AGGREGATE PLANNING BY GRAPHICAL APPROACH Particularly for high volume, standardized product system & closed job shop systems, the concepts & methods of.

Slides:



Advertisements
Similar presentations
Aggregate Planning. Dealing with the Problem Complexity through Decomposition Aggregate Planning Master Production Scheduling Materials Requirement Planning.
Advertisements

© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Aggregate Planning in a Supply Chain
Operations Management Dr. Ron Tibben-Lembke
Chapter 13 Capacity and Aggregate Planning. Aggregate Production Planning (APP) Matches market demand to company resources Matches market demand to company.
Operations Management Aggregate Planning Chapter 13
IES 371 Engineering Management Chapter 14: Aggregate Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
Aggregate Planning 13 © 2011 Pearson Education, Inc. publishing as Prentice Hall.
PRODUCTION AND OPERATIONS MANAGEMENT
Aggregate Planning in a Supply Chain
Aggregate Planning.
1 By: Prof. Y. Peter Chiu By: Prof. Y. Peter Chiu 9 / 1 / / 1 / 2010 Advanced P.O.M. Chap. 3 Aggregate Planning.
Chapter 8 Aggregate Planning in a Supply Chain
Strategic Capacity Planning Defined
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Aggregate Planning Operations Management - 5 th Edition Chapter.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
Aggregate Planning.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
OPIM 204 – Aggregate Planning 1 Aggregate Planning OPIM 3104 Instructor: Jose Cruz.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 20 1.
Operations Management Aggregate Planning
1 1 Slide Aggregate Planning Professor Ahmadi. 2 2 Slide Planning Tasks and Responsibilities.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
CHAPTER 3 AGGREGATE PLANNING. LEARNING OBJECTIVES Define aggregate planning and how it is useful Identify optional strategies for developing an aggregate.
Aggregate Planning.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Operations Management Aggregate Planning
Production Smoothing An insightful look at the intricacies of tactical level production planning An engineering management graduate busily determining.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice Hall, Inc. All rights reserved. Alternatives Quarter Total.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Sales and Operations Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Chapter 14 Aggregate Planning.
13 Aggregate Scheduling PowerPoint presentation to accompany
BUAD306 Aggregate Planning.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Aggregate Planning FAISAL FARIS BIN RAHIM
Beni Asllani University of Tennessee at Chattanooga
Chapter 8 Aggregate Planning in the Supply Chain
Sales and Operations Planning
Dr Sh Salleh bin Sh Ahmad
PRODUCTION AND OPERATIONS MANAGEMENT
13 Aggregate Scheduling PowerPoint presentation to accompany
Production and Operations Management
Aggregate Production Planning (APP)
Presentation transcript:

AGGREGATE PLANNING BY GRAPHICAL APPROACH Particularly for high volume, standardized product system & closed job shop systems, the concepts & methods of aggregate planning & scheduling are of great importance They are important at least if we are to obtain the best possible use of facility within the constraint of policy regarding hiring & firing, inventories & the use of outside capacity & within the constraints of our own capacity 15/4/20131Lec # 24 & 25

AGGREGATE PLANNING BY GRAPHICAL APPROACH The broad line of questions that are vital & can be addressed through aggregate planning are: 1.To what extent should inventory be used to absorb the fluctuations in demand over the next 6-12 months? 2.Why not absorb this fluctuation by simply varying the size of work force? 3.Why not maintain a fairly stable workforce size & absorb fluctuation by changing production rate by resorting to the overtime & shortened time? 4.Why not maintain a fairly stable workforce size & product rate & let our sub contractor help with the problem of fluctuating the order rates from us? 15/4/2013Lec # 24 & 252

AGGREGATE PLANNING BY GRAPHICAL APPROACH If inventory has to absorb all the fluctuations in demand, it is necessary to prepare the inventory balance so that no stock out occurs 15/4/2013Lec # 24 & 253

PREPARATION OF INVENTORY BALANCE To understand how inventory balance is prepared, look at table 3.1 (in excel sheet) which shows how a company has developed forecast to an item which has a demand influenced by seasonal factors The table illustrate how the inventory balance is prepared The monthly inventory balance required is determined following a plan of letting the inventory to absorb all fluctuations in demand. 15/4/2013Lec # 24 & 254

PREPARATION OF INVENTORY BALANCE In this case we have constant workforce, no idle time or overtime, no backorder, no use of subcontract, & no capacity adjustments Once the inventory requirements are known the carrying cost can be weighted against the cost of alternative plan 15/4/2013Lec # 24 & 255

PREPARATION OF INVENTORY BALANCE Problem 1: with reference to the data in table 3.1, the company has determined that to follow a plan of meeting demand by varying the size of workforce would result in hiring & layoff cost estimated at Rs.22,000. If the cost of producing each unit is Rs.100, the carrying cost/per annum are 20% of average inventory value & storage cost are Rs. 9/unit, which plan results in lower cost: VARYING INVENTORY or VARYING EMPLOYMENT (hiring/layoff) 15/4/2013Lec # 24 & 256

PREPARATION OF INVENTORY BALANCE Problem 2: A Company has a monthly demand as shown in table 3.2 (shown on excel sheet). The organization policy is to have 10% of month forecast as safety stock. The number of days available in each month is also shown. There is no inventory available at the beginning of the first month, i.e. January The cost of the organization are as follows: Inventory holding cost: Rs.2/unit/month Duration of shift:8 hours Hourly wage rate:Rs. 8 Stock out cost /unit:Rs.5 Hourly overtime wage rate:Rs. 10 Subcontracting cost/unit:Rs. 105 with Rs. 5 premium Labor Hour /unit:4 hours Layoff cost/worker:Rs.500 Hiring cost/worker:Rs /4/2013Lec # 24 & 257

PREPARATION OF INVENTORY BALANCE Problem 2: (Cont..) Three potential plans are suggested: 1.Produce to exact production requirement by varying the size of workforce on regular hours. Assume there are 250 workers available in January 2.Make a constant workforce of 518 workers. Assume no subcontracts are available & inventory will fluctuate with stock out filled from the following month’s production 3.Produce by fixed workforce of 500 regular times & subcontract all excess demands over the period production. Inventory will increase when production exceeds demand, no stock out is permitted Determine the plan which gives the least cost 15/4/2013Lec # 24 & 258