C. Biscari, D. Alesini, A. Ghigo, F. Marcellini, LNF-INFN, Frascati, Italy B. Jeanneret, CERN, Geneva, Switzerland CLIC DRIVE BEAM FREQUENCY MULTIPLICATION.

Slides:



Advertisements
Similar presentations
Bunch compressors ILC Accelerator School May Eun-San Kim Kyungpook National University.
Advertisements

1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Linear Collider Bunch Compressors Andy Wolski Lawrence Berkeley National Laboratory USPAS Santa Barbara, June 2003.
Dr. Zafer Nergiz Nigde University THE STATUS OF TURKISH LIGHT SOURCE.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
Super B-Factory Workshop, Hawaii, April 20-22, 2005 Lattice studies for low momentum compaction in LER M.E. Biagini LNF-INFN, Frascati.
Space Charge meeting – CERN – 09/10/2014
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
LHeC Test Facility Meeting
FCC-ee - Lepton Collider For the TLEP Lattice and Optics Design Team: B. Haerer, R. Martin, H. Garcia, R. Tomas, Y. Cai and many colleagues Optics Challenges.
March A. Chancé, J. Payet DAPNIA/SACM / Beta-beam ECFA/BENE Workshop The Decay Ring -First Design- A. Chancé, J.Payet CEA/DSM/DAPNIA/SACM.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Drive Beam Linac Stability Issues Avni AKSOY Ankara University.
Transfer Line -2 Optics Design For CTF3 Amalendu Sharma, Abdurrahim, A.D.Ghodke, Gurnam Singh and V.C. Sahni Raja Ramanna Centre for Advanced Technology.
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Beam Loss Simulation in the Main Injector at Slip-Stacking Injection A.I. Drozhdin, B.C. Brown, D.E. Johnson, I. Kourbanis, K. Seiya June 30, 2006 A.Drozhdin.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
1 NICA Collider: status and further steps O.S. Kozlov LHEP, JINR, Dubna for the NICA team Machine Advisory Committee, JINR, Dubna, October 19-20, 2015.
ILC Damping Ring Alternative Lattice Design ( Modified FODO ) ** Yi-Peng Sun *,1,2, Jie Gao 1, Zhi-Yu Guo 2 Wei-Shi Wan 3 1 Institute of High Energy Physics,
E Levichev -- Dynamic Aperture of the SRFF Storage Ring Frontiers of Short Bunches in Storage Rings INFN-LNF, Frascati, 7-8 Nov 2005 DYNAMIC APERTURE OF.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
PEP-X Ultra Low Emittance Storage Ring Design at SLAC Lattice Design and Optimization Min-Huey Wang SLAC National Accelerator Laboratory With contributions.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz,
CLIC Frequency Multiplication System aka Combiner Rings Piotr Skowronski Caterina Biscari Javier Barranco 21 Oct IWLC 2010.
CLIC 09 Workshop - C. Biscari C. Biscari, D. Alesini, A. Ghigo, F. Marcellini, LNF-INFN, Frascati, Italy B. Jeanneret, F. Stulle, CERN, Geneva, Switzerland.
A. Aksoy Beam Dynamics Studies for the CLIC Drive Beam Accelerator A. AKSOY CONTENS ● Basic Lattice Sketches ● Accelerating structure ● Short and long.
Off-axis injection lattice design studies of HEPS storage ring
MDI and head-on collision option for electron-positron Higgs factories
FCC-ee - Lepton Collider
Beam-beam effects in eRHIC and MeRHIC
TESLA Damping Ring: Injection/Extraction Schemes with RF Deflectors
CLIC Damping ring beam transfer systems
Large Booster and Collider Ring
First Look at Nonlinear Dynamics in the Electron Collider Ring
Measurements, ideas, curiosities
Multiturn extraction for PS2
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
The new 7BA design of BAPS
DA Study for the CEPC Partial Double Ring Scheme
Progress of SPPC lattice design
SuperB ARC Lattice Studies
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
CEPC main ring magnets’ error effect on DA and MDI issues
LHC (SSC) Byung Yunn CASA.
ILC 3.2 km DR design based on FODO lattice (DMC3)
ILC 3.2 km DR design based on FODO lattice (DMC3)
Electron Rings Eduard Pozdeyev.
Negative Momentum Compaction lattice options for PS2
Comparison of NMC rings for PS2
PEPX-type BAPS Lattice Design and Beam Dynamics Optimization
CEPC optics and booster optics
Update of lattice design for CEPC main ring
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Negative Momentum Compaction lattice options for PS2
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Evaluation of 1GHz vs 2GHz RF frequency in the damping rings
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
3.2 km FODO lattice for 10 Hz operation (DMC4)
Presentation transcript:

C. Biscari, D. Alesini, A. Ghigo, F. Marcellini, LNF-INFN, Frascati, Italy B. Jeanneret, CERN, Geneva, Switzerland CLIC DRIVE BEAM FREQUENCY MULTIPLICATION SYSTEM DESIGN 23 June 2009 – ILC-CLIC Beam Dynamics Workshop - Geneve

CLIC Layout 3 TeV (not to scale) Drive Beam Generation Complex Main Beam Generation Complex

Beam temporal structure along the frequency multiplication system 100 A 4A E=2.37 GeV, Emittance ~ 100  m rad Energy spread < 1%, Bunch length 2mm Bunch charge = 8.4 nC Final bunch separation = 2.5 cm

Delay Loop as in CTF3 May 09 FMS layout

Turn Around Loop June 09 FMS layout

Main parameters of the rings ParameterDLTACR1CR2 Lm Combination factor 2234 RF deflector frequencyGHz N of dipoles  m BT N of quadrupoles / families 18 / 944/1748 / fodo quads l q * dB/dx maxT

DL against TA DELAY LOOP L = 73 m Total bending angle = 2  Low number of elements 1 rf deflector High element density Higher T566 (-55m, sext off) TURN AROUND L = 73 * m Total bending angle > 10% High number of elements 2 rf deflectors Low element density Lower T566 (-35, sext off) Better tunability

Energy loss per turn (Incoherent Synchrotron Radiation) From 1 turn to 7.1 turns: energy loss from 0.42 to 3 MeV Spread between the minimum and maximum lost:  E/E ~ 0.1 % Number of

Delay loop – full of dipoles –  = 4.7 m Field index in dipoles

Isochronous INJECTION or EXTRACTION WIGGLER CLIC CR1 and TA– similar to CTF3 CR In TurnAround Loop dipoles bend 33° instead of 30°

Turn Around Loop – same isochronous arc of CR

QD 5 ° Septum QF Dipole RF deflector 5 mrad 2.5 mrad 7.5 mrad 14 mrad 101 mrad 5.2 cm SEPTUM position ADDING a Dquad between the rf deflector and the septum The odd and even bunches are separated and vertically focused on the septum position

1° combiner ring

2° combiner ring

Tracking 6d particle distribution along fms Optimisation of 2° order chromaticity terms – work in progress Beam energy spread is the parameter mostly influencing the three phase spaces. Correcting the 2° term isochronicity by sextupoles can be harmful for the transverse planes. Up to ± 1% of energy spread 3 emittances are easily preserved. Particles with higher energy deviations can be lost transversely when sextupoles are not carefully optimised TACR1CR2 T566 sext off T566 sext on T166 sext off T166 sext on Dp/p = 1% -> 3.5 mm

DL x 2 vertical chicane CR1 x 3 CR2 x 4 INPUT of Turn Around Loop (Dp/p)rms = ±0.6 % (Dp/p)max = ± 2 %

DL x 2 vertical chicane CR1 x 3 CR2 x 4 OUTPUT of Turn Around Loop (Dp/p)rms = ±0.6 % (Dp/p)max = ± 2 % (Dp/p)rms = ±0.3 % (Dp/p)max = ± 1 %

DL x 2 vertical chicane CR1 x 3 CR2 x 4 OUTPUT of CR1 After 3 turns (Dp/p)rms = ±0.6 % (Dp/p)max = ± 2 % (Dp/p)rms = ±0.3 % (Dp/p)max = ± 1 %

DL x 2 vertical chicane CR1 x 3 CR2 x 4 OUTPUT of CR2 – after 4 turrns (Dp/p)rms = ±0.6 % (Dp/p)max = ± 2 % (Dp/p)rms = ±0.3 % (Dp/p)max = ± 1 %

MAD X Correction for CR1 : one sextupole family T566 = 0 Q'x = -9.8 sext off, and -2.1 sext on Q'y = sext off, and sext on  /  < 0.22 for 2% of  p. Tracking particles of amplitudes A x,y = 1,2,3  x;y evenly spaced in phase and covering the momentum range ± 2% over three turns: no significative deformation of the vertical phase-space the horizontal phase-space is preserved up to  p = ±1.2 % Qualitatively and quantitatively same results of Madx, but with different sextupole strengths May 09

MadX – mad8 Different values for chromaticity evaluation 2° order longitudinal correction slightly different Use ctf3 combiner ring as benchmark: Apply sextupole corrections for bunch length and chromaticity optimisation Measurements of bunch length and of beam emittances in TL2

RF deflectors

Deflector Frequencies Delay Loop: f = f linac /2 (2n+1), n=0,1,2,… f = 0.5 GHz, 1.5 GHz, 2.5 GHz,… Combiner Ring 1: (recombination factor m = 3) f = nf bunch, n=1,2,4,5,… (but n≠m and its multiple integers) f = 1 GHz, 2 GHz, 4 GHz,… Same rule for CR2 (recombination factor m = 4): f = 3 GHz, 6 GHz,…

f [GHz]a (mm)L (m)N  f [ns] v g /c  [1/m] P av [kW]Z [V 2 /m 2 /W] e e e6 COMB RING 1

DEFLECTING FIELD EXCITED BY THE BEAM IN RF DEFLECTORS Unwanted deflecting field can be excited by the beam if the pass off- axis into the deflectors both in the horizontal than in the vertical plane. This is due to the fact that the deflecting field has longitudinal electric field off-axis. This happens, in the horizontal plane, even in the case of perfect injection and both in the DL than in the CR RF deflectors. In the vertical plane there is beam loading only in case of a non-perfect steering of the orbit inside the structure. DELAY LOOP COMBINER RING EXAMPLE: PILL BOX CTF3

TRACKING CODE Spectrum of a 200 bunches in the combiner ring in 4 turns (f REV  3.56 MHz) WAKEFIELD INDUCED BY THE VERTICAL MODES Vertical mode resonance RF deflectors M 12 A dedicated tracking code has been written to study the multi-bunch multi- turn effects. All the results in term of the oscillation amplitude are proportional to: -the beam off axis  y=2 mm orbit in the deflector has been considered. -the bunch charge  q=2.33 nC bunch charge has been considered

TRACKING CODE RESULTS  MHz -The tracking allows studying the distribution of the Courant-Snyder invariants (I out ) for all bunches and its dependence on the resonant mode properties and ring optical functions. Simulations done for CTF3 Lower energy (100MeV) lower current (15 A) CTF3

TRACKING CODE RESULTS: key parameters to reduce the instability Optical phase advance between deflectors (  12 ) and  y at the deflectors Res. frequency and vertical mode quality factor dependence They suggested to strongly shift the resonant frequencies of the vertical modes and to strongly reduce their quality factors. CTF3

Choice of ring tunes and phase advances Rf deflectors loading : Qx far from integer, Qy near half integer Misalignment errors and beam loading: Qx, Qy far from integer In progress simulations for CLIC fms (David will present them in CLIC workshop 09)

Conclusions FMS Layout and first order optics defined: two different possibilities for 1° ring 2° order chromaticity compensation in progress -> may require 1° order optics modifications, assured by system tunability Rf deflector main parameters defined Beam loading calculations in rf deflectors in progress-> may require rf deflectors parameters modifications 23 June 2009 – ILC-CLIC Beam Dynamics Workshop - Geneve