Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
EMMA RF System Summary RF Requirements (S Berg): Aperture: –Aperture 34.7 mm (min) –Dispersion effects may increase by 3 – 4 mm Frequency: –Frequency range.
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
THE MICE RF SYSTEM J.F.Orrett* A.J.Moss, ASTeC, Daresbury Laboratory, WA4 4AD, UK Accelerator Science and Technology Centre
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Daresbury MICE Progress Andrew Moss Joe Orrett Peter Corlett.
Paul Drumm 9 Feb 2004 MICE at RF system: power source, distribution Paul Drumm RAL Ambitious title!
Report from RF Session (1:30-5:40 PM, 3/30/2004) H. Haseroth and Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration.
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
Status of the MICE Amplifier
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
RF Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Andrew Moss Daresbury Laboratory Collaboration Meeting th -16 th February 2013 Coseners House MICE RF HP System rprogress.
MICE RF Project & Towards Step VI MICE Project Board - March 8, 2012 Alan Bross 1.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
MICE RF System - Status Alan Bross Fermilab. RF Cavities for MICE I Eight 201-MHz cavities in the MICE cooling channel First five cavities arrived at.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
MICE RF – TIARA and General Progress Tim Stanley RAL 5 June 2013.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
1 paul drumm, 19 th May 2004 MICE RF By Phone at 16:00 FNAL: Al Moretti LBNL: Derun Li
Electrical & Control Power Supplies Trevor Hartnett.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Anders Sunesson RF Group ESS Accelerator Division
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
Progress on the MICE RF High Power Drive Systems K Ronald, University of Strathclyde For the MICE RF team 1MICE CM38 RF Parallel Session.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
RF Review CM37 Andrew Moss. Amplifier results at Daresbury 2MW at 35kV, good efficiency and gain.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
Managed by UT-Battelle for the Department of Energy Vector Control Algorithm for Efficient Fan-out RF Power Distribution Yoon W. Kang SNS/ORNL Fifth CW.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
MICE RF – Installation at RAL Tim Stanley, MICE RF Engineer, RAL 2 June 2014.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
Andrew Moss STFC, ASTeC Example amplifier control system Example of current STFC copper cavity in operation –Using SF6 insulated waveguide –Conditioning.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
MICE HPRF Up-date Tim Stanley RAL – Testing 212 kW achieved from driver stage 4616 #1 at DL, ready for endstage 116 #2. Good experience, in tuning.
DESIGN STUDY November 28 th - 30 th 2005First EURISOL Design Study TOWN MEETING High Power RF Amplifiers Development at LNL Fabio Scarpa - INFN LNL.
S A Griffiths CM42 June 2015 Electrical & Control.
Chris Booth Sheffield 29th March 2006
Solid State Amplifier Development at PSI
MICE RF System Power Supplies, Control and Monitoring Status report
352MHz Klystron Control for the 3MeV Linac test stand
RF Status 1 4 High Power Amplifier circuits available CERN(2)
Presentation transcript:

Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status

Amplifier status Andrew Moss First medium power (300kW) amplifier and power supply system tested 2008 Refurbishment and rebuild of first high power (2MW) amplifier complete October 2009 Power supplies for first 2MW amp 100% complete Two further 300kW amplifiers awaiting repair Second 2MW amplifier stripped awaiting repair Two refurbished 2MW CERN amplifiers partly tested, inspected and awaiting build (in three parts currently) Still need to build 3 more sets of power supplies One more 300kW amplifier to buy/acquire

RF system components Andrew Moss 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module LBNLCERN 300 kW Amplifier HT Supplies Daresbury DL Test System At present Auxiliary Systems Not found

Test system at Daresbury Andrew Moss

Current status of components Andrew Moss

2MW amplifier status Final electrical checks September 2010 – crowbar/cathode modulator systems complete Drive 4616 amplifier and 2MW amplifier connected via flexi and tuning stub Water system, air blowers and compressed air have all been on Filament test to 500Amps on tube All auxiliary power supplies have been checked out ok Safety paperwork needs completing before we power system Andrew Moss

2MW amplifier system Andrew Moss Amplifier output Tuning stub to aid impedance matching between drive amplifier and large amplifier Input coax from 250kW amplifier Amplifier local control system

Second amplifier system Andrew Moss Support stand, wrong height – to match other amps, needs replacing, CERN drawing available All components from amplifier

Coax design Coax system will use large phase shifter to make amplifier immune to reflected power issues Hybrid power splitters to divide power before each cavity with a rejection load, this should provide a robust system Local phase shifters in each cavity coupler, small range available only, so need to plan coax system carefully to get phase lengths within range at the cavity input couplers – simulation will be done at Imperial college by Saad Power monitoring in each section of coax will be linked in to RF control system so that issues can be flagged before faults occur Nitrogen gas pressure system with the coax for voltage stand off and interlock Plan to have the ability to connect test loads in place of cavity to test amplifier/coax system in its complete configuration – will depend on space for components Andrew Moss

Coax layout for each cavity Andrew Moss

Hall design in progress Working with 3D CAD engineer at RAL to plan layout between the amplifiers and cavities –Additional effort from Imperial for amplifier testing and layout/design Measurements of system dimensions at Daresbury have been taken First step is a simple block diagram showing all components and how they are interconnected Then understand how to optimise components with the layout of the hall and the space available Result will be a complete parts list required for each cavity that we can go out for tender for when appropriate Will liaise with Don Summers to order components Andrew Moss

Future plans for this year Test of first large amplifier is priority - now Amplifier testing likely to take 4 – 6 weeks to optimise the system using old tubes, then replace with new MICE tubes and repeat tests carefully Assembly of the first CERN amplifier, refurbished unit however many small parts, CERN have offered to send two people for a few days to aid with the assembly of the unit – we will take up this offer Would need to buy more coax components to test this amplifier in our system – coax bends, straights and a combiner Test of CERN amplifier scheduled for March 2011 First amplifier will be delivered and installed in the MICE hall Andrew Moss

Conclusion Complete first RF amplifier system ready for test, now in progress Design of hall components between amplifiers and cavities is in progress and will lead to a formal design of the coax system, how it will be supported and the sequence of installation, this should be done by January 2011 Funding will allow building of CERN amplifier and refurbishment of other LBNL amplifier systems Andrew Moss