnagar et al., EVLA Memo 100 (2006), A&A (2008) Correction for PB rotation After correction Stokes-I Stokes-V

Stokes-I Stokes-V (10x improvement) A-Projection: EVLA Squint correction

EVLA L-Band Field: 3C Antennas, BW=110 MHz Integration = 7hrs Gain + BandPass Calibration Single Baseline based correction DR: Peak/OffSource RMS –~700,000 : 1 Limited by DD errors –Due to PB rotation? –Errors in the sidelobe Data courtesy R. Perley

Work in progress Work in progress to eliminate “numerical noise” Possible source of errors –Interpolation errors in PA rotation? –Aliasing errors –Off-by-one pixel error –Model not good enough Current pace of progress limited by excessive run-time (not using parallel processing yet)

Work in progress Work in progress to eliminate “numerical noise” Possible source of errors –Interpolation errors in PA rotation? –Aliasing errors –Off-by-one pixel error –Model not good enough Current pace of progress limited by excessive run-time (not using parallel processing yet)

Wide-band imaging: Rau’s thesis For comparison, Spectral Index Map constructed from images at 1.4GHz and 4.8GHz, obtained from C.Carilli et al, Ap.J These data included synthesis runs with VLA A,B,C,D Array at both frequencies. Map has been smoothed to 1 arcsec. Spectral Index Image Spectral Index Image (EVLA MFS)

Wideband PB correction 3C286 Stokes-I Before PB correction After PB correction PB=50%

Wideband Spectra Rupen, Myers, Dhawan,... Moment-0 Image End to end processing done in CASA by Steve Myers Data Cube available at: projectstatus/index.shtml

Early Science Programs Two early science programs: March 2010 through December Open Shared Risk Observing (OSRO): – A ‘business as usual’ observing protocol. – Observers will access EVLA in same manner as current for VLA. – Initial configuration provides 512 spectral channels with one or two spectral windows of 128 MHz (maximum) each. Resident Shared Risk Observing (RSRO): – Must be resident in Socorro for at least 3 months. – Participants will have access to more extensive observing capabilities. – Participants will assist NRAO staff in expanding capabilities – Observing time proportional to length of residency. – 27 proposals received on first call, 13 have been accepted. For details, see: