325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline. 2009.09.11. Power Coupler design for Superconducting Spoke cavities. Originally.

Slides:



Advertisements
Similar presentations
16-17 March 2010 CERN Introduction by W. Weingarten Review of SPL RF power couplers 16/17 March 2010 Review of SPL RF power couplers 1.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
30 th September 2004 High Power RF Couplers James Rogers High Power RF Couplers ELSRF Daresbury Laboratory.
 Outline: ◦ 325 MHz Superconducting Spoke Resonators in the Project X Linac (HINS front end). ◦ SSR1 Single Spoke Resonator with β g =.21: Fabrication.
Progress and Plan for Superconducting RF Cavity RF Group.
CC2 Input Coupler Introduction, Installation, & Processing Tim Koeth November 16 th, 2005.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
3.9GHz Coupler Cold End Robustness Study Will Couplers survive on-site and overseas shipping? D. Olis, G. Galasso, M. McGee.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
Coupler without copper coating S. Kazakov 11/13/2013.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
IHEP High Power Input Coupler Activity Report First Mini-workshop on IHEP 1.3 GHz Superconducting RF project June 10th, 2009, Beijing IHEP High Power Input.
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Coupler Multipactor Studies F. Wang, B. Rusnak, C. Adolphsen, C. Nantista, G. Bowden, Lixin Ge.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Cavity Measurements By Aaron Cheng 4 May Overview RF measurements Waveguide-coax transition.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
LCLS-II Couplers and Related R&D Chris Adolphsen WWFPC, CERN June 23, 2015.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Multipacting Simulation for the PITZ RF Photo Gun Igor Isaev Unwanted Beam Workshop 2012 Humboldt-University Berlin, The PITZ RF Photo Gun.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
TTF-III Coupler Parts Processing and Multipacting Simulation using Magic Faya Wang Dec Wake Fest 07 – ILC wakefield workshop at SLAC.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
Power Couplers, HOM Couplers and Tuners for the XFEL
Power coupler at DESY & for XFEL
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Test plan of ESS HB elliptical cavity
12 GHz High Power RF components requirements for CEA activities
R&D Activity for Field Emission and Vertical EP
World Wide Fundamental Power Coupler meeting #3
SNS Fundamental Power Coupler History
Wolfgang Anders, BESSY, Berlin
Modified TTF3 Coupler Design and Related R&D for LCLS-II
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
CW accelerating module test progress at DESY
Test plan of ESS HB elliptical cavity
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Cryomodules Challenges for PERLE
V. Veshcherevich Cornell University
Cryomodule Design for CW Operation 3.9 GHz considerations
SNS Coupler Shipping Plans
Presentation transcript:

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally 26 mA, 1 msec beam, 1.5 msec RF pulse, 10Hz operation Magnetic fields in 1/8 of the Single Spoke Cavity.  =0.22 with 79mm port.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Triple Spoke Cavity.  = /8 of the Triple Spoke Cavity.  =0.62 with 79mm port. 9.3 MeV per cavity. Maximum pulsed power is 240 kW, average power is 3.6 kW.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Mechanical design of the Power Coupler. Tom Nicol’s design of the Coupler, FNAL AMAC design based on FNAL design Two planar ceramic windows, L/4 apart. Standard connectors

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Summary of results. T. Nicol Case T at tip (K) Q at 4 K (W)* Q at 80 K (W)* Q at 300 K (W)* (outer) Q at 300 K (W)* (inner) RF power (W) Solid copper center conductor from 300 K to 80 K. 2Solid stainless steel center conductor from 300 K to 80 K. 3Hollow stainless steel center conductor from 300 K to 80 K. 4Same as 4, with RF power set to 0. 5Same as 3, with 80 K intercept moved to ceramic window flange. 6Same as 5, with stn stl tube sections increased to 1 mm (from 0.5 mm). *: Static heat loads are due to conduction only.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Typical resulting temperature plot (case 6). T. Nicol. (300 K) (80 K) (4.5 K)

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Coaxial 325 MHz Power Coupler Test Station. Power loss in vacuum chamber walls 1 W for 2 kW transmitted power. In central conductors of the couplers each 0.8 W.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Test station. Vacuum chamber and pumping station.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Assembling of the Coupler Power Processing Station in IB3. Done. - Low power measurements of the 2 couplers assembled to chamber in the test station. IB3. Done. - Vacuum check in IB3. Done. - High power processing chamber cleaning in MP9 (and baking IB4). Assembling work done in A0. 1 st pair of coupler are not baked. 2 nd pair is baked 150C, 48h in A0. - Cleaning of the all parts of the pair of couplers. MP9. Cleaning and other preparation work done in A0. - Assembling of the cold parts to vacuum chamber in the class 10 clean room. MP9. Done in A0. - Assembling of the warm parts in test station in the class 3000 clean area. Low power RF measurements. MP9 or IB4. Done in MP9. Preparation steps.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Connecting to high power lines. Connecting diagnostics. MDB: 2 temperature sensors per coupler 3 e-probes per coupler Forward and reflected power signals. Vacuum sensor. - High power processing range 5 – 500 kW in travelling wave regime: Start with Pulse length 20  sec and power 5 kW. Look on vacuum signals <5e6 Tor and e-probe signals <0.1 mA, reflected power limit (20% of forward power) and windows temperatures. After improving vacuum better than 5e-7 Tor increase power with steps 1-2 dB up to 500 kW. Repeat previous step with pulse length 50, 100, 200, 400, 800, 1500 and 3000  sec. - High power processing range 5 – 300 kW in standing wave regime: Start with Pulse length 20 msec and power 5 kW. Look on vacuum signals <5e6 Tor and e-probe signals <0.1 mA. After improving vacuum better than 5e-7 Tor increase power with steps 1-2 dB up to 200 kW. Repeat previous step with pulse length 50, 100, 200, 400, 800, 1500 and 3000 msec. - Disconnect from diagnostics and power lines. - Disconnect warm part in in the class 3000 clean area. MP9 or IB4. - Disconnect cold parts in and install caps in class 10 area. Put to storage. MP9. Power processing steps.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Adjusting gap between coupler tips.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline  sec pulse 1Hz Power processing finished in 9 hours.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline  sec pulse 1Hz Power processing finished in 2 hours. Processing speed limited by vacuum 3e-6 due to multipactoring.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline  sec pulse 1Hz Power processing finished in 1.5 hours.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline  sec pulse 1Hz Power processing finished in 1.5 hours. Processing speed limited by vacuum 3e-6 due to multipactoring. Multipactoring disappear above 120 kW.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline  sec pulse 1Hz Power processing finished in 3 hours.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline  sec pulse 1Hz Power processing finished in 3 hours. Multipactoring disappear above 110 kW.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline  sec pulse 1Hz Power processing finished in 1.5 hours.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline  sec pulse 1Hz Power processing finished in 1.5 hours. Multipactoring disappear above 80 kW.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Summary of power processing of the 1 st pair of the couplers. Multipactor is limiting factor.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline  sec pulse 1Hz. Temperature in the windows of 1 st coupler increased by 3F.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline ms pulse 2Hz 550 kW power, average power 3.3 kW.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Temperature raised by 38F on Warm1 window flange in 2h10min. Gradient at the beginning was 0.6F/min and at the end 0.2F/min. Total dT~57F~36C maximum heating can be expected.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Map of the temperature measurement points. 3- cold window sensor, 6 - warm window sensor location.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline

Total 37 kg 15.2 kg 6.4 kg #9

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline SSR power coupler test and conditioning results: Two coupler setup were conditioned in 25 hours. Maximum peak power reached 1 MW in travelling wave regime, 2 Hz, 3 ms. Only several spars observed. Can be tested at higher power level. Maximum average power 4.2 kW (2Hz, 3 ms, 700kW) during 2 hours. 3 hours additional test at 3.3 kW average power (2 Hz, 3 ms, 550 kW). Worth multipactoring in power range kW. But can be conditioned to vacuum 1e-7 Torr in 10 hours. More than expected heating of the warm windows area. Probably bad RF connection there. Two coupler conditioned and one of them can be installed to cavity SSR1-01 for a cold test. Next set of two coupler assembled, baked 150C 48h and power conditioning started. One of these couplers manufactured by AMAC under SBIR project.

325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline mA CW operation with current acceleration pattern: 1.SSR1 cavity. Forward power P=1.2 kW is OK with existing Power Coupler design. 2.SSR2 cavity. Forward power P=3.6 kW is probably OK with existing design. 3.TSR cavity. Forward power P=9.3 kW is too much for existing design. Possible improvements of the existing design allows to reach kW average power: -Copper plating of the outer conductor -Thermal intercept in the middle of the bellow to 4.5K -Cooling of the central conductor with cold gas (Nitrogen).