Working group meeting 07/05/15. Agenda Overview of review and current action list Relief system – Summary of problem – Details of analysis, testing and.

Slides:



Advertisements
Similar presentations
1 AFSWG Mtg 15 Aug 2003 Elwyn Baynham RAL Safety Overview Work done by RAL Group Contributors Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov.
Advertisements

Hydrogen Pre-Operation Safety Review 4 th October 2011 Hydrogen R&D System Operational Procedures and Test Plan M Courthold.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
MICE hydrogen review Commissioning, testing and operations.
Review of Helium Venting Analyses
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
MICE Safety Review Process and Schedule Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov Columbia Meeting June 2003.
MICE RF Module Safety Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting February 12, 2005.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
Absorber/vacuum windows and absorber assembly 1.Window Requirements 2.MICE experimental constraints 3.Welded vs. non-welded windows 4.Installation 5.Testing.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
A presentation at the MICE Video Conference on Wednesday the 5 th of May 2004 Response to the Safety review comments by Wing Lau -- Oxford.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
H2 Safety Review - response paul drumm MICE VC, March 29 th,2006.
Matthew Hills Hydrogen System – Piping and Instrumentation Diagram.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Hydrogen system status Yury Ivanyushenkov for Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
MICE Hydrogen System MICE Collaboration Meeting, CERN, 29 March-2 April 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
Mechanical Safety Systems and DSEAR Compliance
MICE hydrogen review System modifications. Relief circuit repair During leak testing of R&D tests, the insulating vacuum would not go lower than
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Meeting October 2004 – Coseners House.
Patrick Thornton, SNS/FPE June 9, 2008
The MICE Hydrogen System Summary Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford Appleton Laboratory.
NATIONAL INSTITUTE OF AEROSPACE TECHNOLOGY Rosa Mª Rengel Gálvez Marina B. Gutiérrez García-Arias 11/09/2007 Rosa Mª Rengel Gálvez Marina B. Gutiérrez.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
1 Liquid Hydrogen R&D test report Video Conference – 23/08/12 S Watson P Warburton M Courthold.
Cryomodule Helium Vessel Pressure -- a Few Additional Comments Tom Peterson 18 November 2007.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
DEVELOPING FIRE TESTS FOR FCV AND HYDROGEN VEHICLES Glenn Scheffler Consultant for the US Department of Energy August 2010 DEVELOPING FIRE TESTS FOR FCV.
The MICE Hydrogen System Safety Review Introduction Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford.
Hydrogen Delivery System Schedule MICE Schedule Review 23 rd -25 th May 2011 M Hills STFC.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
MIPO meeting 12/05/15. Exec summary Working group satisfied in integrity of absorber vessel and windows, pending review of reports – Proof test at 2.2.
MICE LH2 Absorber Safety Mary Anne Cummings Edgar Black (IIT) Abingdon, UK Oct. 30, 2003.
Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham.
1 Liquid Hydrogen R&D test report CM34 – 17/10/12 S Watson P Warburton M Courthold.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
1 MICE absorbers work package MPB – 27/10/15 Mike Courthold Mark Tucker Phil Warburton Steve Watson.
1 MICE Absorbers work package MPB – 17/04/15 RAL Tom Bradshaw Vicky Bayliss Mike Courthold Matt Hills Andy Nichols Roy Preece Mark Tucker Steve Watson.
1 MICE Hydrogen system Working group mtg – 01/09/14.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
NPDG Liquid Hydrogen Target: Design and Safety Features
IBBelle: Status & Plans
Hydrogen System Update
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Absorber progress MICE-ISIS review of the liquid hydrogen system will be held in early January; guidance from Nominated Engineers on the imported absorber.
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
Block 4 and Cluster D - Safety
Status of Hydrogen System Development
Sandia National Laboratories
ESS elliptical cryomodule
Experimental equipment Edgar L. Black February 17, 2019
Overview of the TARGET Monolith Rough Vacuum
Burst Disc Review Closeout 21 May 2019 J.G. Weisend II, Chairman.
Presentation transcript:

Working group meeting 07/05/15

Agenda Overview of review and current action list Relief system – Summary of problem – Details of analysis, testing and proposed solution – Discussion on suitability and wider implications of solution HAZOP – Summary of previous HAZOP study – System and contextual changes – Discussion on whether further HAZOP activity is necessary AOB

Review To review the installation and operational methodology of the MICE liquid hydrogen system for its compliance with all relevant safety frameworks Comments: – Recognition that the system is substantially similar to the R&D with the exception of the hydride bed and the beam windows – Removal of the hydride bed is seen as a positive move – Uncertain which previous review actions are still outstanding and relevant – The safety approval method followed before still stands Recommendations – Review relief system by revisiting calculations and carrying out testing where necessary – Consider need for a third HAZOP exercise – Develop a maintenance plan – Revisit emergency procedures – Define competency of ‘expert staff’ – System to be considered in a pre-operations review of the entire integrated MICE system

Relief system LH2 Vacuum Gas panel Two failure scenarios – Heat load into absorber, causing rapid boiling of LH2 through absorber relief line – Absorber window rupture, causing rapid boiling of LH2 predominantly through vacuum relief line AbsorberVacuum Both PRV Δ0.5 bar

Relief system Heat load scenario – Significant heat can only feasibly come from a vacuum failure but… A safety window rupture would not cause a vacuum failure The surrounding vacuum vessels are substantial and unlikely to fail in a catastrophic way Small leaks, such as from seal degradation, would not result in rapid boil-off – Nevertheless, if such a vacuum failure were to occur, two estimates of the heat load into the LH2 were made: Film boiling i.e. maximum possible rate of heat transfer, regardless of ΔT ~ 19kW CERN paper with experimental data suggesting actual max heat transfer would be ~5kW – The latter figure was taken, doubled, and used to calculate a boil-off rate of kg/s – This was used to calculate a total pipe pressure drop from absorber to flame arrestor of 1.92 bar – The assembled absorber was successfully proof tested to 2.2 bar (report pending)

Relief system Window failure scenario - review suggested revisiting both pipe loss calculations and FEA – Calculations by S. Harrison show as installed system would result in a bar pressure rise – Window FEA suggests bar burst pressure with ~20% error – Burst test on thinnest window validates error margin, with FEA saying 9.66 bar and window bursting at 7.66 bar Proposal is to use the existing vacuum line instead of a dedicated relief line – Will completely bypass the gas panel – Line is (almost) exclusively = or > 100mm dia – Turbo pump will be circumvented using a welded burst disc – Two low pressure relief valves will be used to assist backing pump in admitting flow into the enclosure

Relief system Safety windows 009 and 014 are fitted – 009 is 20% thicker than specification, so FEA burst pressure is > 11 bar – 014 is 10% thinner than specification, so FEA burst pressure is bar Taking 20% error margin into account, the burst pressure of the system is 8.5 bar This means relief system must limit pressure rise to 4.25 bar to achieve FoS of 2 Latest calculation shows pressure rise of 4.4 bar (pending update) – Noted that this is “probably an overestimate because there are a few conservative assumptions” No obvious way to reduce line impedance further Is this acceptable based on current evidence?

HAZOP The internal review committee gave a ‘green light’ for the liquid hydrogen R&D work in October 2011 but asked for a second HAZOP exercise to look at the operation of the system in the full experimental context. The purpose of this Procedural HAZOP was to provide a review of the procedures detailed in the Operating Instructions to identify hazards and causes for operational problems, quality problems, and delays, with due consideration for the operation of the hydrogen delivery system within the context of the other surrounding operating facilities.

HAZOP System changes that will impact on operating procedures – Hydrogen from bottle pack Fill procedure now similar to hydride bed charging No hydrogen bottle manoeuvres inside the Hall Bottle regulator outside the Hall No issues associated with heater-chiller unit – Absorber with windows Absorber windows cannot tolerate back pressure – Relief route uses vacuum line Overpressure in vacuum space results in high concentration of hydrogen inside pump enclosure Are these changes sufficient to justify another HAZOP exercise?

AOB