Customer Charge On behalf of all DNs 19 November 2010.

Slides:



Advertisements
Similar presentations
PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
Advertisements

Review of industry code governance 26 March 2010.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
A layman’s guide to the structure of LDZ gas charges 27 July 2009 Please note – in the interests of clarity and accessibility, simplifications have been.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
LDZ System Charges – Structure Methodology 26 April 2010.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
Customer Charge On behalf of all DNs 25 October 2010.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
Industry Dialogue on xoserve Services 14 th September 2007.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
IGT and Shipper Workgroup meeting 28 th February 2011.
Background Current balance of LDZ System and Customer charges
Presentation to the BSC Panel
Consideration of issues raised by UNC Modification Proposal 0244
Modification Proposal 0283 Update
Presentation to the BSC Panel
Distribution Workgroup 24/11/16
EU Implementation Programme
User Pays Funding – Potential Licence Mechanism
Code Governance Review UNC Modification Proposals
Grid Code Review Panel 16th August 2017
Mod 186 Report Assumptions for 2013 DCMF 26 January 2009
Mod 0621 Amendments to Gas Transmission Charging Regime
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
LDZ System Charges – Structure Methodology 26 July 2010
NTS Entry Charging Review Update
DSC ChMC CSS update 7th November 2018
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
CSS Update for CoMC 19th September 2018
UNC 0621L: Amendments to Gas Transmission Charging Regime
Draft Capacity & Connection Plan
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Rebecca Hailes For 15 March 2018
Joint Office Presentation for Modification 0678
QSEC auction timetable
Mod 0621 Amendments to Gas Transmission Charging Regime
Long Term Non Firm Capacity Update
Mod Proposal 0268 : AQ Backstop Date
Proposed Changes to UNC Section O
UNC 0621L: Amendments to Gas Transmission Charging Regime
Options for the Development of a Demand Side Response Mechanism
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Proposer: Debbie Brace Panel Date: 20th March 2014
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
UIG Task Force Progress Report
Modification Proposal 136
UIG Task Force Progress Report
UIG Task Force Progress Report
Introduction We hope that this webinar will provide you with the information you need to understand the DCUSA by covering the following:   What is the.
Presentation transcript:

Customer Charge On behalf of all DNs 19 November 2010

Customer Charge Background ______________________________________________________________________________________________________________________________ Originally determined by Transco Designed to recover particular costs, mainly relating to provision of emergency services, and the repair, maintenance, replacement and depreciation of service pipes funded by transporter Generate ~30% of Collected Revenue Over 90% is collected from SSPs (c.£30/SSP annually)

The current Customer Charge ______________________________________________________________________________________________________________________________ SPs with AQ > 732MWh operate on a capacity based power function SPs with AQ between 73.2MWh and 732MWh operate on a linear capacity based function and an additional per supply point function. SPs with an AQ of less than 73.2MWh operate on a linear capacity based function. All current DN charges are based on these original National basis charging structures

Why change? ______________________________________________________________________________________________________________________________ The Customer Charge has not been fundamentally reviewed since the original charge was determined by Transco/Ofgas Ofgem report “Conclusions on the review of the structure of has distribution charges” – costs underlying the Customer Charge should be reviewed DNs required to ensure charges are cost reflective Need to rebase charges on a network rather than national specific basis

Recent activity ______________________________________________________________________________________________________________________________ Final areas of methodology in the 2006 Ofgem report Relevant costs identified in PC05 DNs seeking to consult on this area to enable potential change at April 2012 in line with other planned changes DNs wish to engage input and opinion from shippers at special DCMFs (19 th November & 17 th December)

Potential timeline ______________________________________________________________________________________________________________________________ DateActionGovernance November 2010Consult and engage with shippers at special DCMF Receive feedback and further ideas, to enable development of UNC Modifications Existing DCMF December 2010DNs develop Modifications and circulate in draft for comment/discussion at DCMF Existing DCMF 2 January 2011DNs and/or shippers issue Modifications to JO for inclusion at next Modification Panel, recommending issue for consultation UNC 20 January 2011Modification Panel decides pathway:  Workgroup  Consultation (15 WD) UNC 11 February 2011Final date for representationsUNC 17 February 2011FMR not ready for 5 days in advance due to close out dateUNC 17 March 2011Modification Panel votes on recommendationUNC After Ofgem decisionJO update UNC with legal text if it includes transitional arrangementsUNC 1 April 2012Implementation DateUNC

Costs underlying the Customer Charge ______________________________________________________________________________________________________________________________ Emergency costs All costs associated with emergencies on service pipes and supply points Service pipe costs Pipe replacement costs and depreciation Indirect costs Allocation of support and employee overheads

Potential Customer Charge methodology ______________________________________________________________________________________________________________________________ A single fixed daily charge per supply point for each network A two-rate fixed daily charge for SSPs and LSPs for each network A derived capacity charge No change Another method

Potential Customer Charge methodology ______________________________________________________________________________________________________________________________ A single fixed daily charge per supply point for each network Emergency costs show no strong correlation with supply point size No increased likelihood that a larger supply point will have a gas emergency No significant difference in cost to deal with an emergency at a large supply point than at a small one Simplest possible charging outcome

Potential Customer Charge methodology ______________________________________________________________________________________________________________________________ A two-rate fixed daily charge for SSPs and LSPs for each network Service pipes can be divided into domestic and non- domestic supply point related costs, broadly corresponding to 73.2MWh (LSP) “10 metre allowance” element of service depreciation allocated across domestic supply points only or allocated across all supply points

Next steps ______________________________________________________________________________________________________________________________ Views of Shippers and others sought on: Likely shipper implementation impacts and timescales for either of the two options Other options for the structure of the customer charge which should be considered Pros & Cons of aligning a change to the customer charge structure with other planned changes for April 2012 Other implementation issues Other Questions / Discussion Points / Feedback Next DCMF – 15 th December 2010