129-Sep-16 | A FAGERHULT Group company Canary Wharf Crossrail Station Platform Edge Lighting.

Slides:



Advertisements
Similar presentations
STATESMAN Campers, Raising the standards. STATESMAN XP- 1.
Advertisements

Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Open Frame Racks & Accessories. 2 Application ‣ 2/4-Post Open Frame Racks combine the mounting security of a cabinet with the accessibility of a rack.
 Salient characteristics / Approvals  Cast Aluminum Enclosures  Plastic Enclosures  Cast Aluminum Control Station as per customer requirement Control.
6/23/11 FAIS,LLC Five Apple/Inpatient Specialist Case Study Patient Volume/LOS/ Payor Source Data.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
The AFD-01, part of FIRE END range of steel doors, is an economical flush door set, for most internal or external applications in commercial buildings.
Advanced Advanced Aluminium Aluminium Technology Technology.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Calendar for 2011 Months of the Year with Holidays.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
TAKE ‘N’ TRAIN ZONEX™ NON-METALLIC TERMINAL ENCLOSURE.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
Texture coating system: give your house an elegant look
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Gantt Chart October November December Step One Step Two
Churches and Community Energy: a case study from St
Redevelopment Projects & Contracting Opportunities
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Most Effective Method to Select the Fence For your Home
ROBUST.
Pine cove pit time lapse drone photos
ZUMTOBEL KXB 2/36W EVG ZONE 2/ Description
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
13-block rotation schedule
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
McDonald’s Kalender 2009.
Friday 19th November 7.30 pm Prayer for Transformation
January Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
ELEEA LRO-D 2x1/28W LDE WH AB L840
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
January MON TUE WED THU FRI SAT SUN
McDonald’s calendar 2007.
1 - January - Sun Mon The Wed Thu Fri Sat
Proud As A Peacock! We are very proud of__________________
Teacher name August phone: Enter text here.
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
ZUMTOBEL TUBILUX PC 1/58W T26 EVG Description
The Transformation of A Small Company Into A Golden Legend
| January Sunday Monday Tuesday Wednesday Thursday Friday
ZUMTOBEL LINARIA 1/49W T16 PM LDE Description
January MON TUE WED THU FRI SAT SUN
MONTHS OF THE YEAR January February April March June May July August
S M T W F S M T W F
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
McDonald’s calendar 2007.
ZUMTOBEL ACQUO2 1/58W T26 VVG I KST IP Description
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
Habitat Changes and Fish Migration
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
2015 January February March April May June July August September
Habitat Changes and Fish Migration
ZUMTOBEL TUBILUX PC 75W LED EVG Description
Presentation transcript:

129-Sep-16 | A FAGERHULT Group company Canary Wharf Crossrail Station Platform Edge Lighting

229-Sep-16 | HERITAGE Founded in 1963 Proud to have always been based in the London Borough of Sutton Part of the community that will benefit from Crossrail We welcome the business & social opportunities Crossrail will bring

329-Sep-16 | VISION We strive to be the first choice supplier of specialist lighting products for underground rail applications The majority of our fittings comply to Section 12 and Standards and 1-066, with glass diffusers, low smoke cables and appropriate paint finish

429-Sep-16 | EXPERTISE Over five decades experience supplying thousands of highly durable, robust and energy-efficient lighting solutions to enhance the safety and operability of underground & surface rail environments

529-Sep-16 | Underground Rail Experience

629-Sep-16 | Over three decades of collaboration with London Underground Limited Our robust, low maintenance fittings installed at stations including Kennington, Tufnell Park, St John’s Wood, Chalk Farm, Acton Town, Green Park and also along the East London line.

729-Sep-16 | At Canary Wharf station, close co-operation with the design team resulted in the development and installation of our Terminus range, which took advantage of advances in glass technology to improve performance and aesthetics.

829-Sep-16 | We also have extensive experience with Strathclyde Public Transport subway stations, Merseyrail and the Tyne Metro system.

929-Sep-16 | Extensive international sub-surface station experience includes – St. Denis, Stade de France, Paris – Metro North in New York City – Heyzel, Demey, Lemonnier, Porte de Hal in Brussels – Guangzhou, Guangdong, China

1029-Sep-16 | Canary Wharf Crossrail Station

1129-Sep-16 | THE JOURNEY SO FAR… November 2013 – nterlayer material sourced, glass manufacture begins End of October 2013 – Explosion testing done September 2013 – Material recommended by LUL and Crossrail September 2013 – Investigation into back lit & glass interlayer 30th August 2013 – Look at back lit options by Crossrail July 2013 – Prototyping design work completed 28th July 2013 – First prototype commenced August 2013 – Glass manufacturer recommends 2x6mm panels August 2013 – Internal reflectors and LEDs worked on prototype 25th June 2013 – Enquiry from CWC for PED lighting 26th June 2013 – Enquiry from Astec for PED lighting 28th June 2013 – Prices issued to Astec 2nd July 2013 – Initial light box design begins 3rd December 2013 – Crossrail viewed top & back lit options January 2014 – LED array & hinging gear trays designed February 2014 – New prototype commences manufacture 19th March 2014 – Prototype reviewed by Crossrail 27th May 2014– Final review of lightbox by Crossrail 2nd June 2014 – Meet LUL compliance team re-glass approval 10th June 2014 – Review of lightbox by CW team 11th June 2014 – Review visit from Crossrail and LU 9th July 2013 – Drawings issued to Astec 20 th July 2014 – See mock up at Leighton Buzzard

1229-Sep-16 | PED LIGHTING SPECIFICATION Reference: BES/2125B LED light box for platform lighting IP65 dust tight and moisture proof construction LED arrays mounted to removable hinged gear tray, wired via fused terminal block and slip LED DALI Dimmable Driver mA Zinc-coated steel body finished in chemical and abrasion resistant polyester powder coating RAL9016 white. Sides finished RAL9011 Black Laminated toughened glass panel 2x6mm low iron glass sheets with special interlayer for diffusion, silicone bonded to body Plug to mains ceramic terminal block Estimated weight: 80kg Dimensions: 1500 x 1050 x 150mm Supplied with custom made brackets

1329-Sep-16 | DEVELOPMENT SKETCHES

1429-Sep-16 | ?

1529-Sep-16 | A FAGERHULT Group company Thank you! We would appreciate any further questions you may have.