Building for Learning Project Photo Progress Report September 2010 Project commencement 21 st September 2009.

Slides:



Advertisements
Similar presentations
Computer Lab Expectations
Advertisements

Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
The Story of Gorstycroft Its September 2004, and we need to buy a new house! Lets have a look at a few brochures…
Building for Learning Project Photo Progress Report 4 November 2009 – December 2009 Project commencement 21 st September 2009.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Building for Learning Project Photo Progress Report December 2009 Project commencement 21 st September 2009.
St Mary’s Church Hall Project Cutting the First Sod Architect, David Nobes and District Councillor, Ken Carter on Monday 23 rd September.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Update on FCPS Construction/Renovation Projects August 2009.
N EXISTING FACILITIES BUILDING “A” -Principal’s Office -Workroom -(9) 3 RD Grade Classrooms - (4) 4 TH Grade Classrooms -Life Skills Classroom -Title.
1 st Place Post-Secondary Winner. 2 nd Place Post-Secondary Winner.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
2 Existing building 1 story metal 1972 Water Street CFA TechWorks! - Site Plan - Photo Index Number indicates photographer location Caption describes.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Arpeggio Fingerpicking
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
GATEWAY CENTER SPACE UTILIZATION STUDY September 17, 2007.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
Multiplying matrices An animated example. (3 x 3)x (3 x 2)= (3 x 2) These must be the same, otherwise multiplication cannot be done Is multiplication.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Figure 3.1.: Photo of the Circored Plant. ~ 160 m Iron Ore Fines CFB Preheater Inclined Bucket Elevator 1st Stage CFB Reactor 2nd Stage FB Reactor Briquetting.
The West London Free School Palingswick House Update.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Building for Learning Project Photo Progress Report 6 February 2010– March 2010 Project commencement 21 st September 2009.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Building for Learning Project Photo Progress Report Month of May 2010 Project commencement 21 st September 2009.
Current Floor Plan N. Marking C1 indicates that a load bearing steal beam is present at each end of the existing exterior wall which both need to stay.
Conductors and Insulators
Structural Engineering and Earthquake Simulation Laboratory 1 Task 1 (1g Tests) Experimental and Micromechanical Computational Study of Pile Foundations.
Wilson Thapa. Interests Photo Credits
computer
Falcon Time Monday, September 14, Agenda Notebook (Spiral) Purpose: to keep all Falcons organized! In EVERY class, you will write: – Essential Question.
Building for Learning Project Photo Progress Report Month of May 2010 Project commencement 21 st September 2009.
Facilities Modernization Program Funded by Measure B Project Report September 21, 2015.
Major projects carried out by Design cell ( July 2015 ) 12/22/20151Design cell IIT,Bombay Aug 2015.
Missoula County Space Needs Plan Planning Logistics Phasing Plan Schematic Designs Questions.
Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.
1 July 13, 2011 Some morning photos Tank Valve Box.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
2 nd phase I.Classrooms, toilets, dinning hall, computer rooms and library for the primary students II.Expansion of the high school library and relocate.
A series of refurbishment and alteration projects leading to the vacating of most of level 3P and some of level 2P to allow the opening of the new College.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
 Life Expectancy is 180 th in the World.  Literacy Rate is 4 th in Africa.
st significant figure Significant figures Significant figures 1 st significant figure.
CITY COUNCIL OCTOBER 18, 2011 Central Park Gazebo Replacement.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
$200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200.
OTE Building PMG Report September 10, 2012 Rhonda Merchut 1.
Pensacola Bay Bridge Replacement Design Build
Arithmetic and Geometric Means
Sept. 18th -22nd Grandparents Day Lunch Wednesday 11:00
Clydebank Town Centre Office.
Minuteman Vocational Technical Regional High School Progress
Applying Determinants to solve Systems of Equations 2x2 & 3x3
Phone Number BINGO!!!.
Surname 99 NOTES: Point of View
As needed for progress monitoring
Progression of Text Levels Expected in Grades 1 - 5
4n + 2 1st term = 4 × = 6 2nd term = 4 × = 10 3rd term
RUGBY WORLD CUP START SEPTEMBER 18th
High Frequency Words The First 100
Around the room Orders of operations.
Lon-Capa 3rd HW assignment due today 5 pm. 2nd Quiz due today by10 pm.
How to find the nth rule for a linear sequence
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
Drill of the Flight COLUMN LEFT
Facilities Update Garden Grove Unified School District
SEPTEMBER 2019 ISSUE/42 nd VOLUME.
Presentation transcript:

Building for Learning Project Photo Progress Report September 2010 Project commencement 21 st September 2009

Furniture removal and storage ready for refurbishment works 21 st Sept 2009

Erecting scaffolding before roof replacement part of refurbishment works 22 nd Sept 2009

Chimney removal (Murphy’s) part of roof replacement Refurbishment works 23 rd Sept 2009

Project Manager Graeme Connelly, Architect Lindsey Jordan and Structural Engineer Mark – steel column design Sept 23 rd, 2009

Heater replacements in rooms 1-5 part of refurbishment works 24 th Sept 2009

New roof going up (over Room 1) 25 th Sept 2009

Student Computer Lab relocation ready for Room 6-9 demolition 28 th Sept 2009

New roof going up (over room 2) 28 th Sept 2009

New roof going up (over room 3) 29 th Sept 2009

Electrics being made ready for refurbishments 29 th Sept 2009 Denis – In Touch Computing making ready for Admin move to Room 3 for refurbishment works 30 th Sept 09

The thumbs up from WorkSafe Inspector Terry Wilson on our building works (the biscuits helped to sweeten him up!) – 29 th Sept 2009