Lessons Learned from Everglades Restoration Julie A. Hill Everglades Policy Associate.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers Budgeting Process
Advertisements

Vision For the Future of Water in Kansas. 1.Technology and Crop Varieties 2.Water Management 3.Water Conservation 4.New Sources of Supply Breakout Topic.
Everglades Restoration A Program for Integrated Regional Management
The Power of Partnerships Jody Thomas The Nature Conservancy July 21, 2007.
F1B - 1 BU ILDING STRONG SM Flood Risk Management Module F1: Authorities and Policies.
FDR1 - 1 Flood Risk management History/Mission/Policies.
Flood the Sugar Cane Farms Now to Save the Estuaries: Is This Feasible ? Water Resources Advisory Commission January 5, 2006 Meeting.
The Central and Southern Florida Project Conceived by Florida Built by the Corps Integrates a Large Dynamic Economy and Multiple Valuable Ecosystems How.
In the early 1900’s man began to change this delicate system. It started with a series of canals and levees that were built to provide flood control and.
Preserving our open space heritage Protecting our economy Building our future Habitat Conservation Plans - Landscape Level Conservation in a Rapidly Developing.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
US Army Corps of Engineers BUILDING STRONG ® COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers United States Army.
Florida Water Forum Everglades Restoration June 3, 2011.
1 Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Update Bren Haase Louisiana Office of Coastal Protection and Restoration Presentation.
The South Florida Watershed
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
US Army Corps of Engineers BUILDING STRONG ® Coordinating U.S. Army Corps of Engineers Regulatory Permits with Species Conservation Plans November 16,
Flood Management Dealing with Floodplains in Missouri.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Module 24 STEPS 17, 18, & 19 Project Implementation Civil Works Orientation Course - FY 11.
1 CERP – PDT WORKSHOP COMPREHENSIVE EVERGLADES RESTORATION PLAN April 2002 Project Implementation Reports.
US Army Corps of Engineers BUILDING STRONG ® Rosewood Park Coastal Section 506 of WRDA 2000 Kirston Buczak, PMP USACE, Chicago District May 2012.
NGA CENTER FOR BEST PRACTICES Waves of Change: Examining the Roles of States in Emerging Ocean Policy.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
The Power of Water A Regional Perspective on Water Resource Challenges and Opportunities Lester S. Dixon Director of Programs, South Atlantic Division.
State Wildlife Action Plans
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Watershed Authorities, Policies and Procedures Michael Greer Regional Technical.
The South Florida Region and its Water Management System Linda Lindstrom, P.G. Director Environmental Resource Assessment Department South Florida Water.
U.S. Army Corps of Engineers In partnership with the South Florida Water Management District Water Management in South Florida.
“Getting the Funding Right” Kim Koleos Juris Doctor, University of Florida.
Everglades Land Acquisition Project Carol Ann Wehle SFWMD Executive Director.
World Association for Waterborne Transport Infrastructure (PIANC) and the International Environmental Commission Technical Seminar October 28, 2009 Westin.
Programmatic Regulations PDT Workshop COMPREHENSIVE EVERGLADES RESTORATION PLAN April 18, 2002.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
A Vision for the Future Presented to the North Bay Watershed Association by the Sonoma County Water Agency and Zone 7 Water Agency.
Everglades Land Acquisition Project Michael Sole - Carol Wehle - Dale Brill.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
1 Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Overview.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
REPI Overview 11 September What is the Readiness and Environmental Protection Initiative? REPI supports partnerships authorized by 10 U.S.C. §
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Revisions to the Long-Term Plan for Achieving Everglades Water Quality Goals November 18, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Catharine Cyr Ransom Principal The Accord Group. Stafford Act Structured approach to disasters Partnership between local, state, Federal governments Authority.
Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Everglades Restoration Everglades Restoration3 Data Management Rick Miessau South Florida Water Management District (561) Data.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Environmental Factors In this module, we will discuss: Environmental legislation Environmental hazards Due diligence Conducting an environmental.
BUILDING STRONG ® PLANNING SMART ® US Army Corps of Engineers BUILDING STRONG ® Partnering Opportunities for Water Supply and Distribution Planning Beverley.
The Central Everglades Planning Process DOI Team Briefing November 14, 2011 November 14, National Research Council CISRERP Update 5 th Biennial.
US Army Corps of Engineers BUILDING STRONG ® OVERVIEW OF THE CIVIL WORKS PROCESS Planning Principles & Procedures – FY 11.
RECOVER PDT Workshop COMPREHENSIVE EVERGLADES RESTORATION PLAN April 18, 2002.
RECOVER Role/Science Guidance during Design, Construction and Implementation Phases RECOVER Science Meeting March 1, 2016.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
Origin  On October 18, 1997 – 25 th Anniversary of Clean Water Act – Federal agencies were asked to rededicate their efforts to cleaning up the Nations.
BUILDING STRONG SM Revitalizing and Expanding Partnerships Charles E. Shadie, P.E. Senior Hydraulic Engineer Mississippi Valley Division U.S. Army Corps.
C ALOOSAHATCHEE & E VERGLADES R ESTORATION Jennifer Hecker, Director of Natural Resource Policy.
COMPREHENSIVE EVERGLADES RESTORATION PLAN …different cultures -- same Team.
Everglades Cooperative Invasive Species Management Area
Continuing Authorities Program
Regional Restoration Planning for the Delaware Estuary
Michigan Dept. of Environmental Quality Water Resources Division
Biodiversity, Conservation & Sustainability
Navigating MyFloridaMarketPlace (MFMP)
VALUE CARDS Freedom – Justice – Diversity - Self-reliance – Equality – Community – Cooperation – Stability – Security - Democracy.
USACE infrastructure team update
Climate Change Implications for Floodplain Restoration
Presentation transcript:

Lessons Learned from Everglades Restoration Julie A. Hill Everglades Policy Associate

Natural SystemManaged System

68 Threatened & Endangered Species

Yikes!

Comprehensive Everglades Restoration Plan (CERP) WRDA 2000 codified CERP CERP provided for 68 separate restoration components throughout the Everglades ecosystem 50/50 shared responsibility between the State of Florida (South Florida Water Management District) and federal partners (US Army Corps of Engineers)

Although CERP was passed 8 years ago, to date no construction projects have been completed

Federal funding has not met the levels of state funding State has contributed at a level of 2 to 1 compared with the federal partner The WRDA process for federal authorization is one cause of delays

New ideas Water Resources Restoration Act Authorize comprehensive ecosystem restoration projects separately from navigation and flood control projects Replicate the WRDA framework and build upon the environmental protection mission of the US Army Corps of Engineers

Lessons Learned 1.Most importantly, be FLEXIBLE, and look at substance over process 2.Prioritize projects by anticipated ecological benefits 3.Very important to show early up-front commitment from the local sponsor to entice federal commitment

Lessons Learned, Cont. 4.Agriculture is valuable and flood protection important BUT “savings clause” caused more problems than anticipated 5.Adaptive Management should be used to achieve benefits- don’t wait until planning efforts are perfect

Lessons Learned, Cont. 6.Work within existing procedural structures at the same time as proposing new and improved procedures 7.Focus on land acquisition at the outset 8.Develop partnerships to advance ecosystem restoration efforts nationwide

New Developments US Sugar Purchase 187,000 acres State will pay approximately $1.75 billion Funding will come primarily from certificates of participation Early benefits for water storage and water treatment

Natural SystemManaged System

Implications of US Sugar The State of Florida will no longer be able to take on the burden of funding the majority of projects Some projects need to be expedited in order to achieve the best possible benefits from the US Sugar purchase The purchase could change Everglades restoration plans dramatically, so reinforces the need to be flexible