CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.

Slides:



Advertisements
Similar presentations
Optimisation of Roebel cable for HTS accelerator magnets
Advertisements

Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Superconducting Large Bore Sextupole for ILC
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
Oct , 2013, CDP D.R. Dietderich LARP Conductor & Cable Review 1 Conductor Development Program Support for LARP and HiLumi LARP- HiLumi Conductor.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
DOE Review of LARP – February 17-18, 2014 QXF Conductor and Cable Arup K. Ghosh Feb
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
TASK Conductor Studies First Proposal CERN – 09 th July 2015 EuroCirCol Meeting – WP5.
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Status of MQXF Conductor LARP Update
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
G.A.Kirby 4th Nov.08 High Field Magnet Fresca 2 Introduction Existing strand designs, PIT and OST’s RRP are being used in the conceptual designs for two.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
Arjan Verweij, AT-MAS, Workshop on test facilities and measurement equipment needed for the LHC exploitation, 12 April 2006 B163 - FRESCA.
1st FNAL-CERN Collaboration Meeting Fermilab, May 13, 2011
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
E. Todesco OUTPUT OF THE CABLE REVIEW E. Todesco and the QXF team CERN, Geneva Switzerland CERN, 10 th December 2014 QXF design review, CERN.
LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL1 LARP Cable R&D FY05 & FY-06 Plans D.R. Dietderich, LBNL Geneva, IL October 5-6, 2005 bnl – fnal – lbnl.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
1 Cable Functional Specification March Conductor Working Group Arup K. Ghosh (BNL)
HL-LHC QXF Conductor/Cable Internal Review. Thank You First of all, let me thank everybody for accepting an extended work time and have this meeting over.
Report from Session 2 Main Dipoles. P. McIntyre 2005 – 24T ss Tripler, a lot of Bi-2212, Je = 800 A/mm2 E. Todesco T, 80% ss 30% NbTi 55 %NbSn.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
Logo area 11 T Wire: Procurement Strategy and QA/QC B. Bordini, A. Ballarino, M. Macchini Acknowledgments: thanks to E. Charifoullina for her contribution.
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LARP DOE Review July 13-14, 2009Materials – Conductor Support - A. Ghosh1 LARP DOE Review July , 2009 FNAL 2.4 Materials – Conductor Support Arup.
LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.
QXF Cable with Annealed Wire D.R. Dietderich QXF Working Group Video Meeting, Feb. 12, 2014.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
CERN Cabling Experience FRESCA 2, 11 T Dipole and MQXF A. Ballarino
MQXF cable with RRP wires for Q2
Model magnet test results at FNAL
11 T cable development and procurement strategy at CERN
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Development of High Current Nb3Sn Rutherford Cables for NED and LARP
At ICFA Mini-Workshop on High Field Magnets for pp Colliders,
CERN Conductor and Cable Development for the 11T Dipole
Mechanical stability and QXF coil winding
MQXF Short Models Status and Plans
Procurement of Nb3Sn strand for coils assembled at CERN
the MDP High Field Dipole Demonstrator
MQXF cable with RRP wires for Q2
MQXF updates P. Ferracin October 9th, 2014.
11T Dipole for the LHC Collimation upgrade
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
FRESCA Facility for the REception of Superconducting CAbles
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Presentation transcript:

CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013

Outline  Cable specification and procurement Medium and long term strategy  Cable development Status of R&D activity Cable geometries and first test results On-going and future activities  Conclusions A. BallarinoNapa, LARP Meeting, 9 April 2013

Strand specification A. BallarinoNapa, LARP Meeting, 9 April 2013

Strand procurement (1/3)  RRP 132/169  PIT 192 Strand for Cabling Optimization ( ) 5 km of RRP Nb-Ti 132/169 - Delivered in December 2012 Measured characteristics: RRR > 150 Ic(12 T) > 700 A Jc(12 T) > 2800 A/mm 2 5 km of PIT Nb-Ta Delivered in March 2013 To be measured at CERN A. BallarinoNapa, LARP Meeting, 9 April 2013

Strand procurement (2/3) Strand for Long Prototype Program (2016) 6 coils, 5.4 km of cable (UL=900 m),  220 km of strand Procurement (  440 km) to be launched by end 2014 – for deliveries as from mid 2015 Strand for Short Model Program ( ) 12 coils, 2 km of cable,  100 km of strand km of RRP 132/ km of PIT 192 Technical specification out for tendering. Orders to be placed in May 2013 Deliveries as from November km – to be ordered by beginning 2014 A. BallarinoNapa, LARP Meeting, 9 April 2013

km Short Model: 30 km Long Prototype: 400 km Series Short Model: 70 km Strand procurement (2/3) Series production:  2500 km of Nb 3 Sn strand A. BallarinoNapa, LARP Meeting, 9 April 2013

 2.5 tons Nb 3 Sn strand procurement at CERN Fresca 2 11 T Hi-Lumi Quadrupole A. BallarinoNapa, LARP Meeting, 9 April 2013

Cable specification 433 A 496 A 538 A Iop  25 % margin on the load 1.9 K P. Ferracin Iop = A Bpeak = 12.2 T A. BallarinoNapa, LARP Meeting, 9 April 2013

Cable R&D Status  Assembly of short prototypes cables with copper and RRP strands (RRP 132/169)  Cables assembled do not contain -yet - stainless steel core  PIT strands delivered in March 2013 – cabling in April 2013 A. BallarinoNapa, LARP Meeting, 9 April 2013

Cable R&D Objectives:  Develop an optimized cable geometry made from 40 strands Nb 3 Sn wires of 0.85 mm diameter meeting the electrical characteristics specified by the magnet design;  Limit the Ic degradation to 100;  Make cables from RRP and PIT strands – with the objective of possibly converging to the same cable geometry;  Perform a series of validation tests on strands and cables (FRESCA test station) A. BallarinoNapa, LARP Meeting, 9 April 2013

Cable R&D Width (mm) Mid-th (mm) LT (mm) Ic degr (%) Keyst. (deg) Compact. (%) FRESCA 2* < T** < * 40 strands of 1 mm diameter, PIT and RRP strands ** 40 strands of 0.7 mm diameter, RRP strands Experience at CERN on Nb 3 Sn cables A. BallarinoNapa, LARP Meeting, 9 April 2013

Cable R&D Width : 17.8 mm Width compaction C w = Mid-thickness : 1.50 and 1.53 mm Keystone angle : 0.65 degree Pitch length : 113 mm (17.5 o ) and 125 mm (16 o ) Cw larger than its value for the FRESCA2 cable (- 4.6) but smaller than its value for the cable for the dipole DS 11 T (- 2.6). A. BallarinoNapa, LARP Meeting, 9 April 2013

Fabrication of 17.8 mm wide cables without core RRP - 132/169 Cable R&D SampleMid-thicknessPitch lengthKeystone angle 1~ 1.53 mm113 mm~ 0.55 – 0.58 degree 2~ 1.53 mm125 mm~ 0.55 – 0.58 degree 3~ 1.50 mm113 mm~ degree 4~ 1.50 mm125 mm~ 0.55 – 0.58 degree  4 cables - 3 m long  2 mid thicknesses (1.53 mm and 1.50 mm)  2 pitch lengths (113 mm and 125 mm) A. BallarinoNapa, LARP Meeting, 9 April 2013

Cable R&D PL=113 mm, 1.50 mm 3.9 % (Ic max. 5.8%) PL=113 mm, 1.53 mm 2.9 % (Ic max. 6.6%) PL=125 mm, 1.50 mm 2.7 % (Ic max. 4.4%) PL=125 mm, 1.53 mm 0.52 % (Ic max. 2.4 %) Mid-thickness Pitch 4.3 K 12 T 4.3 K 12 T 4.3 K 12 T 4.3 K 12 T A. BallarinoNapa, LARP Meeting, 9 April 2013

Cable R&D Average Ic degradation = 1.8 % 4.3 K 12 T A. BallarinoNapa, LARP Meeting, 9 April 2013

Cable R&D T=4.3 K Extracted strands –three Is > 1000 A A lot of margin… A. BallarinoNapa, LARP Meeting, 9 April 2013 Ic (A) B (T)

Mid-thickness ~ 1.50 mm, PL = 113 mm

Mid-thickness ~ 1.50 mm, PL = 125 mm

On-going activities  Cabling of Ruftherford cables with SS core – PIT and RRP w=17.3 mm, mid-th=1.50 and 1.53 mm, LT=109 mm  After feedback from magnet winding, change - reduction- of keystone angle to increase compaction on the large edge and reduce compaction on the narrow edge. Objective: improve mechanical stability and reduce filaments deformation A. BallarinoNapa, LARP Meeting, 9 April 2013

Cable Tests in FRESCA 1/2  Short Term Plan: test of cables (132/169 RRP, 192 PIT) with and without core by using the regular FRESCA power supply (up to 32 kA) 1. Critical current measurements at 4.3 K ( cable critical current at 12 T lower ~ 29 kA; cable self-field 0.8 T per 10 kA, maximum applied field 10 T) 2. Measurement of the stability current at 4.3 K and 1.9 K 3. Quench current measurements when simultaneously ramping the sample current and the applied magnetic field; ramp-rate dependence study 4. Measurements of the cable thermal stability (strip heaters impregnated with the cable samples) 5. Measurements of the quench propagation velocity A. BallarinoNapa, LARP Meeting, 9 April 2013

Cable Tests In FRESCA 2/2  Medium Term Plan : test of cables with and without core by using the 100 kA transformer 1. Critical current measurements at 4.3 K and 1.9 K with different applied field orientations to identify weak spots in the cables 2. Measurement of the stability current at 4.3 K an d 1.9 K up to 100 kA 3. Quench current measurements when simultaneously ramping the sample current and the applied magnetic field; ramp-rate dependence study A. BallarinoNapa, LARP Meeting, 9 April 2013

Additional studies  Critical current measurements of rolled wires (PIT and RRP)  Critical and Stability Current measurements of extracted strands  Critical Current Measurements of strands under axial and transversal load (UniGe)  Inter-strand resistance of cables with and without core A. BallarinoNapa, LARP Meeting, 9 April 2013

Conclusions  Conductor for R&D activity has been procured. Conductor procurement strategy has been made. According to the present plan of installation of the Hi-Lumi magnets, conductor procurement for the series production shall be launched by beginning 2016  Cable development has started. First results with the selected cable geometry indicate low Ic degradation and sufficiently high RRR but possibly need for improvement of mechanical stability. Plan for development of both PIT and RRP cable is established A. BallarinoNapa, LARP Meeting, 9 April 2013

Thanks for your attention