A First Pass at Modeling Horn 3 L. Bartoszek Bartoszek Engineering 12/10/04.

Slides:



Advertisements
Similar presentations
Final(?) Design of G0 Upstream Shielding Larry Bartoszek BARTOSZEK ENGINEERING 10/22/05.
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
A New Stripline Connection to JPARC Horn 1 Larry Bartoszek BARTOSZEK ENGINEERING 9/23/04.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Inventor Or How to build things.
Piston The piston comprises of two pieces, the crown and skirt. The crown is subjected to high temperatures in the combustion space and is liable to be.
Solid Modeling at the University of Idaho Mechanical Engineering Department By: David Eld Jon Teske Nathan Petersen Theo White.
AAE450 Spring 2009 Mass Savings and Finite Element Analysis (FEA) Preparation for Orbital Transfer Vehicle (OTV) 100 gram Case Tim Rebold STRC [Tim Rebold]
Magnet System Definition L. Bromberg P. Titus MIT Plasma Science and Fusion Center ARIES meeting November 4-5, 2004.
Summary of the change request from KEK KEK suggested 4 changes to be made on the AFC. We have looked into the request carefully and discussed the implications.
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
NuMI Horn Construction and Testing
Two styles of horn fastener insulation schemes Larry Bartoszek Bartoszek Engineering.
1 EUROnu design System target + horn First thermal calculations on the target made of aluminium G. Gaudiot 02/06/2010 Strasbourg.
Technical Details of the T2K Horns L. Bartoszek BARTOSZEK ENGINEERING NBI2006.
1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns.
Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04.
JPARC Horn 1 Outer Conductor Middle Connection Larry Bartoszek Bartoszek Engineering.
Target Magnets & Shielding Bob Weggel Particle Beam Lasers, Inc. Magnet Optimization Research Engineering, LLC. March 5,
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
NuMI Horn Alignment Cross-hair System NuMI Horn Alignment Cross-hairs Target Hall Instrumentation Review November 18, 2002 David Ayres Argonne National.
A View of NCSX Structural System and Load Path for the Base Support Structure.
1.2 MW LBNE Horns Cory F. Crowley Fermi National Accelerator Lab September 25, th International Workshop on Neutrino Beams and Instrumentation Cory.
Summary of Platform and Hilman Rollers Deformation Studies John Amann ILC Mechanical Engineering 7/11/07.
Drawing of bolt and nut.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Assembly of the doorknob
Discussion for the LP endplate
Update on PANDA solenoid design
Art Deco Clock LED Light
Update on He3 Services design since the ORNL meeting
Development of a low material endplate for LP1 and ILD
PANDA Yoke of the Magnet
Project Overview CNC Introduction Applying CNC Designing for CNC
Rocket Difficulty Time Approximately 30–35 minutes Art Deco Clock
A. Mikhailichenko, D. Rubin
بسم الله الرحمن الرحيم.
Syllabus Introduction to drawing Dimensions and scale
He Is Able.
Rotational Volumes Using Disks and Washers.
Engineering Drawings ME 161
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
ISOMETRIC CIRCLES AND CYLINDERS
ENGN103 Engineering Drawing
Fusion 360 Pac Man Tutorial
TORSION CO 2 : ABILITY TO ANALYZE TORQUE-LOADED MEMBER EVALUATE THE VALUES AND DISTRIBUTION OF BENDING AND SHEAR STRESSES IN BEAM SECTION By: ROSHAZITA.
Text Reference: Chapter 32.1 through 32.2
Stainless Steel Corrugated Braided Hose Metal Expansion Joints
ENGN103 Engineering Drawing
CNGS horn / reflector in 2005: The story of the glass ring insulator
AutoPOL Unfolder for Windows Extended unfolding capability for SolidWorks.
Lenses This Presentation was used for Year 12 students.
Chapter 21, Electric Charge, and electric Field
ENGN103 Engineering Drawing
Miniature Train Wheels.
ISO view of pipe w/ individual EC detector installed
I find that the Corson spin-on filter adapter to have several flaws in it. Fortunately they are easily corrected by proper re-machining. It is work that.
Bunker Wall Design Wall ESS
Chapter 2 Using Drawing Tools & Applied Geometry.
Review of the Modal Analysis of the MiniBooNE Horn MH1
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
SNS Coupler Shipping Plans
SNS PPU Cryomodule Space Frame
Presentation transcript:

A First Pass at Modeling Horn 3 L. Bartoszek Bartoszek Engineering 12/10/04

Elevation view of horn 3 with 183 cm tall man for scale Need z dimension for placement of striplines through support module

Isometric view looking downstream

View looking downstream along axis of horn Need this dimension too to fix the ear and stripline design

View looking upstream along axis of horn

Isometric view looking upstream

Close-up of upstream end of horn M10 bolts 52 M16 ceramic washer assemblies I did not put in all the bolts holding the ears to the horn yet

Horn without stripline or ears

Outer Conductor rendered transparent

Inner Conductor fully welded

Man next to ceramic ring

Concern about previous picture That is the largest ceramic ring I’ve ever seen. I recommend making a part drawing for it and sending it out to Japanese and US ceramics vendors for their comments. Handling this ring will require some special tooling to avoid cracking from bending stress.

Coss-section showing approximate pattern of vee nozzles

Concern about previous picture The standard 110° “vee” spray nozzles may be too diffuse to get good heat transfer at the small radius of the center of the horn (“neck”). May need sharper, more circular nozzles to direct spray at the neck of the inner conductor.

Conclusions Need more dimensions to finalize the stripline and ear designs This horn is the original geometry Ichikawa sent me, not reduced by 90 mm (to be able to make flanges from available stock). –Large flanges may be made by forged rings I am slightly concerned about the relatively thin wall of the outer conductor leading to large tolerances/deflections from circularity –Flanges add stiffness and may keep OC round—only analysis will tell.