Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.

Slides:



Advertisements
Similar presentations
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Advertisements

Brookhaven Science Associates U.S. Department of Energy Todd Satogata 1 Fri May RHIC FY03 Deuteron-Gold Performance n RHIC Deuteron-Gold Performance.
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
Run 12 RHIC Machine/Experiments Meeting 7 Dec 2011 (3 rd meeting) Agenda: Run 12 Priorities.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Run 16 RHIC Machine/Experiments Meeting 5 Jan 2016 Agenda: Run 16 Schedule (Pile) AuAu Run Plan (Gu) Projections for deuteron-gold energy scan (Liu) STAR.
Nuclear Phase Transition Diagram Mar RHIC Monday Meeting T. Satogata DOE NSAC Long Range Plan … a whole page! (one out of 14)
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
Run 10 Start-up Status
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Experience and Projections for Low-Energy RHIC Operations Todd Satogata, Collider-Accelerator Department June 9, 2006 Motivated by discussions at the “Can.
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
SPOUSE LEADERSHIP DEVELOPMENT COURSE (SLDC) CLASS 68
ABT & Frequency.
Run16 Y. Akiba.
Run-5 Cu-Cu Integrated Luminosity
Presentation transcript:

Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to 4.5K complete in both rings! – Dec. 5, beam setup in RHIC begins. – Dec 16, 20 hr unplanned Maintenance day – Dec 20 (AM)-21(PM), blizzard 09 shut us down – Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late) – Dec 31 (midnight-store 11340), Machine (and PHENIX?) Physics declared  s=200 GeV/n Au-Au – Jan 2 (midnight) STAR in Physics Mode – Jan 8 (0600) PHENIX in Physics Mode – Jan 12, Rebucketing not yet routine, stochastic cooling still to come. – Jan 22, changed beta* from 0.6 to 0.7 meters, rebucketing ~established, yellow transverse stochastic cooling on – Mar. 11, End 10 week  s = 200 GeV/n Run, begin  s = 62.4 GeV/n setup – Mar. 13, Begin 4 week  s = 62.4 GeV/n run – Apr. 10, End 4 week  s = 62.4 GeV/n Run, begin  s = 39 GeV/n setup – Apr. 12, Begin 1.5 week  s = 39 GeV/n run – Apr 18-22, Satogata is away – Apr. 23, End 1.5 week  s = 39 GeV/n Run, begin  s = 7.7 GeV/n setup – Apr. 25, Begin 4 week  s = 7.7 GeV/n run – May 20, End 4 week  s = 7.7 GeV/n Run, begin  s = 5.0 GeV/n setup – May 23, End 4 week  s = 7.7 GeV/n Run, begin  s = 5.0 GeV/n setup – May 23 – 28 IPAC (Kyoto) – May 25, begin 0.5 week beam studies at  s = 5 GeV/n and ~ – 25 CRYO WEEKS – This is it unless we have $’s to run longer – revisit in March – May 29, end 0.5 week studies – May 31, begin  s = 11.5 GeV/n for STAR – Jun 8, – 27 CRYO WEEKS – Jun 15, end 2 week  s = 11.5 GeV/n run – Jun 15, Begin Cryo Warm-up – Jun 16, Warm-up complete, Run 10 ends – 28.2 CRYO WEEKS

Possible Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings! Dec. 5, beam setup in RHIC begins. Dec 16, 20 hr unplanned Maintenance day Dec 20 (AM)-21(PM), blizzard 09 shut us down Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late) Dec 31 (midnight-store 11340), Machine (and PHENIX?) Physics declared  s=200 GeV/n Au-Au Jan 2 (midnight) STAR in Physics Mode Jan 8 (0600) PHENIX in Physics Mode Jan 12, Rebucketing not yet routine, stochastic cooling still to come. Jan 22, changed beta* from 0.6 to 0.7 meters, rebucketing ~established, yellow transverse stochastic cooling on Mar. 18, End 10 week  s = 200 GeV/n Run, begin  s = 62.4 GeV/n setup Mar. 20, Begin 4 week  s = 62.4 GeV/n run Apr. 17, End 4 week  s = 62.4 GeV/n Run, begin  s = 39 GeV/n setup Apr. 19, Begin 1.5 week  s = 39 GeV/n run Apr 18-22, Satogata is away Apr. 30, End 1.5 week  s = 39 GeV/n Run, begin = 0.67 studies before polarity switches begin (i.e. this is a placeholder) May 1, complete = 0.67 studies for pp and  s = 7.7 GeV/n setup (12 hr pol. switches) May. 3, Begin 4 week  s = 7.7 GeV/n run May 23 – 28 IPAC (Kyoto) May 25 – 25 cryo weeks May 31, End 4 week  s = 7.7 GeV/n Run, begin  s = 5.0 GeV/n setup (6 hr polarity switch) Jun 2, begin 3 day beam studies at  s = 5 GeV/n Jun 5, end 3 day studies begin  s = 11.5 GeV/n setup Jun 7, begin  s = 11.5 GeV/n for STAR Jun 8 – 27 cryo weeks Jun 21, end 2 week  s = 11.5 GeV/n run Jun 22, Begin Cryo Warm-up Jun 23, Warm-up complete, Run 10 ends – 29.2 CRYO WEEKS

PHENIX Goal* * With 20 cm sigma IR diamond PHENIX Minimum Goal* STAR Goal ~12%/week 

Goal Min Max

13 Feb – 2 Mar 10 PHENIX ~ Saturated Look at this one in detail

Fills Feb 10 L peak from Table 2 (Maximum Luminosities) L store average from Table 2

Fills Feb 10 Max ions/bunch goal from Table 2, 1.1 x 10 9

Fills Feb 10, Longitudal Stochastic Cooling (yellow not operating)  30 % reduction

Fills Feb 10, Transverse Stochastic Cooling

Fill 11489, no cooling, no rebucketing (0.6 m beta*) Monday, 18 Jan. RingBunches/Cycles Avg Bunch in RHIC (10^6 ions) Avg Efficiency XCBM to RHIC XCBM to Uxf1Uxf1 to WxfWxf to ArcArc to RHIC Blue111/ Yellow111/

Ring Bunches/Cycl es Avg Bunch in RHIC (10^6 ions) Avg Efficiency XCBM to RHIC XCBM to Uxf1Uxf1 to WxfWxf to ArcArc to RHIC Blue56/ Yellow56/ Injected Beam Statistics for Fill number Started filling RHIC: Thu Dec 31 22:51: , Fill complete: Thu Dec 31 22:59: , Minutes to fill: 7 31 Dec 1 st Physics Store 28 Feb Physics Store 11824, 0.7 m b* with some cooling and with rebucketing RingBunches/Cycles Avg Bunch in RHIC (10^6 ions) Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC Blue111/ Yello w 111/ /29Yellow /28Blue Arc to RHICWxf to ArcUxf1 to WxfXCBM to Uxf1 Avg Efficiency XCBM to RHIC Avg Bunch in RHIC (10^6 ions) Bunches/CyclesRing 18 Jan Physics Store 11489, 0.6 m  * No cooling or rebucketing

Future Topics 3 rd integar studies update – M. Bai Toward Smaller beta* - new quad triplets – D. Trbojevic

Archive

Through Dec 2009

Through 2/15/10

5 June 0722 (w/o stochactic cooling) 1.02 x 10 9 /bunch 0.97 x 10 9 /bunch Run 7 Fill 8878 Injected Beam Statistics from ELOG Blue = 103 bunches 1.04x10 9 /bunch Yellow= 103 bunches 1.13x10 9 /bunch

5 June 0723 Store 8849 (w/stochactic cooling) 1.02 x 10 9 /bunch 0.97 x 10 9 /bunch Run 7 Fill 8849 Injected Beam Statistics from ELOG Blue = 103 bunches 1.23x10 9 /bunch Yellow= 103 bunches 1.15x10 9 /bunch

5 June 0724 Physics ON Loss in 3 hrs = 3.1 = 3.7

Physics production or beam studies weeks  s NN (GeV) 25-cryoweek run27-cryoweek run STAR Beam 5 GeV  Revised Run 10 Plan, Nov 25, 2009

Run 10 Au-Au Goals 11/19/09 STAR –  s = 200 GeV/n Luminosity Sampled/Delivered = 2/4 nb M Central Events 300M Min-bias events PHENIX –  s = 200 GeV/n Luminosity Recorded/Delivered = 1.4/>6 nb -1 Minimum Goal: – Luminosity Recorded/Delivered = 1.1/3.9 nb -1

Run 7 Fill 8544

Through 30 Nov 09

– Oct. 5, N2 scrubbing – Oct. 30, Temp. Control devices in and ready (required for 45 K wave cooldown). – Nov. 2, 45 K wave begins. – Nov. 12, AGS Testing. – Nov , APEX Workshop – Nov. 16, beam setup in Booster and AGS – Nov , RHIC Dry Run – Nov 22, Beam extracted from AGS to W dump Run 10 Setup

Wednesday midnight Thursday midnight

25 Cryo Weeks