Status of the sub-harmonic bunching system for the CLIC DB injector front end Hamed Shaker School of Particles and Accelerators, Institute for Research.

Slides:



Advertisements
Similar presentations
CLIC drive beam accelerating (DBA) structure Rolf Wegner.
Advertisements

Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
Compact Linear Collider. Overview The aim of the CLIC study is to investigate the feasibility of a high luminosity linear e-/e+ collider with a centre.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
July Alexej Grudiev, Improvement of CLIC structure. Possible improvement of the CLIC accelerating structure. From CLIC_G to CLIC_K Alexej.
Wakefield suppression in the CLIC main accelerating structures Vasim Khan & Roger Jones.
Design of Standing-Wave Accelerator Structure
CLIC Drive Beam Injector Design Update Shahin Sanaye Hajari 1.Institute For Research in Fundamental Sciences (IPM), Tehran, Iran 2.CERN, Geneva, Switzerland.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Low Energy and Low Current S-Band Traveling Wave Electron Linear Accelerator structure design Hamed Shaker School of Particles and Accelerators Institute.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Sub-Harmonic Buncher design for CLIC Drive Beam Injector Hamed Shaker School of Particles and Accelerators Institute for Research in Fundamental Sciences,
Compensation of Transient Beam-Loading in CLIC Main Linac
Thales Components & Subsystems
Proposals for conceptual design of the CLIC DR RF system at 2 GHz 20/10/2010 A.Grudiev.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Course B: rf technology Normal conducting rf Part 5: Higher-order-mode damping Walter Wuensch, CERN Sixth International Accelerator School for Linear Colliders.
RF structure design KT high-gradient medical project kick-off Alberto Degiovanni TERA Foundation - EPFL.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
1.Institute For Research in Fundamental Science (IPM), Tehran, Iran 2.CERN, Geneva, Switzerland Mohsen Dayyani Kelisani Thermionic & RF Gun Simulations.
Higher-Order Modes and Beam-Loading Compensation in CLIC Main Linac Oleksiy Kononenko BE/RF, CERN CLIC RF Structure Development Meeting, March 14, 2012.
LLRF Preliminary Design Review Vojtech Pacak/Ron Akre1 BEAM PHASE DETECTOR – PILLBOX CAVITY Basic Requirements and Parameters – Operating frequency:
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
RF DEFLECTORS AT CTF3 BNL/US-LARP/CARE-HHH MINI-WORKSHOP ON CRAB CAVITIES FOR THE LHC Brookhaven National Laboratory, Upton NY Feb 25-26, 2008 Fabio Marcellini.
Beam breakup and emittance growth in CLIC drive beam TW buncher Hamed Shaker School of Particles and Accelerators, IPM.
CLIC Drive Beam Injector Bunching System Sh. Sanaye H. 1,2, S. Doebert 2, S. H. Shaker 1,2 1.Institute For Research in Fundamental Science (IPM), Tehran,
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
Optimization of CLIC-G structure & Design of CLIC open structure Hao Zha, Alexej Grudiev (CERN) Valery Dolgashev (SLAC) 27/01/2015.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Oleksiy Kononenko CERN and JINR
1 Design and objectives of test accelerating structures Riccardo Zennaro.
Accelerating structure prototypes for 2011 (proposal) A.Grudiev 6/07/11.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
ALBA RF Systems Francis Perez.
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Status and plans of drive beam components and tests Status and plans of drive beam components and tests CLIC review, March 1 st, 2016Steffen Döbert, BE-RF.
Progress Report on the Ultra-fast Harmonic Kicker Cavity Design and Beam Dynamic Simulation Yulu Huang 1,2 H. Wang 1, R. A. Rimmer 1, S. Wang 1 1.Thomas.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Multi-stage pulse compressor
How does a klystron work? TE-MPE Section Meeting Karolina Kulesz
S.M. Polozov & Ko., NRNU MEPhI
Raja Ramanna Centre for Advanced Technology
New test structures for CLIC (RF design)
CLIC DB injector front end update on the work package
Abstract EuSPARC and EuPRAXIA projects
Development of X-band 50MW klystron in BVERI
News from TBTS International Workshop on Future Linear Colliders,
Status of the CLIC main beam injectors
My Works Review Hamed Shaker.
Preliminary injector linac design
Physics design on Injector-1 RFQ
Brief Review of Microwave Dielectric Accelerators
Developments on Proposed
Summary of the test structure design
CEPC injector high field S-band accelerating structure design and R&D
High Efficiency X-band Klystron Design Study
Update of CLIC accelerating structure design
Bunch Separation with RF Deflectors
Few Slides from RF Deflector Developments and Applications at SLAC
Electric Field Amplitude (MV/m)
SuperB project. Injection scheme design status
Status of the CLIC Injector studies
Explanation of the Basic Principles and Goals
Physics Design on Injector I
Presentation transcript:

Status of the sub-harmonic bunching system for the CLIC DB injector front end Hamed Shaker School of Particles and Accelerators, Institute for Research in Fundamental Sciences, Iran ; CERN, Switzerland

Sub Harmonic Bunchers (SHBs) CLIC Collaboration Working meeting Hamed Shaker Phase coding 180  phase switch Acceleration 0 Deflection 0 / 2 Sub-harmonic bunching 0 / 2 odd buckets even buckets RF deflector 0 / 2 Gap creation and combination Main challenge of SHBs: Fast 180° phase flipping capability As talked with Thales for IOTs, 80 KW peak power and about 20 MHZ bandwidth (about 30 ns phase flipping) is achievable.

Phase flipping- how much fast? CLIC Collaboration Working meeting Borrowed from Oleksiy Kononenko In the normal case the time interval between phase switching is constant (243.7 ns). In the Oleksiy model these intervals are not constant to have better energy dispersion at the end of main beam linac. It also give us an idea that how much the minimum phase flipping should be. The result shows us it should be less than 18ns. In my design I use 10ns similar to CTF3 SHBs. 3Hamed Shaker

Parameter for optimization Travelling Wave Structure For the known gap voltage and filling time our goal is to increase R/Q to reduce the input power. τ=10ns V=36.5 KV P d : Power disappears on surface. β : Coupling coefficient Q e = ωτ : External quality factor τ : Filling time R : Effective shunt impedance R’: Effective shunt impedance per length Q : Unloaded quality factor P: Source power V : Gap voltage W’ : Stored energy per length L: Structure length v g : Group velocity n : Cell numbers CLIC Collaboration Working meeting Hamed Shaker

Drive Beam Injector design in CDR Hamed ShakerCLIC Collaboration Working meeting The values was found by S. Bettoni et al. during CLIC DB Injector design and optimization. Initial design of RF structures was started with these numbers. But these values should be corrected afterward depend on the structure and the power source restrictions. CLIC DB Injector (CDR) Field (MV/m) Length (cm) Voltage (KV) Input Power (CTF3 scaling) Gun140 (β=0.62) SHB - I MW SHB - II MW SHB - III MW To scale, using this fact that The CTF SHBs have the same length and their voltages are 20 KV with 40KW input power. The optimization process to find minimum power needed for an electrical coupling structure doesn’t shows a better result. Then we should looking for another structure.

Magnetic coupling TW structure l g rbrb rnrn θ1θ1 r1r1 t/2 rcrc lclc θcθc g40 mm rbrb 45 mm rnrn 4 mm θ1θ1 25° t (disk thickness)15 mm Frequency MHz l (for 108° phase advance per cell) ≈ mm r1r mm rcrc 142 mm lclc 54 mm θcθc 86° Phase velocity0.64c CLIC Collaboration Working meeting Hamed Shaker

Four cells structure with waveguide couplers CLIC Collaboration Working meeting Hamed Shaker In this design for the first SHB about 73 MW peak power is needed for 10ns filling time and 36.5 KV gap voltage.

Phase flipping simulation – 10 ns CLIC Collaboration Working meeting Hamed Shaker Excitation signal – port 1 Output signal – port 2 Output signal – port 1 ≈ 14 ns ≈ 34 ns

Phase flipping simulation – 26 ns CLIC Collaboration Working meeting Hamed Shaker Excitation signal – port 1 Output signal – port 2 Output signal – port 1 ≈ 20 ns ≈ 40 ns

Phase flipping simulation with beam – 10 ns Hamed ShakerCLIC Collaboration Working meeting port 1port 2 Beam Entrance Continues beam with 6A current Excitation signal from port 1 with 80 KW peak power.

Phase flipping simulation with beam – 10 ns Hamed ShakerCLIC Collaboration Working meeting Excitation signal – port 1 Output signal – port 2 Output signal – port 1 ≈ 12 ns ≈ 44 ns

Phase flipping simulation with beam – 10 ns Hamed ShakerCLIC Collaboration Working meeting About 5 bunches will be missed in comparison with about 120 bunches in each sub-pulse.

Conclusion One SHB design is ready for mechanical design. Looking for any RF power source (80 KW peak power, about 60 MHZ band width). Beam dynamic simulation of DB Injector should be start with new parameters. Another SHBs will be designed depend on the beam dynamic simulation result. Hamed ShakerCLIC Collaboration Working meeting

Acknowledgment Thanks Steffen Doebert, Roberto Corsini, Walter Wuencs, Alexej Grudiev, Jiaru Shi, Lars Thorndahl, Daniel Schulte and Oleksiy Kononenko for their helps. Hamed ShakerCLIC Collaboration Working meeting