P.O. Box 18 Cambridge Bay, Nunavut X0B 0C0 Telephone: 1 867 983 2458 Fax: 1 867 983 2701 Kitikmeot Inuit Association Summary of Technical Issues.

Slides:



Advertisements
Similar presentations
Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Advertisements

The role of information in water-related decision making.
Carolyn Dunn Environmental Assessment Division Healthy Environments Consumer Safety Branch Health Canada High Lake Mine Pre-Hearing Conference December.
1 Results Based Regulation Implications for Municipal Solid Waste Management Presented By: Blake E. Nesbitt Saskatchewan Ministry of Environment SUMA Convention.
Britannia Mine: Environmental Impact Study of Treated Effluent Discharge Lee Nikl.
Environment Environnement Canada Environment Canada’s Intervention Presentation Cumberland Resources Ltd.’s Meadowbank Gold Mine Final Public Hearing March.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
Kiggavik Uranium Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Baker Lake, NU March 2-14,
Hydrogeology, High Lake Rob Dickin Hydrogeologist, GLL.
L-THIA Long-Term Hydrologic Impact Assessment Model ….provides relative estimates of change of runoff and non point source pollutants caused due to land.
St. Johns River Water Supply Impact Study by Getachew Belaineh Ph. D., P.H. 1 Brian McGurk P.G. 1 Louis Motz Ph. D., P.E 2 Follow up Review meeting March,
Vulnerability and Adaptation Assessments Hands-On Training Workshop
Bob Evans, Director Lexington Field Office Office of Surface Mining Reclamation & Enforcement.
Evaluation of Florida C&D Debris Groundwater Monitoring Data Presentation discusses: Results of analysis of groundwater monitoring data Results of groundwater.
MSFD - POMS Consultation Descriptor 1 – Biodiversity Descriptor 4 – Food Webs Descriptor 6 – Sea-floor integrity Simon Greenstreet, Marine Scotland Science.
Kiggavik Project Final Hearing Presentation
Freshwater Aquatic Organisms and Habitat ( ) Rick Palmer Senior Fisheries Biologist Sharleen Hamm Aquatic Ecologist.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
Inuit Qaujimajatuqangit. Traditional knowledge –Selection based on: same as archaeology boundary Kugluktuk traditional area travel routes Nunavut - NWT.
1 NRCan’s Final Hearing Presentation: Kiggavik Uranium Mine Project : Prepared for the Nunavut Impact Review Board Presented by: John Clarke Director,
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Water Management Planning An essential component of the MMP
Jericho Aquatic Discharge Assessment Presented by: Bruce Ott, Senior Environmental Scientist, AMEC Earth & Environmental.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Fisheries and Oceans Canada Fish Habitat Management Program Intervention to the Nunavut Water Board on the Doris North Gold Project Cambridge Bay August.
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
Meadowbank Gold Project: Indian and Northern Affairs Canada’s Final Hearing Presentation to the Nunavut Impact Review Board March 27 – 31, 2006.
Environment Canada’s Intervention on the Mary River Project Water Licence Application Nunavut Water Board Final Hearing Pond Inlet, NU Mark Dahl / Anne.
Main elements of an Integrated Monitoring and Assessment Programme:Coast and Hydrography Integrated Correspondence Group on Monitoring 30 March-1 April.
- Aquatics - Presented by: Rick Pattenden Mainstream Aquatics Ltd.
Potential Impacts of a Seawater Intake Structure and a Brine Disposal System for the Proposed Desalination Plant at Mile 6, Swakopmund Marine Ecological.
Mineral Development Advisory Group. To represent the interests of Kitikmeot Inuit by protecting and promoting our social, cultural, political, environmental.
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
High Level Scoping for Upcoming Monitoring Dave Dilks, Joyce Dunkin SRRTTF Technical Track Work Group June 3,
MEADOWBANK WATER LICENSE RENEWAL NWB 2AM MEA0815 January 14-15, 2015, Community of Baker Lake, NU Hutchinson Environmental Sciences Ltd.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Issue: Effects of Mine Reflooding
Doris North Gold Mine Project Presentation to the Nunavut Water Board Technical Meeting Cambridge Bay, NU January 28-29,
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
Review of Meadowbank Water License Application: Public Hearing
Kitikmeot Inuit Association
Environment and Climate Change Canada’s Presentation to the Nunavut Impact Review Board Respecting the Phase 2 Hope Bay Belt Project Draft Environmental.
Baker Lake, Nunavut Anne Wilson, Environment Canada January 14, 2015
Environment and Climate Change Presentation to the Nunavut Water Board Regarding Doris North Project Type A Water Licence Amendment Application Nunavut.
Presentation to Roanoke River Basin Bi-State Commission March 31, 2010
Kitikmeot Inuit Association
Phase 2 Hope Bay Belt Project
Module 17: MIXING ZONES A limited area or volume of water where initial dilution of a discharge takes place and where numeric water quality criteria.
Kitikmeot Inuit Association
Cara Cowan Watts Graduate Student Biosystems Engineering
Kitikmeot Inuit Association
MADRID – BOSTON PROPOSAL PHASE 2 OF THE HOPE BAY PROJECT
Kitikmeot Inuit Association
Kitikmeot Inuit Association
Kitikmeot Inuit Association
Phase 2 Hope Bay Belt Project
Meadowbank Water License Renewal
Great Salt Lake Water Quality Strategy Update
Directive 2006/118/EC Short overview
Purpose Independent piece of legislation, closely integrated in a larger regulatory framework (complement to WFD): prevent deterioration protect, enhance.
Taking forward the common understanding of Art. 8, 9 and 10 MSFD
Directive 2006/118/EC Short overview
Mary River Project Phase 2 Proposal Cumulative Effects
Mary River Project Phase 2 Proposal Atmospheric Environment
Mary River Project Phase 2 Proposal Freshwater Environment
WHALE TAIL PIT Expansion Project
WHALE TAIL PIT Expansion Project
Agnico Eagle Mines Ltd.’s Whale Tail Pit Expansion Project
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

P.O. Box 18 Cambridge Bay, Nunavut X0B 0C0 Telephone: Fax: Kitikmeot Inuit Association Summary of Technical Issues

kitia.ca Technical Overview This presentation provides an overview of concerns & recommendations made by the KIA during the review, with regard to:  Water Quality & Load Balance  Wildlife  Fisheries  Hydrogeology 2

kitia.ca Water Quality (KIA-1,9) A. Concern:  Will the TIA have sufficient capacity for Madrid/Boston projects?  How will future projects affect water quality in Robert’s Bay? B. Recommendation: TMAC should provide an assessment re: capacity of TIA for future projects & should include these project in the CEA. TMAC should provide a discussion on how CCME water quality criteria in Robert’s Bay will be met after Phase 2 starts. C. TMAC Response: Additional studies for TIA & Robert’s Bay will be addressed in the Phase 2 DEIS. 3

kitia.ca Wildlife (KIA-2,3) A. Concern: Attraction to & consumption of tails or vegetation impacted by tailing leachates by wildlife. B. Recommendation: An adaptive management program several details including details on frequency, thresholds & methods. C. TMAC Response: TMAC has agreed to develop a monitoring plan to detect wildlife attraction & feeding in/near TIA, in combination with other monitoring. Based on results, will conduct a risk assessment & implement wildlife deterrents as necessary. 4

kitia.ca Water Quality (KIA-4,11B) A. Concern: Water & load balance model uses median values to predict water quality & loadings which may underestimate potential effects to surface water. B. Recommendation: Use 75th percentile concentrations as input values into model to consider “enriched” conditions. C. TMAC Response: TMAC agreed to run a sensitivity analysis of the water & load balance using the 75th percentile for background concentrations & other input source terms. 5

kitia.ca Water Quality (KIA-5) A. Concern: The proposed 0.3 m depth of quarry rock cap for the tailings beach upon closure is not sufficient. B. Recommendation: Use 75 th percentile leach as input values into model when predicting containment release from the TIA. C. TMAC Response: TMAC has agreed to recalculate the tailings beach source terms using the 75th percentile leach rates from the humidity cell tests. Results of new model will be used to justify cover thickness. 6

kitia.ca Water Quality (KIA-5) A. Concern: The proposed 0.3 m depth of quarry rock cap for the tailings beach upon closure is not sufficient. B. Recommendation: Use 75 th percentile leach as input values into model when predicting containment release from the TIA. C. TMAC Response: TMAC has agreed to recalculate the tailings beach source terms using the 75th percentile leach rates from the humidity cell tests. Results of new model will be used to justify cover thickness. 7

kitia.ca Wildlife (KIA-6) A. Concern: Roberts Bay hosts 9 waterfowl & at least 2 mammal spp. That feed on benthic food items like bivalves. Update AEMP in Roberts Bay to protect wildlife. B. Recommendation: AEMP changes should include increased sampling locations and frequency for diffuser outfall. C. TMAC Response: TMAC is open to considering additional sampling as part of the working group discussions proposed for March,

kitia.ca Water Quality (KIA-7) A. Concern: Saline groundwater & water from TIA have the potential to interact with marine environment. Concern re: the variability of TIA discharge, salinity levels, & chemical differences between saline groundwater & seawater. B. Recommendation: Variance in water discharge, chemical differences & the potential impact on seawater should be addressed in further detail. C. TMAC Response: TMAC provided information on groundwater quality; however we need further information to clarify their response. 9

kitia.ca Water Quality (KIA-8) A. Concern: The methods used to predict water quality in Roberts Bay does not determine the size & properties of the mixing zone where water quality will be above the CCME guidelines. B. Recommendations: The size & shape of the mixing zone, where water quality will be above CCME guidelines should be modeled & presented, using 75th percentile concentrations. C. TMAC Response: TMAC will use three-dimensional hydrodynamic modelling to simulate mixing zones, plume movement, & predict water quality concentrations (CCME) using 75th percentile concentrations. 10

kitia.ca Hydrogeology (KIA-10) A. Concern: There was little discussion on how groundwater inflow 3,000m 3 /d) will be handled, including post closure. B. Recommendation: Provide additional details regarding:  the variance in the volume & quality of groundwater to be managed; &  management of ground water inflows during mining operations to provide assurance that dewatering rates would effectively handle groundwater inflows C. TMAC Response: TMAC provided the requested information to our satisfaction. 11

kitia.ca Water Quality (KIA-11A) A. Concern: The water quality modeling does not consider the effects of climate change & varying hydrological conditions. B. Recommendation: Update site water quality model to include climate change as per the latest IPPCC. Define hydrological conditions modeled & how that will affect the water load balance C. TMAC Response: TMAC has run variable hydrology models based on 1953 to 2014 data. Water quality results of this sensitivity analysis will be presented at these technical meetings. 12

kitia.ca Water Quality (KIA-11C) A. Concern: The model did not predict cyanide, mercury & selenium in TIA, & mercury in the effluent discharging to Roberts Bay from the Marine Outfall Box due to high detection limits or lack of data. B. Recommendation: Complete additional analysis for mercury & selenium using low- level detection limits. Obtain additional information to predict cyanide concentrations in the source terms. C. TMAC Response: TMAC has updated the modelling to include cyanide, selenium, & mercury in the TIA & point of discharge to Robert’s Bay. Results of analysis will be presented at these technical meetings. 13

kitia.ca Water Quality (KIA-12) A. Concern: A water quality model is needed to determine the concentrations of nitrate in the mixing zone & between deep & surface layers. Enriched nitrate in the surface layer may cause excessive algal growth. B. Recommendation: Update site water quality model to include: Mixing zone modeling in Robert’s bay that predicts the concentrations of nitrate & other parameters in the mixing zone, deep layer & surface layers C. TMAC Response: TMAC has provided additional information on plume size, shape, & concentration in Roberts Bay & Melville Sound. This will be evaluated with the additional hydrodynamic modeling being conducted. 14

kitia.ca Fisheries (KIA-13) A. Concern: Groundwater inflow will affect Doris Lake water levels. Potential effects on fisheries, in particular spawning habitat & egg incubation, are currently unknown (KIA-13). B. Recommendation: Additional work was completed in 2015 to characterise the fish habitat around Doris Lake. It is recommend that this baseline information be presented, & used to update the effects assessment & guide mitigation & monitoring plans, as needed. C. TMAC Response: TMAC has completed additional data collection to quantify effects to fish & fish habitat in Doris Lake. This information will be reviewed & assessed. 15

kitia.ca Wildlife (KIA-14) A. Concern: The WMMP design is currently unable to determine whether wildlife avoid or are attracted to the mine (KIA-14). B. Recommendation: We have recommended improvements to the WMMP camera monitoring program. A statistician, the KIA, TMAC, & ERM will be meeting to improve the design such that it can achieve its original objective. C. TMAC Response: TMAC has agreed to meet with the KIA & work collaboratively to improve the camera modelling program. TMAC acknowledges a need for improved power. We disagree, however, that the program effectively manages detection probability. 16

Thank You Questions? 17