PRR619 Procedural History DSWG discussed the need to reduce market exposure to default should negative bids be selected and result in negative $/MW MCPC.

Slides:



Advertisements
Similar presentations
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Advertisements

INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
DSWG Update to WMS May 17, DSWG Goals Update.
Loads Acting as a Resource Relationships with QSEs and LSEs
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
1 TAC Report to the ERCOT Board June 21, TAC Summary 8 PRRS 8 PRRS Withdrawal of PRR 552 Withdrawal of PRR 552 Potomac Recommendations Potomac.
Final Report Weather Sensitive Emergency Response Service (WS ERS) Pilot Project Carl Raish, ERCOT Technical Advisory Committee November 7, 2013.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
1 RPRS Market the issue of capacity inadequacy solved by the Local Congestion procurements ERCOT Feb 19, 2004.
ERS Update – DSWG Presentation September 21, 2012.
LMP-G Policy Issues Matrix LRISv2 Subgroup July 23 rd,
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
1 TAC Report to the ERCOT Board January 17, 2006.
PRR 705 ERCOT Emergency Interruptible Load Service PRS January 22, 2007.
PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher October 20, 2004.
1 Nodal Day Ahead Invoice Taskforce March 13, 2007 Presentation to COPS.
1 TAC Report to the ERCOT Board November 14, 2006.
1 PRR479 IDR Optional Removal Threshold (ERCOT Project PR40055)
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Update: 30-Minute Emergency Response Service (ERS) Pilot Project Mark Patterson, ERCOT October 7, 2013.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
QSE Managers Working Group Meeting Notes November 10, 2009 Report to WMS November 18, 2009 Jennifer Troutman – Vice Chair.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
1 Commercial Operations Working Group Update to TAC April 7, 2005.
Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.
DSWG Update to WMS March 22, Demand Side Working Group Goals.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
ROS Presentation: Dynamic Scheduling and EEA Austin, TX September 10, 2009 Steve Isser Vice President and General Counsel Good Company Associates
Protocol Revision Subcommittee
Exceptional Fuel Costs in LMP
TAC Report to the ERCOT Board
Retail Market Subcommittee Update to TAC
August 25, 2016 TAC Update to COPS
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
ERS Procurement Methodology
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
TAC Report to the ERCOT Board
Principles of Participation in Real-Time Co-optimization
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Market Notice Regarding Off-line Units
Alternative Approach for Loads in SCED v.2
Txho/10627 HLP089.PPT DSWG LaaR Update May 13, 2005.
Stacking Implementation Plan
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Reflecting Losses in DR within ERCOT August 22, 2012
The New Texas Wholesale/Retail Market
Further Information on MISO FTR Auctions
Compliance Report to ERCOT TAC February 2007
Presentation transcript:

PRR619 Procedural History DSWG discussed the need to reduce market exposure to default should negative bids be selected and result in negative $/MW MCPC for responsive reserve service PRR619 Drafted and sent to PRS in July WMS was silent on action for or against the PRR in its August 2005 mtg PRS did not garner enough votes to make a recommendation to TAC in its August 24 th mtg - Motion to recommend approval failed 2.5 to 3.5 PRS voted 3.8 to 2.1 to recommend the PRR to TAC in its October 27 th meeting TAC overwhelmingly rejected PRR619 at its October mtg and submitted request for WMS to review the issue for discussion / recommendation from WMS

Discussion on PRR619 1.Failure, in an Interval, of a LaaR to Provide Capacity it was cleared for by ERCOT results in ERCOT procuring capacity from active bids or opening a 2nd market. The party that “fails” to provide the service it is cleared for conceptually bears the cost Negative bid reverses the direction of the normal cash flow so the “Failing Party” is Paid by the “replacing party” if a Negative bid is in place when ERCOT procures the replacement capacity The Dollar exposure is limited by the max digits in bid software times (1150 MW LAAR limit minus the Self Scheduled LaaR) 2.Possible short pay to the market if a large negative bid in an interval is cleared and the entity with the negative bid is not financially able to pay.

Discussion on PRR619 (continued) 3.Instituting a forced proration on all LaaR Capacity Bids removes participant latitude to determine each QSE’s own bid strategy 4.Risk / Consequences of leaving negative bids in place and thus open to being cleared in secondary markets for RRS is well known to QSEs. 5.Excerpts from WMS August 2005 mtg minutes PRR 619 would give no incentive to bid negative although the capability is still there. There may be pros and cons regarding having a separate market for LaaRs. PRR 619 is a low cost alternative to protect the market from what might not ever happen but could happen. PRR would eliminate competition between loads that have different costs for interruption and that the market would lose the ability to differentiate between them. Practical effect of PRR 619 was that it would impose a zero-dollar floor and it was inconsistent with the way the market currently works and interferes with market processes that are already in place.