ERCOT Market Education Market Role in Emergency Operations OTS 2016.

Slides:



Advertisements
Similar presentations
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Advertisements

IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
NPRR605 Ancillary Service Make-Whole Payments Under a Watch.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Operational Issues.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
ERCOT Monthly Operational Overview (July 2012) August 15, 2012.
Settlement Update Blake Holt ERCOT 2/15/2016. Agenda NPRR689 – R1 – 02/10/16 NPRR744 – Buy-Back notification NPRR746 – Negative load impacts 2016 Settlement.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
WRUC – Long Lead Time Commitments QSE Manager’s Working Group ERCOT Operations March 23, 2016.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
ROS Presentation: Dynamic Scheduling and EEA Austin, TX September 10, 2009 Steve Isser Vice President and General Counsel Good Company Associates
NSRS in Nodal Proposal for Deployment & Recall Procedures ERCOT ROS 10/12-13/2006 By: S.Niemeyer R.Jones R.Wheeler B.Green J.Dumas P.Breitzman.
Nodal Program Update to Cops
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
ERCOT Market Design & Operations
General Overview Of Resource Costs
John Dumas Director, Wholesale Market Operations
RTDF Overview of Data Analysis & Status of “Consesus Items”
Real-Time Co-optimization of Energy & Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Representing Rainbow Energy Marketing Corporation
Overview of New Control Room Desk
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Load Participation in SCED v1 Overview & Refresher
Presentation transcript:

ERCOT Market Education Market Role in Emergency Operations OTS 2016

PUBLIC Module Objectives 2 Upon completion of this module, you will be able to: Identify the role of the Market in a declared EEA List three steps ERCOT may take to procure additional Ancillary Services in Real-time. Predict the settlement outcomes for a Resource Committed by RUC. Identify the process and implications for opting out of the RUC commitment. Recognize the economic value of Real-Time Capacity Reserves.

PUBLIC Energy Emergency Alert 3 The Energy Emergency Alert (EEA) provides orderly pre-determined procedures for operating under short supply conditions. At times, it may be necessary for ERCOT to reduce System Demand because of a temporary decrease in available supply.

PUBLIC Market Role in Reliability Operations 4 So how do the Markets contribute to reliable operations immediately before and during an EEA? The same way they always do!

PUBLIC Market Role in Reliability Operations 5 The ERCOT market systems are designed to... Manage reliability Match generation with demand Operate transmission system within established limits Operate the system at least cost

PUBLIC Market Role in Reliability Operations 6 Even in an EEA, the protocols require Use of market processes to the fullest extent practicable without jeopardizing the reliability of the ERCOT System

PUBLIC Market Role in Reliability Operations 7 But before we get to an EEA... ERCOT may need additional Ancillary Services ERCOT may need additional Capacity for SCED Reliability Unit Commitment (RUC) Self-commitment through pricing signals

Ancillary Services Insufficiencies

PUBLIC AS Insufficiencies in Adjustment Period & Real-Time 9 In Adjustment Period & Real-Time: AS Insufficiencies detected by AS Capacity Monitor ERCOT must issue Watch Plan to address the situation depends on time insufficiency is discovered AS Insufficiency Watch

PUBLIC AS Insufficiencies in Adjustment Period & Real-Time 10 In General... If time, conduct a SASM Next, use HRUC to commit Resources with status of OFF Lastly, assign to Resources with status of ON SASM HRUC Assign

Reliability Unit Commitment

PUBLIC Reliability Unit Commitment 12 Purpose of Reliability Unit Commitment (RUC) It ensures: Enough capacity is committed to serve the forecasted load Committed capacity is in the right locations

PUBLIC If ERCOT commits a Resource through RUC Operational Considerations Update COP – ONRUC Must start/run resource if available May not provide ancillary services Financial Considerations ERCOT provides QSE with a payment guarantee May provide “Make-Whole Payment” ERCOT ensures Energy Offer Curve is priced at or above $1500

PUBLIC RUC Make-Whole Payment 14 What if revenues are less than cost? Make-Whole Payment Minimum Energy Costs Start-up Costs Revenues Received $ Costs Incurred Real-Time Revenues Incremental Energy Costs RUC Guaranteed Amount Revenues = RTSPP * Metered Generation Costs come from Three Part Supply Offer

PUBLIC RUC Make-Whole Payment 15 What if revenues are greater than cost? Minimum Energy Costs Start-up Costs Real-Time Revenues Incremental Energy Costs $ Revenues Received Costs Incurred

PUBLIC RUC Make-Whole Payment 16 What if revenues are greater than cost? Minimum Energy Costs Start-up Costs Revenues Received $ Costs Incurred Clawback Charge Real-Time Revenues Incremental Energy Costs But how does ERCOT determine how much to clawback?

PUBLIC RUC Clawback Charge 17 Clawback Factors depend on the circumstances: Three-Part Supply Offer in DAM No Three-Part Supply Offer in DAM RUC Clawback Factor for RUC hours 50%100% RUC Clawback Factor for QSE hours 0%50%

PUBLIC RUC Clawback Charge 18 If an Energy Emergency Alert is in effect: Three-Part Supply Offer in DAM No Three-Part Supply Offer in DAM RUC Clawback Factor for RUC hours 0%50% RUC Clawback Factor for QSE hours 0%50%

PUBLIC A QSE may opt out of RUC settlement 19 Operational Considerations Update COP – ONOPTOUT Must start/run resource if available May provide ancillary services Financial Considerations No RUC Make-Whole Payments No Clawback Charges No requirement for energy to be priced at or above $1500

Real-Time Pricing Considerations

Real-Time Ancillary Service Imbalance Real-Time Pricing1 2

PUBLIC Real-Time Pricing Methodology Scarcity pricing – higher energy prices during periods where energy reserves are scarce ERCOT is an energy-only market Sufficient pricing for new investment Appropriate price signals

PUBLIC Real-Time Pricing Methodology Time Price of Energy ($ MWh) SWCAP SCED can set Scarcity Pricing under the right conditions

PUBLIC Real-Time Pricing Methodology But there is additional value for Real-time Reserves Sufficient real-time reserves help avoid load-shedding events There is value in avoiding load-shedding events Value of real-time reserves = Value of avoiding load-shed Therefore, we may deduce...

PUBLIC Real-Time Pricing Methodology ERCOT implemented an Operating Reserve Demand Curve on June 1, 2014 Created a Real-time Price Adder to reflect the value of available reserves Reflects Value of Lost Load (VOLL) Based on Loss of Load Probability Value of Lost Load (VOLL) is administratively set to $9000.

PUBLIC Operating Reserve Demand Curve VOLL

PUBLIC Real-Time Pricing Methodology Time Price of Energy ($ MWh) $9000 SCED can set Scarcity Pricing under the right conditions Reserve Price Adder improves Scarcity Pricing

PUBLIC Reserve Pricing Methodology But not all reserves are created equal... Some are available to SCED immediately Some can be made available to SCED in 30 minutes What are some examples of each?

PUBLIC Reserve Pricing Methodology ERCOT System RTORPAReal-Time On-Line Reserve Price Adder RTOFFPAReal-Time Off-Line Reserve Price Adder … calculated each SCED interval Real-Time Reserve Price Adders RTORPA –Available during the next 30 minutes RTOFFPA – Available during the next 60 minutes

PUBLIC Real-Time Pricing Methodology LMPs are location-specific. Reserve Price Adders represent the value of reserves ERCOT-wide. Resource Nodes Load Zones Hubs Settlement Point Prices (SPPs) SCED produces LMPs LMPs are combined with Reserve Price Adders to form Real-Time Settlement Point Prices

Real – Time Pricing Considerations Real-Time Ancillary Service Imbalance Real-Time Pricing1 2

PUBLIC Real – Time Ancillary Services Imbalance 32 The Basic Idea: ( ) On-line Reserve Price (-1) – On-Line Reserve SUPPLIES On-Line Reserve OBLIGATIONS ( ) Off-line Reserve Price – Off-Line Reserve SUPPLIES Off-Line Reserve OBLIGATIONS + x x Calculated ERCOT-wide per QSE

PUBLIC Real – Time Ancillary Services Imbalance 33 SCENARIO How’s it settled? Energy Produced Real-Time Generator Paid at Real-Time SPP ? HSL Paid in Real-Time AS Imbalance Price: On-line Reserve Price ?

PUBLIC Real – Time Ancillary Services Imbalance 34 SCENARIO AS Capacity Energy Produced Real-Time Generator Paid at Real-Time SPP ? HSL Paid in DAM or SASM Price: MCPC ? How’s it settled?

PUBLIC Real – Time Ancillary Services Imbalance 35 SCENARIO AS Capacity AS Deployed Energy Produced Real-Time Generator Paid at Real-Time SPP ? HSL Charged in Real-Time AS Imbalance Price: On-line Reserve Price ? How’s it settled?

PUBLIC Real – Time Ancillary Services Imbalance 36 SCENARIO Energy Consumed Real-Time Controllable Load Resource Charged the Real-Time SPP ? HSL LSL Paid in Real-Time AS Imbalance Price: On-line Reserve Price How’s it settled?

PUBLIC Module Summary 37 You should now be able to: Identify the role of the Market in a declared EEA List three steps ERCOT may take to procure additional Ancillary Services in Real-time. Predict the settlement outcomes for a Resource Committed by RUC. Identify the process and implications for opting out of the RUC commitment. Recognize the economic value of Real-Time Capacity Reserves.