Dose Rate Reduction Experiences of Piping Replacement at Fukushima Daiichi Unit 4 and 5 Atsutoshi Makihira ALALA Mini-Workshop Nov.9, 2005 Hamaoka NPS.

Slides:



Advertisements
Similar presentations
Work Health and Safety Section 6 ICA11v1.0
Advertisements

ANTIOXI – Advisory Board Meeting Klas Lundgren Page ANTIOXI Description of Work Packages 3 and 4 Klas Lundgren.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Braidwood Station Alternate Post Peroxide Cleanup Methodology.
Copyright [insert date set by system] by [CH2M HILL Entity] Company Confidential Update on Fukushima Daiichi NPP 1 – Preparations for Core Debris Removal.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
1 August 30-31,2010 Kyushu Electric Power Co.,Inc. Nuclear Power Operatio n Dept. Masahiro Yoshinaga Approach for dose reduction in Sendai NPS August 30-31,2010.
ACADs (08-006) Covered Keywords Pressurized Water Reactor (PWR), Boiling Water Reactor (BWR), primary loop, reactivity, reactivity control, reactivity.
OZONE DRINKING WATER SYSTEM. CONTENTS Properties of Ozone Production of Ozone Water Treatment Plant – 25 m 3 /hr Ozone Generation System.
Pool system components - solar collectors - Temperature probes relief pool - Solar pump system - Pump filtration system - Relief valve - air temperature.
1 TEPCO’s In-house Competitions for Improving Radiation Protection Skills Junichi TAIRA Tokyo Electric Power Company Radiation Protection Group ISOE International.
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
Measures for Reduction of Radiation Exposure at Higashidori Nuclear Power Station Nuclear Power Dept. Tohoku Electric Power Co.
1 OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2005 October 12, 2006 Shigeyuki Wada Safety Information Division Japan Nuclear Energy Safety.
Radiation Safety Management KHNP Lee Eung-Il HANUL Unit4 Steam Generator Replacement.
ISOE ・ ATC 2006 ALARA Symposium 1 Approach of Hitachi for Dose Rate Reduction October 12, 2006 Hitachi, Ltd.
ACADs (08-006) Covered Keywords Containment Isolation, actuation logic, Description Supporting Material
1 TEPCO’s ALARA Program (Basic Policy of Mid- and Long- Term Exposure Reduction) Toshiyuki HAYASHIDA Tokyo Electric Power Company Radiation Protection.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
0 Zinc Injection from Hot Functional Test in Tomari Unit 3 Nov MITSUBISHI HEAVY INDUSTRIES, LTD. HOKKAIDO ELECTRIC POWER CO., INC.
EPRI Radiation Management Program: Review of Radiation Field Reduction Strategies ISOE Asian Technical Center ALARA Symposium September 8th, 2009 Dennis.
Scott Cameron Manager Radiation Protection 2008 International ALARA Symposium ALARA Performance at OPG.
1 Dose reduction actions in Tsuruga-2 NPP Hiroshi WADA, Yuuichi HAMANAKA, Masayuki FUKUDA Tomomi YOSHINAGA, Eiji SANEHIRA,Masahiro YANO, Yasuo UNI, Kazushige.
1 TEPCO’s Challenges for Occupational Exposure Reduction -Installation of Additional CF in Fukushima Daiichi NPP- Shunsuke HORI, Akira SUZUKI Tokyo Electric.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
INCIDENT IN BUENOS AIRES. Argentina Buenos AiresQuilmes.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
Improvement of TEPCO’s ALARA Process Shiro TAKAHIRA Tokyo Electric Power Company Radiation Protection Group ISOE-ATC Symposium October 12, 2006, Yuzawa,
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
MONITORING MEETING EFDA Technology Workprogramme 2005 Activities Field: Safety and Environment Task Area: Waste Management TW5-TSW-001 Mol, June.
Dose Rate Reduction Methods at Shimane Nuclear Power Station Tadashi Kanaoka1, Hiroyasu Kajitani1, Tsuneo Sato1, and Naoshi Usui2 1The Chugoku Electric.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
Efforts to Reduce Radiation Exposure at the Takahama Power Station Takahama Power Station Kansai Electric Power Co.
OILGEAR PVV PUMPS PVV 200 Performance Curves.
The Improvement of ALARA for the Steam Generator Maintenance Radiation Safety Department The 3 rd Plant, Ulchin Nuclear Power Site.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Radiation Dosimeters.
IAEA International Atomic Energy Agency Occupational Radiation Protection during High Exposure Operations Lecture 2-2 Lessons Learnt from Occupational.
CONSTRUCTION OF SOUNDVIEW AVENUE SEWER LINING PROJECT INFORMATIONAL MEETING JULY 14, 2014; 7 PM STAMFORD GOVERNMENT CENTER 6 TH FLOOR TRAINING ROOM.
Activation Issues for ANU Peter Kasper 17-Sep-2007.
Symbols and Room Finishes
FESS/Ops Shutdown Summary Week Ending 3Aug12. CUB Shut-Down Activities Shut Down Plant on July 21 hrs. Electrical – High Voltage Air Switch/Fuse.
1 Activitiesfor Dose Reduction Hamaoka Nuclear Power Station Chubu Electric Power Co.,Inc. November 2005.
RPM Meeting , Essen Forsmark 1 Generator output net 968 MWe Critical reactor April 23, 1980 Commercial operation December 10, 1980 Forsmark 2.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
Hokuriku Electric Power Company Dose Reduction Measures at Shika Nuclear Power Station Unit-1 Takahashi Toshihiko Hokuriku Electric Power Company.
Control of occupational exposure when working within a reactor containment building at power Matthew Lunn British Energy Generation Ltd. Sizewell B Power.
CDRL Company Dose Restriction Level Simon Morris HSED Radiation Protection Adviser British Energy Generation.
Pollution Prevention & Management DentalBMPs. Overview Amalgam in POTW New EPA Guidelines City of Tulsa Dental BMPs.
Exelon Generation Radwaste Oversite and Management Mark Ross – Exelon Corporate Manager Radwaste Date: 04/24/2017.
YOSEMITE BY ARSAL.
Radiological Work Management Aspects influencing Dose Reduction at the Ignalina NPP during Outages and coming Decommissioning Radiation Protection Centre.
Improvement of TEPCO’s ALARA Process
Radiation Safety Management
Hg System Decommissioning Activities
Radiation protection of Linac4 M. Silari Radiation Protection Group
S0 Status report from KEK
Asbestos Employee Information and Training
ISOE Asian Technical Center ALARA Symposium September 8th, 2009
Module 3 Domestic Heating/MMA Welding
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
PLANNING TODAY FOR ALARA TOMORROW AT BEAVER VALLEY POWER STATION
25th Avenue Grade Separation
25th Avenue Grade Separation
Radiation protection challenges at EDF
TEPCO’s ALARA Program (Basic Policy of Mid- and Long- Term Exposure Reduction) Toshiyuki HAYASHIDA Tokyo Electric Power Company Radiation Protection Group.
CCTV System for Radiation Work Management
The Improvement of ALARA for the Steam Generator Maintenance
New Regulatory Requirements in Japan
Presentation transcript:

Dose Rate Reduction Experiences of Piping Replacement at Fukushima Daiichi Unit 4 and 5 Atsutoshi Makihira ALALA Mini-Workshop Nov.9, 2005 Hamaoka NPS

Removal Work Scope of Equipment and Floor Drain Piping 4(BWR4) Schedule Unit Work Nov.22, 2002 ~ May 21,2003 Removal:415m Installation:556m Reactor Building Suppression Pool Area West East Reactor Building Suppression Pool Area West East 5(BWR4) Jan.20, 2003 ~ Sep.26, 2003 : Drain Piping : Working Area Removal:446m Installation:446m

Dose Rate at Piping Before Replacement Work Unit 4 West 東側 Contact (max) 3.50 mSv/h Field (max) 1.30 mSv/h RHR piping Work area East Contact ( projection ) 6.00 mSv/h Filed ( projection ) 2.40 mSv/h Unit 5

RHR and Drain Piping at West Part of Suppression Pool Area RHR Piping Drain Piping

(1)Filed Dose Rate and Estimated Working Time per Person-Day (2) Estimated Working Time per Person with Annual Dose Limit <20mSv Unit 4 Exposure Dose at 2002 Remaining Dose at 2002 Filed Dose Rate ( Geometric Ave. ) Estimated Working Hours Estimated Working Days (4 hours/day) Max :8.64 mSv 11.36 mSv Min :0.00 mSv 20.00 mSv 0.151 mSv/h 約33日 Unit 4 1.30 mSv/h 0.9mSv/person-day41分 Field Dose RatePlanned ExposureEstimated Time 41min. 33 Unit 5 2.40 mSv/h 0.9mSv/person-day Unit 5 Max :8.64 mSv 10.36 mSv Min :0.00 mSv 20.00 mSv 0.300 mSv/h 約16日 16 22分 22min. Estimated Working Time for the Task

1. Work Schedule Conditioning Proposals for Improvement Unit 4 Increase of field dose rate ( ~ 1.3mSv/h) at west area because RHR is used for intermediate shutdown Shortage of temporary shielding materials for other high radiation work –Start working at east area –Work at west area after installing temporary shielding Unit 5 Installing scaffold and temporary shielding for the task during operation when RHR dose rate is low

Proposals for Improvement 2. Flushing Unit 4 High dose rate at RHR-4, RHR-41, RHR-23 because of RHR operation in shutdown –Flushing RHR-4, RHR-41 by using RHR(C) pump which circulates water in suppression pool –Flushing RHR-23 by opening MO-23 valve when RHR(C) pump running Unit 5 High dose rate at RHR-3, RHR-7, RHR-27 because of RHR operation in shutdown –Flushing by using RHR pumps which circulates water in suppression pool

RHR-Hx (B) DAB BA PLRポンプ PLR-5PLR-2 RHRー23 RHRー3 MO 15C MO 15A MO 13A MO 65 B MO 15 B MO 15 D MO 39A MO 34A RHR-22RHR-21 RHR-1 MO 13B MO 13D RHR-2 MO 25A MO 27A MO 20 MO 27B MO 66 B RHR-41 MO 12 B RHR-3 RHR-55 RHR-53 RHR-55 RHR-1RHR-21 RHR-7 PLR-1PLR-4 RHR-23 RHR-41 RHR-27 RHR-23 RHR-23 RHR-53 MO 38A MO 39B MO 38B RHR-23 RHR-26 RHR-24 RHR-3 RHR-4 RHR-6 RHR-3 RHR-53 RHR-3 RHR-7 RHR-8 RHR-27 RHR-28 MO 67 MO 57 RHR-52 RHR-44 RHR-47 RHR-51 RW へ RHR-3 C MO 13C MO 65A MO 12A MO 34B : Flushing line : High Dose Pipng RP V MO 66A S/C MO 25B RHR-Hx (A) C 非常時熱負荷運転により、線量当量率上昇!! 残留熱除去運転により、線量当量率上昇!! Flushing by use of RHR(C) pumps which circulate system water Open VMO-20 valve when circulate system water 2.Flushing(example) Proposals for Improvement Unit 4

3.Temporary Shielding Installing temporary shielding at high radiation piping after RHR flushing [ Unit 5 ] [ Unit 4 ] Installing temporary shielding at projected high radiation piping during operation Installing temporary shielding at high radiation piping after RHR flushing RW-1C ( Lead covered with SS ) Equipment Drain ( Lead covered with SS ) RW-209 ( lead blanket ) [ Installing during operation ] RHR-27 ( lead blanket ) [ Installing after flushing ] RHR-23 ( lead blanket ) Proposals for Improvement

Reactor water drained because of RRS replacement work High dose rate was projected at RHR-Hx, RHR pumps, suppression pool area Proposals for Improvement 4.Blow Down Water Treatment at Unit 4 R/B B floor suppression pool area R/B 1 st floor RHR-Hx room R/B B floor RHR pump area

Planned reactor water blow down twice First blow down water drained to suppression pool so as to second blow down which contains higher activity can be transferred to radwaste (because of capacity) Removing crud deposited on RPV bottom by temporary pump and filters Fill up RHR-44 with water before blow down for preventing crud deposition 4.Blow Down Water Treatment at Unit 4 Proposals for Improvement

5.Remote Monitoring 2 0.57 1 Dose indicator Wireless APD Remote monitoring of individual dose Transmittance Anorak Protective cloths Under wear worker A P D Worker Data transmittance APD I 。 Dose indicator Individual dose can be monitored even on cloths [ Unit 5 ] [ Unit 4 &5 ] APD I Proposals for Improvement

CUW-19 RW-1C Equipment Drain ( vertical ) Equipment Drain ( horizontal ) Vertical Piping Horizontal Piping CUW-19 Contact dose rate: 36.0% RW-1C Contact dose rate: 44.4% Field dose rate:20.0% Results for Improvement Equipment drain piping Contact:66.7% Field:88.7% Dose Rate Reduction Effectiveness after Installing Temporary Shielding RW-209 pipings Contact:66.7% Field:86.7% Unit 4