EUROnu Review: 14 th April 2011 Summary of WP3 J. Pozimski.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
1 Neutrino Factory Front End (IDS) and Variations David Neuffer G. Prior, C. Rogers, P. Snopok, C. Yoshikawa, … August 2011 NuFACT99 -Lyon.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
UKNF OsC RAL – 31 st January 2011 UKNF achievements & plans J. Pozimski.
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
ABSTRACT The International Design Study for the Neutrino Factory (IDS- NF) baseline design 1 involves a complex chain of accelerators including a single-pass.
UKNF OsC RAL – 21 & 22 June 2010 UKNF achievements & milestones J. Pozimski.
, WP1 Meeting, RAL J. Pasternak Status and Recent Progress in the Muon FFAG Designs for the NF J. Pasternak, Imperial College, London / RAL STFC.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Ajit Kurup, C. Bontoiu, M. Aslaninejad, J. Pozimski, Imperial College London. A.Bogacz, V. S. Morozov, Y.R. Roblin Jefferson Laboratory K. B. Beard, Muons,
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
European design study on Neutrinofacilities - Euronu within FP7.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Muon Acceleration Plan David Kelliher ASTeC/STFC/RAL UKNF WP1, October 9 th, 2008.
UKNF OsC RAL – 30 st January 2012 UKNF - Status, high lights, plans J. Pozimski.
Operated by JSA for the U.S. Department of Energy Muons, Inc. Winter MAP Mtg, Mar. 2 nd, 2011 Pre-Linac simulations in G4beamline Kevin B. Beard Muons,Inc.
Quantitative Optimisation Studies of the Muon Front-End for a Neutrino Factory S. J. Brooks, RAL, Chilton, Oxfordshire, U.K. Tracking Code Non-linearised.
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
1 of 12 Stephen Brooks JAI Advisory Board, February 2006  Neutrino Factory Muon Beam Production Studies.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
Recent Progress Toward a Muon Recirculating Linear Accelerator S.A.Bogacz, V.S.Morozov, Y.R.Roblin 1, K.B.Beard 2, A. Kurup, M. Aslaninejad, C. Bonţoiu,
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
K. Long, 27 January, 2016 The International Design Study for the Neutrino Factory ▬ status, and plans.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
Context of the Neutrino Factory Neutrino factory (2018) –4MW proton driver –p +   +   +  e + e  Linear e + e − collider (2014/5) –Leptons at 0.4.
1 Task particle simulations studies: progress report M. Giovannozzi Objectives To study the field quality tolerances for new magnetic elements for.
Nufact02, London, July 1-6, 2002K.Hanke Muon Phase Rotation and Cooling: Simulation Work at CERN new 88 MHz front-end update on cooling experiment simulations.
February 28, 2011NF Report - Zisman1 Neutrino Factory Design Overview and IDS-NF Status Michael S. Zisman* Center for Beam Physics Accelerator & Fusion.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
1 Alternative options for beam cooling for a muon accelerator front-end Diktys Stratakis Physics Department Brookhaven National Laboratory Front-End Phone.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz 1 Status of Baseline Linac and RLAs Design.
Proposal Preparation. Documents for June PAC  Full Proposal  Starting point is LOI + updates in EOI  Project Definition Report  Cost estimate  Excel-based.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz 1 Muon Acceleration – RLA, FFAG and Fast Ramping.
, UKNF Meetin, Imperial College J. Pasternak Status and Recent Progress in the Muon FFAG Designs J. Pasternak, Imperial College, London / RAL.
, IDS Meeting, Fermilab J. Pasternak Challenges of muon FFAG: injection/extraction, beam dynamics and injection/extraction hardware design studies.
1 6D Cooling Chris Rogers, ASTeC-STFC Topical Workshop 23 Oct 2007.
1May, IPPP- Imperial College, London1 NF activities at IC (part II) m. apollonio.
The Accelerator Complex from the International Design Study
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
for the Neutrino Factory
Modeling the Upper, Middle, & Lower
Muon Front End Status Chris Rogers,
Outline: Why now ? What ? How ?
Accelerator R&D for Future Neutrino Projects
Beam Dump outline work plan (UK perspective)
Physics Processes Missing from our Current Simulation Tools
Muon RLA - Design Status and Simulations
K.B. Beard1#, S.A. Bogacz2, V.S. Morozov2, Y.R. Roblin2
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
Morteza Aslaninejad Cristian Bontoiu Juergen Pozimski
Muon Collider Magnet Technologies/Challenges
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

EUROnu Review: 14 th April 2011 Summary of WP3 J. Pozimski

EUROnu Review: 14 th April 2011 Overview Status of WP3: Milestones and Deliverables IDR Costing Summary

EUROnu Review: 14 th April 2011 WP3 - Milestones Milestone month (from start) Evaluation of baseline front-end15 √ Evaluation of acceleration systems 18 √ Evaluation of performance of alternative cooling and acceleration 24 √ Specification of proton-beam handling system 24 √ Benchmark costing for muon front-and acceleration systems 30 - lattice and component (physics) design available, results published - costing framework under development (more later) Initial health-and-safety evaluation of proton-beam handling system 38 Cost and Performance evaluation complete40 Comparison of physics performance of all facilities 43

EUROnu Review: 14 th April 2011 WP3 - Deliverables 1Completed review of ionisation-cooling and muon front end 15 month √ D5 2Completed review of muon acceleration 18 month √ D6 3Completed simulation of baseline and alternative ionisation-cooling channel, including a cost and performance analyses for reference muon front end. 30 month work in progress, simulations complete and results published, costing in preparation 4Completed simulation of baseline and alternative muon acceleration system and the decay rings and evaluation of reference design for spent proton-beam handing system, including a cost and performance analyses. 38 month 5Complete end-to-end simulation and evaluation of the performance of the Neutrino Factory as input to the comparison 42 month

EUROnu Review: 14 th April 2011 Major achievements  Benchmarking Fluka results with Mars and comparison with HARP data  Investigation of particle dynamics in the baseline muon front end lattice and investigation of the performance of alternative lattices  Studies of power deposition in the target and pion capture area due to secondary radiation => trigger for significant change in design of target& capture area => revaluation of capture required  Studies of solid and liquidized power jet targets for mercury risk mitigation  Detailed studies of fringe field effects in linac, benchmarking of Optima gainst MADX, GPT and G4beamline  Modelling of accelerator components (cavities, solenoids, dipoles, quadrupoles and sextupoles), calculation of field maps and comparison with study 2a results  Multi-particle simulations of the muon linac using field maps, comparison of gained results from various software packages with good agreement in transversal and longitudinal particle dynamics and particle loss pattern.  Detailed studies of beam injection and extraction into the FFAG, first preliminary studies of kicker and septum design as well as kicker electronics. => trigger for significant change in FFAG design.  First studies of combined function FFAG magnets and particle tracking in field-maps  Detailed studies of beam loading effects in the muon accelerator  Test of data exchange between accelerator sections for the end to end simulations  Studies of beam instrumentation in decay rings

EUROnu Review: 14 th April 2011 Publications / Presentations......talks at various conferences (NUFACT, etc.....) 2 EURO Deliverables : C. Rogers and G. Prior, Review of the Neutrino Factory Muon Front End, Euronu Milestone Report, J. Pozimski, M. Aslaninejad, C. Bontoiu, J. Pasternak, D. Kelliher, H. Witte, Review of the Neutrino Factory Muon Accelerator, Euro Milestone Report, many publications for instance : ten at IPAC 2010 and a similar number for IPAC2011 in preparation [1] D. Neuffer, et al., Muon Capture in the Front End of the IDS Neutrino Factory, Proceedings IPAC'10 conference 2010 Kyoto, Japan, [2] A. Alekou et al., Alternative Muon Front-end for the International Design Study (IDS) Proceedings IPAC'10 conference 2010 Kyoto, Japan, [3] A. Alekou et al., Muon Cooling Performance in Various Neutrino Factory Cooling Cell Configurations using G4MICE, Proceedings IPAC'10 conference 2010 Kyoto, Japan [4] M. Aslaninejad et al., Solenoid Fringe Field Effects for the Neutrino Factory Linac - MAD- X Investigation, Proceedings IPAC'10 conference 2010 Kyoto, Japan

EUROnu Review: 14 th April 2011 Publications [5] C. Bontoiu et al. Beam Dynamics Studies for the First Muon Linac of the Neutrino Factory, Proceedings IPAC'10 conference 2010 Kyoto, Japan [6] J. Pasternak et al., Injection/Extraction System of the Muon FFAG for the Neutrino Factory, Proceedings IPAC'10 conference 2010 Kyoto, Japan [7] J. Pozimski et al., Investigation of Beam Loading Effects for the Neutrino Factory Muon Accelerator, Proceedings IPAC'10 conference 2010 Kyoto, Japan [8] M. Apollonio et al., Muon Polarimeter in a Neutrino Factory Decay Ring, Proceedings IPAC'10 conference 2010 Kyoto, Japan [9] G. P. ˇSkoro et al., Overview of Solid Target Studies for a Neutrino Factory, Proceedings IPAC'10 conference 2010 Kyoto, Japan [10] T. R. Edgecock et al., Tungsten Behavior at High Temperature and High Stress, Proceedings IPAC'10 conference 2010 Kyoto, Japan and the IDR (

EUROnu Review: 14 th April 2011 IDR Original Goals : Complete design of Neutrinofactory accelerator complex Produce cost estimate Achieved : Practically complete lattice design Redesign of target area identified (new design now available) Costing not ready for inclusion => increased effort since then

EUROnu Review: 14 th April 2011 Deliverable : Specification of proton-beam handling system J. Back Warwick

EUROnu Review: 14 th April 2011 Deliverable : Specification of proton-beam handling system

EUROnu Review: 14 th April 2011 Particle selection scheme new task identified (C. Rogers)

EUROnu Review: 14 th April 2011 Full-cell Length Pair of bucked coilsRF Absorbers Bucking coil cooling channel new solution identified (A. Aleku)

EUROnu Review: 14 th April 2011 Costing IDR delivers component list

EUROnu Review: 14 th April 2011 Preparing engineering layout for costing N. Bliss, STFC daresbury

EUROnu Review: 14 th April 2011 CERN costing tool now available Preparing the WBS for data A. Kurup, Imperial

EUROnu Review: 14 th April 2011 Summary IDR published Deliverables D5 & D6 submitted Good progress on all fields Goal of costing for IDR not yet reached. Risk mitigation and fall back options defined Next steps : Cost per element evaluation Re-evaluation of capture rate Handling of secondaries in the decay channel (chicane) Particle tracking (end to end)