WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.

Slides:



Advertisements
Similar presentations
New VOMS servers campaign GDB, 8 th Oct 2014 Maarten Litmaath IT/SDC.
Advertisements

OSG Area Coordinators Meeting Security Team Report Mine Altunay 01/29/2014.
WLCG Operations Coordination report Maria Dimou / CERN With input and on behalf of the WLCG Operations Coordination team May 2015 GDB CERN indico event.
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
Status of WLCG Tier-0 Maite Barroso, CERN-IT With input from T0 service managers Grid Deployment Board 9 April Apr-2014 Maite Barroso Lopez (at)
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP35, Liverpool 11 Sep 2015.
PanDA Multi-User Pilot Jobs Maxim Potekhin Brookhaven National Laboratory Open Science Grid WLCG GDB Meeting CERN March 11, 2009.
UK middleware deployment GridPP27 - CERN 15 th September 2011 GridPP27 - CERN 15 th September 2011 Status & plans Jeremy Coles.
MW Readiness Verification Status Andrea Manzi IT/SDC 21/01/ /01/15 2.
INFSO-RI Enabling Grids for E-sciencE SA1 and gLite: Test, Certification and Pre-production Nick Thackray SA1, CERN.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-EGI Grid Operations Transition Maite.
CERN11 th February WLCG Ops Coordination [GDB Report] Josep Flix (PIC/CIEMAT) On behalf of the WLCG Operations Coordination Team GDB – CERN.
MW Readiness WG Update Andrea Manzi Maria Dimou Lionel Cons 10/12/2014.
Information System Status and Evolution Maria Alandes Pradillo, CERN CERN IT Department, Grid Technology Group GDB 13 th June 2012.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Antonio Retico CERN, Geneva 19 Jan 2009 PPS in EGEEIII: Some Points.
Storage Accounting John Gordon, STFC GDB March 2013.
LCG Introduction John Gordon, STFC GDB June 8 th 2011.
Last update 29/01/ :01 LCG 1Maria Dimou- cern-it-gd Maria Dimou IT/GD CERN VOMS server deployment LCG Grid Deployment Board
WLCG Service Report ~~~ WLCG Management Board, 18 th September
SL5 Site Status GDB, September 2009 John Gordon. LCG SL5 Site Status ASGC T1 - will be finished before mid September. Actually the OS migration process.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
WLCG Operations Coordination Andrea Sciabà IT/SDC 10 th July 2013.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
CMS: T1 Disk/Tape separation Nicolò Magini, CERN IT/SDC Oliver Gutsche, FNAL November 11 th 2013.
The Grid Storage System Deployment Working Group 6 th February 2007 Flavia Donno IT/GD, CERN.
The GridPP DIRAC project DIRAC for non-LHC communities.
Placeholder ES 1 CERN IT EGI Technical Forum, Experiment Support group AAI usage, issues and wishes for WLCG Maarten Litmaath CERN.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
MW Readiness WG Update Andrea Manzi Maria Dimou Lionel Cons Maarten Litmaath On behalf of the WG participants GDB 09/09/2015.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE Operations: Evolution of the Role of.
WLCG Operations Coordination and Commissioning Maria Girone, CERN IT On behalf of the Operations Coordination Team 11 th March OSG All Hands Meeting,
WLCG Accounting Task Force Update Julia Andreeva CERN GDB, 8 th of June,
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Storage Accounting John Gordon, STFC OMB August 2013.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI GLUE 2: Deployment and Validation Stephen Burke egi.eu EGI OMB March 26 th.
WLCG Information System Status Maria Alandes Pradillo, CERN CERN IT Department, Support for Distributed Computing Group GDB 9 th September 2015.
WLCG Operations Coordination report Maria Dimou Andrea Sciabà IT/SDC On behalf of the WLCG Operations Coordination team GDB 12 th November 2014.
Maria Alandes Pradillo, CERN Training on GLUE 2 information validation EGI Technical Forum September 2013.
HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP33 Ambleside 22 Aug 2014.
EGI-InSPIRE RI EGI-InSPIRE RI EGI-InSPIRE Software provisioning and HTC Solution Peter Solagna Senior Operations Manager.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI IPv6 Report for HEPiX CERN October 5, 2012 CERN 1
GGUS summary ( 9 weeks ) VOUserTeamAlarmTotal ALICE2608 ATLAS CMS LHCb Totals
LCG Introduction John Gordon, STFC GDB December 7 th 2010.
Operations Coordination Team Maria Girone, CERN IT-ES GDB, 11 July 2012.
Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland t DBCF GT Middleware Update GDB, 9 th February 2011 Slides by Maria Alandes.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Middleware updates Peter Solagna – EGI.eu OMB – 16/07/ /3/
Daniele Bonacorsi Andrea Sciabà
WLCG IPv6 deployment strategy
OpenSSL and Java 7 vs. 512-bit proxy keys
EGI Operations Management Board
gLite->EMI2/UMD2 transition
WLCG Operations Coordination
John Gordon, STFC-RAL GDB 10 October 2007
Patricia Méndez Lorenzo ALICE Offline Week CERN, 13th July 2007
Savannah to Jira Migration
Update on SHA-2 and RFC proxy support
Olof Bärring LCG-LHCC Review, 22nd September 2008
Update from the HEPiX IPv6 WG
WLCG Accounting Task Force Update Julia Andreeva CERN WLCG Workshop 08
Short update on the latest gLite status
Summary from last MB “The MB agreed that a detailed deployment plan and a realistic time scale are required for deploying glexec with setuid mode at WLCG.
John Gordon, STFC GDB October 12th 2011
DPM releases and platforms status
EMI: dal Produttore al Consumatore
Monitoring of the infrastructure from the VO perspective
Leigh Grundhoefer Indiana University
IPv6 transition Vincenzo Spinoso EGI Operations.
Operations Officer, EGI
Introduction slides Peter Solagna – EGI.eu
EGEE Operation Tools and Procedures
IPv6 update Duncan Rand Imperial College London
Presentation transcript:

WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013

Outline  Status of task forces  News from EGI  Conclusions WLCG Operations Coordination – A. Sciabà 2

Middleware news  perfSONAR now tracked in baseline versions table  End of support for dCache was extended to September 30  Due to delay in releasing SHA-2 ready version  dCache (just released) is SHA-2 compliant  All sites should update their BDIIs to the latest version, including fixes for GLUE-2 and security WLCG Operations Coordination – A. Sciabà 3

gLExec  Tickets opened to sites  39 closed and verified  55 still open (but many on hold until mid/late autumn to unify with SL6 migration)  Some countries already done, in particular France  CMS will make the gLExec SAM test critical by late fall WLCG Operations Coordination – A. Sciabà 4

SHA-2  Will be covered in detail today by Peter  Just a few highlights  WLCG “deadline” extended to December 1 st  By then we expect users to be able to use SHA-2 certificates for their work  It should be compatible with measured state and progress  Validation status by experiment  ALICE: various software still to be checked  ATLAS and LHCb: all central services verified  CMS: all OK but for DBS-2 (soon to be decommissioned anyway), end-to-end job submission tests done  Need testing job submission with SHA-2 certificates for pilots  VOMRS → VOMS-Admin migration  IT to deploy VOMS-Admin servers for the VO managers to test  Migration will be fully automated  In the worst case, VOMRS can still be used if users authenticate with it using a SHA-1 certificate and register DN and CA of their new SHA-2 certificate WLCG Operations Coordination – A. Sciabà 5

CVMFS  Patch released with security fix, sites should upgrade or apply hot fix  ALICE  33/51 sites deployed it, the rest by this fall: excellent progress!  CMS  Using gLite UI from CVMFS for Parrot  Only ~10 CMS sites remaining!  New “CVMFS” SU in GGUS under “File System” 10 July 2013 WLCG Operations Coordination – A. Sciabà 6

FTS-3  ATLAS, CMS and LHCb using FTS3 for functional tests or production transfers  Up to 30% of ATLAS production transfers  Using CERN (Oracle, MySQL) and RAL (MySQL) instances  Instances at PIC, IN2P3-CC and ASGC not yet used  Some bugs found under load and fixed  Overall, very impressive results 10 July 2013 WLCG Operations Coordination – A. Sciabà 7

Tracking tools evolution  Savannah-to-JIRA migration  Completed migration for some ALICE and LHCb trackers  ATLAS wrote the list of projects to migrate  Meetings in October to discuss various issues  Savannah→JIRA for experiments and for the GGUS tacker  New GGUS functionality (e.g. tickets to multiple sites)  Savannah→GGUS for CMS 10 July 2013 WLCG Operations Coordination – A. Sciabà 8

Middleware readiness verification  Basically consisting in testing middleware and service updates on O(10) volunteering sites on a fraction of their production resources by running real workflows  Extends staged rollout using WLCG use cases  Membership (and coordinators) to be defined  Start from the “old” middleware deployment TF? 10 July 2013 WLCG Operations Coordination – A. Sciabà 9

News from EGI operations  At the EGI Technical Forum (16-20/9) there will be training for site admins  Including how to correctly publish information in GLUE-2  Discussion started on the opportunity to include Frontier/Squid in UMD  It implies staged rollout, early adopters, etc.  To be seen how many sites would find it more convenient. Feedback? 10 July 2013 WLCG Operations Coordination – A. Sciabà 10

Conclusions  Several task forces and activities on a very good track  Progress measured by numbers of sites/tickets  Machine/job features TF fully set up, ready to start  Middleware readiness verification TF still to set up  Next WLCG Operations Coordination meeting on 19 th September 10 July 2013 WLCG Operations Coordination – A. Sciabà 11