15.06.2005Threading / LTC/ JW1 How difficult is threading at the LHC ? When MADX meets the control system … J. Wenninger AB-OP &

Slides:



Advertisements
Similar presentations
Low Emittance Tuning (LET). Through Dispersion Free Steering.
Advertisements

Author - Title (Footer)1 LINEAR LATTICE ERRORS AT THE ESRF: MODELING AND CORRECTION A. Franchi, L. Farvacque, T. Perron.
Alignment and Beam Stability
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
Y. Ohnishi / KEK KEKB LER for ILC Damping Ring Study Lattice simulation of lattice errors and optics corrections. November 1, 2007 Y. Ohnishi / KEK.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Dynamic Aperture Study for the Ion Ring Lattice Options Min-Huey Wang, Yuri Nosochkov MEIC Collaboration Meeting Fall 2015 Jefferson Lab, Newport News,
EMMA Horizontal and Vertical Corrector Study David Kelliher ASTEC/CCLRC/RAL 14th April, 2007.
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
Beam Loss Simulation in the Main Injector at Slip-Stacking Injection A.I. Drozhdin, B.C. Brown, D.E. Johnson, I. Kourbanis, K. Seiya June 30, 2006 A.Drozhdin.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
June 2006LHCCWG / J. Wenninger1 Orbit response measurements and analysis J. Wenninger AB-OP Principle Software status Example from SPS ring and lines Potential.
LHC Workshop, Jan '05P. Collier AB-OP/LHC1 450 GeV P. Collier AB/OP  Prerequisites  First Turn  Getting Closure  RF Capture  Preliminary Commissioning.
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
Beam Based Optics Measurements CTF3 Collaboration meeting CERN Yu-Chiu Chao, TJNAF.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Tools in CTF3 Simona Bettoni for the CTF3 operation team.
1 Error study of non-scaling FFAG 10 to 20 GeV muon ring Shinji Machida CCLRC/RAL/ASTeC 26 July, ffag/machida_ ppt.
CEPC DA due to magnets' error Sha Bai, Dengjie Xiao, Yiwei Wang, Huiping Geng, Dou Wang, Tianjian Bian, Feng Su, Jie Gao The first IHEP-BINP CEPC Accelerator.
26 January 2006Chamonix LHC Project1 Chamonix 2006 – LHC Project Workshop Proposed tests with beam B.Goddard AB/BT Input from L.Bottura, B.Dehning,
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
Polarization studies for CEPC
Alignment and beam-based correction
Orbit Response Matrix Analysis
Steering algorithm experience at CTF3
FiDeL: the model to predict the magnetic state of the LHC
Low Emittance Tuning Tests at the Diamond Light Source (Rutherford Labs) Dec R. Bartolini, S. Liuzzo, P. Raimondi SuperB XV Meeting Caltech, CA,
Beam Steering Tools ‘Slow’ Steering Orbit feedback Status & plans
Field quality update and recent tracking results
Emittance growth AT PS injection
Optimization of Triplet Field Quality in Collision
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Status and needs of dynamic aperture calculations
Field quality to achieve the required lifetime goals (single beam)
FCC-ee Lattice with Misalignments
3rd ATF2 Project Meeting, December 18-20, 2006
UPDATE ON DYNAMIC APERTURE SIMULATIONS
Thursday morning – optics correction
Machine studies during beam commissioning
Sector Test - General objectives
Alice solenoid – orbit distortion
CEPC main ring magnets’ error effect on DA and MDI issues
Beam-Based Alignment Results
LHC Closed Orbit For Beam 2
Machine Tolerances in Cleaning Insertions
450 GeV Preliminary Commissioning: Measurement Programme
Orbit response measurements and analysis
OCELOT orbit correction and optimizer
Quadrupole error localization using Response Fits
Simulation of the FCC-ee lattice with quadrupole and sextupole misalignments Sergey Sinyatkin.
Optics Measurements in the PSB
TI8 analysis / J. Wenninger
Triplet corrector layout and strength specifications
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Multipole Limit Survey of FFQ and Large-beta Dipole
First Look at Error Sensitivity in MEIC
Multipole Limit Survey of Large-beta Dipoles
G. Wei, V.S. Morozov, Fanglei Lin MEIC R&D Meeting, JLab, Oct 27, 2015
LHC An LHC OP guide… under construction J. Wenninger
Summary and Plan for Electron Polarization Study in the JLEIC
DYNAMIC APERTURE OF JLEIC ELECTRON COLLIDER
Error Sensitivity in MEIC
Status of RCS eRHIC Injector Design
Sha Bai CEPC AP meeting Work summary Sha Bai CEPC AP meeting
Presentation transcript:

Threading / LTC/ JW1 How difficult is threading at the LHC ? When MADX meets the control system … J. Wenninger AB-OP &

Threading / LTC/ JW2 Threading issues Threading can be delicate : Installation ‘surprises’ : polarities, alignment, obstacles… Beam position monitor quality. And at the LHC we also have ‘large’ multipole field errors, and they do contribute (see also A. Verdier, LHC note 308).  Compare : Dipole : 10 units of b3  kick : 2  rad / r = 10 mm Quad : 0.4 mm misalignment  kick : 11  rad  Effect of b3 ~ r 2  Expected |b3| after decay ~ 2-4 units : rather small effect for r < 10 mm !

Threading / LTC/ JW3 Threading strategy Successful LEP strategy : Select a reasonably short range where the amplitude starts to grow : shorter : minimize # errors within region. longer : less sensitive to isolated BPM errors. Use few correctors (1-3) : polarity & bad BPMs. MICADO algorithm.  ‘LEP threader’ Example for a first LHC b1 Horizontal Vertical Detection of poor BPMs : Look at orbit in normalized coordinates Compare predicted and achieved correction. Use your experience (if you have any…). Detection of COD errors : Compare predicted and achieved correction  use few CODs / step.

Threading / LTC/ JW4 Threading strategy / 2 Example for a correction, H plane Difference After correction Target region for correction Before correction Compare this with achieved results – in case of doubt  Good online tools needed : LEP standard with improvements !

Threading / LTC/ JW5 Threader simulation The simulation of threading is tricky because : Involves a lot of pattern recognition. Range selection (start of oscillation), suspicious BPM detection… Normalized coordinate inspection, trajectory fits, response analysis of correction… Unexpected situations. A realistic simulation is very complex and time consuming to set up. A human being is >>> powerful than algorithms for such a task, time investment into automatic algorithm is immense … and difficult to check ! I favor the approach of a CR steering application with well adapted and powerful (manual) tools for the first beams.  idea : couple the steering application which already exists to MADX and make a realistic threader test & training tool ! Verify that online tools are up to the job !

Threading / LTC/ JW6 Threader simulation MADX Corrector changes Trajectory file Aperture cuts, noise…. ‘Conditioned’ trajectory file ‘Real-life’ first turn threading simulation : LHC beam1 treated as a transfer line. Trajectories simulated in MADX with errors… MADX output is conditioned to take into account aperture, add noise… Conditioned data is imported into the control system steering program. Correction evaluated and re-exported to MADX. Iterate, iterate…

Threading / LTC/ JW7 Aperture assumptions Start from arc aperture : 22 / 17 mm. Remove 2 mm for alignment. Remove 2 mm for beam size (2-3 sigma)  50% loss. Remove 2 mm for ‘unexpected/other’ effects.  Effective aperture : 16 mm horizontal / 11 mm vertical. This aperture is applied EVERYWHERE along the ring.  Consider the beam as lost if trajectory exceeds those values. Other choices are of course possible…

Threading / LTC/ JW8 Threading exercise Conditions : Dipoles : -b3 = -20 units (systematic) -other components : standard error table Multipole correctors : OFF BPMs : perfect ! Quads : -misalignment : 0.4 mm rms (gauss). -b2 = ± 50 units random, flat distribution  ~ 25%  -beat (closed orbit) 12 iterations of LEP threader

Threading / LTC/ JW9 And one more.. Conditions : Dipoles : -b3 = -20 units (systematic) -other components : standard error table Multipole correctors : OFF BPMs : ± 3 mm errors, flat distribution. Quads : -misalignment : 0.4 mm rms (gauss). -b2 = ± 200 units random, flat distribution  > 100%  -beat (closed orbit) 13 iterations of LEP threader

Threading / LTC/ JW10 Debriefing / 1 Surprised by the insensitivity to quad errors ? Consider a misaligned quadrupole producing a 10 mm amplitude oscillation. A 2% error on the strength changes the amplitude to 10.2 mm..  very small !  in the noise of the 3 mm BPM errors ! A transfer line is less sensitive to errors (at least for steering), in particular over small sub- ranges. Using  -beat as gauge is not ideal ! BPM effects : Random BPM errors of 3 mm have little effect. The same applies to ISOLATED very bad BPMs (10 mm offsets, signs…). Things get tough if more than ~ 1/4 BPMs are in the ‘very bad’ category, or if you depend on one BPM that falls into the same category (loss over very short range) :

Threading / LTC/ JW11 Debriefing / 2 Threading seems not more complicated than at LEP… Need to add a few more errors : momentum offsets, polarity inversions,… Repeat the exercise for a LEP lattice and check if the threading difficulty corresponds to what was observed at the time. Interesting observation from LEP : we managed (more than once !) to thread the beam through the first turn and establish a closed orbit with the integer tune off by 0.5 ! Errors : The fact that threading is not too sensitive too errors is no reason to relax on measurement and installation quality !

Threading / LTC/ JW12 Outlook  With MADX and the present version of the steering program for the CR, one can already practice threading!  At first sight threading is not so terribly difficult, at least without dramatic problems (like polarity reversals of quads…).  The full monty should be available before next Chamonix :  Injection errors, energy offsets, quadrupole polarity, …  More subtle BPM errors : signs, calibrations, mega-offsets…  Corrector polarity errors.  …  Next step :  From the first turn to the closed orbit !  A sector test is invaluable as preparation for the full first turn to test all the concepts on the ground floor level !