Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

Operating Reserves --- Again A Discussion Primer
WECC Standards Committee Joint Session
Phase 2 Composite Load Model Impact – RS Discussion From Draft Preliminary white paper dated 10/20/11.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
WECC Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June, 2010 WECC Reliability Subcommittee Report.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Goshen Area Bus Reconfiguration
RFC Webinar June 17, 2009 Presented By: Mark Kuras Chair, UFLS SDT.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
WECC and NERC Protection Criteria and Standards
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Project WECC-0100 Update Reliability Subcommittee February 2014.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Standards Subject to Enforcement Currently Or Standards Subject to Future Enforcement TSS Meeting #169 May 6-8, 2015 By: Lesley Kayser-Sprouse.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
14 Jan 2004Market Operations Standing Committee1 Special Protection Systems: Operational and Compensation Issues.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
WECC Standards Update Steve Rueckert Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
Next-day Study Task Force Jason Ausmus NDSTF Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Bert Peters Chair, Path Operator Task Force
WECC – NERC Standards Update
Calvert City Power I, L.L.C. (“Calvert”) Purpose of Meeting
Phase Angle Limitations
Inverter Disconnects During Transmission Disturbances
WECC Load Modeling and Validation Group Meeting
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Proposal to Remove from Service the PV-COI RAS
WECC Regional Standards Update
Path Operator Implementation Task Force
Updates to the Path Rating Process for Approval by the PCC
Phil O’Donnell, Manager Operations and Planning Audits
NERC TPL Standard Overview
Project WECC-0100 Update Load Modeling Task Force
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
Determine Facility Ratings, SOLs and Transfer Capabilities
Mgr. Interconnection Reliability Initiatives
Distributed Generation (DG) Modeling Criteria
Protective Relaying Conference
CMPLDWG Composite Model with Distributed Generation Approval
UNIT V STABILITY ANALYSIS 9
CMPLDWG Composite Model with Distributed Generation Approval
Phil O’Donnell, Manager Operations and Planning Audits
Project WECC-0100 Update Reliability Subcommittee
WECC Load Modeling and Validation Group Meeting
Steve Rueckert – Director of Standards
TONBRIDGE POWER GREEN LINE
TPL Voltage Guideline Presented to TSS Baj Agrawal Arizona Public Service Co. 8/21/2017.
Palo Verde-COI RAS Retirement
Project WECC-0100 Update Load Modeling Task Force
Proposal to Remove from Service the PV-COI RAS
WECC – NERC Standards Update
Palo Verde-COI RAS Retirement
Planning Meeting November 4, 2010 Marv Landauer.
Bert Peters Chair, Path Operator Task Force
Presentation transcript:

Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

R1.1 Steady State Voltage Applicability – All applicable BES buses. Criterion: –At all applicable BES buses –95% to 105% of nominal for P0 event, –90 to 110% of nominal for P1-P7 events Discussion –Steady state voltage range for P0 event originates in ANSI C84.1 standard. No difference for 500 kV for simplification. –Wider range for P1-P7 events to allow for contingencies. –Discussed definition of nominal. TP/PC can define nominal in their individual criteria applicable to voltage limits in their system.

R1.2 Post-Contingency Voltage Deviation Applicability - At each applicable BES bus serving load. Concerned with BES busses either feeding load directly or busses feeding lower voltage system that serves load Criterion: –Post-Contingency steady-state voltage deviation at each applicable BES bus serving load shall not exceed 8% for P1 events Discussion –The 8% for P1 events is based on some entities indicating a state regulatory need, and some entities allowing 8% voltage deviation for shunt reactive power device switching after an outage. The main concern is voltage deviation in downward direction. –For P2-P7 events it was concluded it would be acceptable to not have voltage deviation criteria that is more stringent than allowing the steady state voltage range in requirement R1.1.

R Transient Voltage Performance Applicability - At each applicable BES bus serving load. Applies to P1-P7 events R1.3 – Voltage recovery to 80% of pre-contingency voltage within 20 seconds –Consideration for FIDVR events based on comments and experience. –Recognizes some load loss initiated during fault can’t be prevented. R1.4 – With a fault, following recovery above 80%,Vdip below 70% for 30~, below 80% for 2 seconds. –Guidance from IEEE 1668 Trial Use Recommended Practice for Voltage Sag and Short Interruption Testing for End Use Equipment. Type I and II tests seem reasonable, most transmission faults are non 3-phase. –Helps minimize load loss for subsequent swings not due to fault. –Also reviewed IEEE 1547 Interconnecting Distributed Resources. –White paper developed with Posting 3. R1.5 – Same performance as R1.4 for contingencies without a fault (event P2.1). R1.6 – Oscillations positively damped within 30 seconds.

R1.3 Example

R1.4 Example

Impacts to Other Systems WR2. – If an entity uses more stringent Criteria than WR1 that Criteria applies only to their own system unless otherwise agreed to by all Planning entities involved. WR3 – If an entity uses less stringent Criteria than WR1 shall allow others to have same impact to that part of system. These requirements carry over from the previous Criteria requirement WR2 which allowed systems to apply different requirements than Table W-1. Retains the philosophy of “allowable effects on other systems”.

WR4. Cascading and Uncontrolled Islanding Threshold Criteria to identify potential for Cascading or uncontrolled islanding. Criterion: –Post contingency analysis results in steady-state facility loading either exceeding 125% or the known trip setting. –Transient stability voltage recovery to above 80% longer than 20 seconds. –When unrestrained successive load loss or generation loss occurs. Discussion –Since Cascading or uncontrolled islanding would manifest itself differently in different parts of the system, a threshold criteria was developed where further investigation would be warranted. –For unrestrained successive load or generation loss, it is anticipated this would be an iterative study process as determined by the entity.

WR5 Voltage Stability Positive reactive power margin for the following: –For transfer paths 105% or 102.5% of path flow for P0-P1 or P2- P7 events respectively. –For load areas 105% or 102.5% of forecasted peak load for P0- P1 or P2-P7 events respectively. Discussions –Did not find good technical justification for changing existing real power margins used in previous Criteria. –Path or load area assumed to be voltage stable by at least demonstrating the margins specified. Discussion this is a criteria for transmission Planning over the Planning Horizon, not a methodology to find system voltage stability limits beyond what the system is planned for.

WR6 Make Criteria Available Entity that uses study criteria different from criteria in WR1 shall make their criteria available upon request within 30 days.

Frequency Dip Criteria Frequency dip criteria is not included in this Criteria. A frequency dip criteria was included in Table W1 which was retired. Drafting team did not find good technical justification for frequency dip impact to load. Under frequency concern is to protect generators. UFLS designed in coordinated fashion based on frequency excursion to prevent excessive gen loss, not based on frequency dip as defined by previous criteria. PRC-006 Automatic UF Load Shedding defines requirements for PC’s developing UFLS Programs, WECC Off Nominal Frequency Requirements. Generator frequency capability requirements defined in NERC PRC-024

Next Steps Ballot Pool open 3/21 - 4/8 Ballot open 4/12 - 4/28 Next Board meeting June 2016

Questions?