SPES Selective Production of Exotic Species. SPES Steering Committee - Operative since july 2007 - 22 meetings – next on March 2012 - All documents (minutes,

Slides:



Advertisements
Similar presentations
EURISOL Peter Butler University of Liverpool
Advertisements

1 NuPECC/ERA-NET, Paris; 27 May 2005 NuPECC LRP & Nuclear Physics ERA-NET Muhsin N. Harakeh NuPECC & KVI.
ERA-NET Cooperation and coordination of national research and innovation activities Last call 2005 Deadline September-October.
NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1.
EURISOL Transition period MYRRHA and
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
EURISOL (and the European ISOL roadmap) Yorick Blumenfeld* (CERN) *on leave from IPN Orsay.
Alex C. MUELLER Physics with a multi-MW proton source, CERN, Geneva, May Additional Installations for a Nuclear Physics Facility Alex C. MUELLER.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
SPES Project Selective Production of Exotic Spe Selective Production of Exotic Species Gianfranco Prete LNL-INFN On behalf of the SPES Collaboration.
Status of EURISOL Yorick BLUMENFELD We acknowledge the financial support of the European Community under the FP6 “Research Infrastructure Action - Structuring.
Page 1 Rencontre de Moriond, March RIB production with SPIRAL 2 1.Versatile and evolutive 2.Fission fragments with D beamGoal > fissions/s.
Alex C. Mueller, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 EURONS 1st annual report: Generalities (I)  With an EC contribution of 14,056,000.
A facility for Nuclear, Atomic, Material and Radiobiology Sciences. Delivering stable (from C to U) and radioactive ions (from He to Xe) in the energy.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
Cross section measurements at LNL M.Mezzetto (INFN-Pd) on behalf of INFN-LNL: M. Cinausero, G. De Angelis,G. Prete.
EURISOL – Distributed Facility (DF) Y. Blumenfeld, M. Lewitowicz, P. Van Duppen, A. Maj Background : EURISOL RTD : EURISOL Design Study.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
SPES Project Selective Production of Exotic Spe Selective Production of Exotic Species Gianfranco Prete LNL-INFN On behalf of the SPES Collaboration 6-11.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
A Plan to Construct a Rare Isotope Accelerator Facility KoRIA S. W. Hong Sungkyunkwan University (SKKU) On behalf of Conceptual Design Project Team S.
SPL, a driver for EURISOL? Yorick Blumenfeld* Isolde-CERN * On leave from IPN Orsay We acknowledge the financial support of the European Community under.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Status of the EURISOL Design Study Yorick Blumenfeld IPN Orsay.
NuPECC Mapping Studies FINUPHY/EURONS I3 EURONSFINUPHY/FP5 EURONS/FINUPHY Meeting, Funchal (Portugal), 7-9 February 2005 NuPECC Report 2002 “Impact, Applications,
Mapping Studies In preparation NuPECC Handbook 2004 “International Access to Nuclear Physics Facilities in Europe”, 5th Edition In print NuPECC Long Range.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
SPES. 1.Develop a Neutron Rich ISOL facility delivering Radioactive Ion Beams at 10AMeV using the LNL linear accelerator ALPI as re-accelerator. 2.Make.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Coseners meeting Sept Future of European ISOL Peter Butler.
UK Research in Nuclear Physics P J Nolan University of Liverpool.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
SECONDARY-BEAM PRODUCTION: PROTONS VERSUS HEAVY IONS A. Kelić, S. Lukić, M. V. Ricciardi, K.-H. Schmidt GSI, Darmstadt, Germany  Present knowledge on.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
DF ALTO IN2P3 DF ISOLDE CERN SPES INFN SPIRAL2 GANIL MYRRHA SCK-CEN … COPIN EURISOL – Distributed Facility (DF) Initiative H. Savajols – Convenor.
Summary: Physics Opportunities for ISOLDE and n_TOF Peter Butler.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
EURISOL-NET 27 June 2011 Alberto Andrighetto Recent results on development of the SPES production target Alberto Andrighetto LNL-INFN.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
Comprehensive investigation of the decay losses in the ISOL extraction method KP2 Seminar, Strahinja Lukić.
European Small-Scale Accelerator Facilities S. Harissopulos: NuPECC Strategy Meeting, Darmstadt, January 16, 2016.
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
Summary of IAP comments from 2007 EURISOL Town Meeting
ISOL technique for radiopharmaceuticals development
Discussions on preparations for future (joint) research projects
Witold Nazarewicz (HRIBF scientific director)
The Future of EURISOL Results from the Design Study
Design of a General Purpose I/O Controller for Particle Accelerators
The European Strategy for Particle Physics
for the EURISOL Steering Committee
TTC - JLab - Bob Laxdal - TRIUMF
Accelerator Research and Innovation for European Science and Society
Acceleration of RIB using linacs
Status of the beta-beam study
SPES-RFQ review Introduction, general aspects
Progress of BRIF and CARIF
Superbeams with SPL at CERN
EMIS, 2002, Victoria, Canada Mats Lindroos for PSMB Mats Lindroos.
ADS Accelerator Program in China
Progress towards Pulsed Multi-MW CERN Proton Drivers
Introduction TO PHYSICS WITH SPES
restart EXCYT operation
A High Intensity Neutrino Oscillation Facility in Europe
The SPL-based Proton Driver at CERN
WELCOME at – one day workshop-LNS CATANIA
Status of the JLEIC Injector Linac Design
Presentation transcript:

SPES Selective Production of Exotic Species

SPES Steering Committee - Operative since july meetings – next on March All documents (minutes, recommendations, presentations, letters…) are on the DocServer presentations, letters…) are on the DocServer of LNL: of LNL: - Renewed on july 2010

Paolo 2010 up to now

Evaluation of the Status of the project: Work done on: - production target - Trasco project – BNCT Discussion on the p driver: a) Trips-RFQ-DTL b) Commercial ciclotron Initial work

ISOL Possible configurations: 1 STEP: 1 STEP: Direct beam on target 2 STEP : converter + Production Target Multi MW power 100KW power UC x Beam n,  Converter p,d UC x Proton Beam p

SPES project 2002 (d) (1- 3 mA) The project was evaluated on 100Meuro The target handling is very challenging 4Kg 100KW

Alberto Andrighetto 2007 The SPES Multislices Target The SPES Multislices Target DTL or Cyclotron

SPES Project: the accelerators 1E13 f/s A direct target with 8KW power capability was studied to allow the use of a 40 MeV proton beam to produce 1E 13 f/s P-40 MeV 0.2 mA High. res selection X +1 Charge breeder On +20kV X +n Bunching RFQ PIAVE SRFQ ALPI DTL Separation high and low radiation zones 238 U target +20 kV 30 g UCx 8kW RFQ Source TRIPS BNCT Neutron source 30 mA 150 kW 5 MeV Low res selection 11 MeV/u for 132 Sn keV/u 2.5 keV/u

Brasatura del Terzo modulo dell’RFQ (CERN, ): allineamento degli elettrodi Preliminarmente alla brasatura dei 4 elettrodi si è proceduto all’allineamento degli stessi in base ai setting forniti in fase di caratterizzazione RF del modulo Estrazione degli elettrodi laterali A e B di 50  m per mezzo di spessori calibrati Per la misura di allineamento è stato usato un comparatore con precisione mm Specifiche di allineamento raggiunte entro 10  m di precisione (quindi entro il tuning range) Tavolo di grafite Comparatore Supporto di Al AB Setup di misura Allineamento elettrodi mediante spessori calibrati e blocchetti rettificati RFQ3 pronto per la brasatura Tavolo di marmo (planarità mm)

Best Cyclotron INC. Main Characteristics: Beamsp ENERGY MeV Current750  A Extracted BeamsDual Port Exit  A Beam Loss< 5% Affidability5000 hours/year Main Characteristics: Beamsp ENERGY MeV Current750  A Extracted BeamsDual Port Exit  A Beam Loss< 5% Affidability5000 hours/year

-Definition of project layout -Long term plan: financial, manpower -Master plan of the activities (milestones) -Tecnical Design Report (TDR) Scientific part Scientific part Initial Work

- Choise of the driver: commercial ciclotron Comparative table of the two solutions on the base of doscussions with the experts of LNL and LNS.Tabella_comparativa_ SPES.pdfTabella_comparativa_ SPES.pdf -Organization: formation of tasks with referents. Subgroups of the Steering to follow specific Task activities. Contact with the task leaders. Plenary meetings: - reports from the Steering subgroups, - presentations from the task leaders Recommendations

Sinergies between the Tasks Manpower (LNL-LNS, collaboration with other Institutions, strengthening) Working progress and critical points Delay in the Milestones due to the organization and/or the lack of manpower (ALPI Low beta upgrade) Recommendations

Internationalization: - Construction of the facility MoU with foreign laboratories (SPIRAL2, ISOLDE, Oak Ridge…) - Physics: Workshops, LoI, Instrumentation, International Committees (Discussion with LNL PAC) Recommendations

● Italian Community Initiative in the CSN3 ● Strategy for the future Recommendations

FINANCIAL REQUESTS -Evaluation and approval of financial requests from the project leader (SPES allocated and ordinary funds) -Discussed and approved the financial planes 2011 and 2012

SPES in the European Context

Recommendations Radioactive Ion Beam (RIB) Facilities The continued strongest support for the full completion and utilization of the international RIB facilities, and SPIRAL2, in coherence with the ESFRI recommendations (2005, updated in 2008) which had prioritized their implementation. The strongest support for the full completion and utilization of HIE-ISOLDE, recently approved (2009) by CERN, and SPES, funded by INFN. These advanced ISOL facilities, together with SPIRAL2, will bridge the technological gap between present day facilities and EURISOL, the next generation ISOL facility for Europe. The realization of EURISOL. This long-term goal is the highest priority of our community for a future major facility that offers unique physics opportunities. Accession to the ESFRI list, based on the extensive Design Study for EURISOL carried out during the last decade, should be promoted in the near future NUPECC Long Range Plan 2010 SPIRAL2, HIE-ISOLDE and SPES form a network of advanced radioactive beam facilities that are paving the way for the ultimate European ISOL facility EURISOL.

Sinergies and Complementarities between the II generation RIB facilities ● Different primary beams, Production methods and Beam handling developments of a variety of new and complementary techniques which will be all essential for EURISOL ● Different capabilities in providing RIBs, with limited duty cycle Complementarity in satisfyng the future beam time requests (Importance of an european coord.)

SPES project UNI_PVUNI_PDUNI_TN DIMDSCDEI DESIGNMATERIALS DIM DSC CERN- ISOLDE GANIL-SPIRAL 2 ORSAY-ALTO TRIUMF- ISACORNL- HRIBF HANDLING CONTROLS The SPES collaborations network KEK- TRIAC Active Collaborations Future Collaborations INFN- Pavia INFN- Milano INFN- LNS INFN- Bologna INFN- Padova UNI_VI DMT SAFETY UNI_PA DIN INFN- LNL ENSAR SPIRAL2pp Important role of SPES for the International Community

SPES and the Italian Nuclear Physics Community In tha last decade the italian nuclear physics community has been deeply involved in activities related to RIB’s: (Besides work directly devoted to SPES) ● Light RIB production EXCYT, FRIBS (LNS), EXOTIC (LNL) ● Experiments with RIB’S National Laboratories, GSI, SPIRAL, ISOLDE ● Instrumentation Available (LNL, LNS) and development of new generation detectors, to be used with RIB’s 150 italian researchers (110 FTE) involved SPES will be the landingplace of these activities

EVALUATIONS ● SPES is well integrated in the european context and plays an important role for the international and the italian nuclear physics community. ● The italian nuclear physics community has been and is very active in the field of RIBs, either on the physics, or on the instrumentation. This can consitute a solid preparatory phase for SPES. ● There are the conditions for the project to be completed within

PERSPECTIVES Progetto Premiale PRIN