FWD Meeting, Torino, June 16th, 20091 News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.

Slides:



Advertisements
Similar presentations
Poster Design & Printing by Genigraphics ® In the PANDA experiment, the Straw Tube Tracker (Fig. 1) designed for momentum analysis of charged.
Advertisements

Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
24-Apr-15S.Movchan Straw prototype beam test into the NA48 infrastructure 1 Goals: test of straw prototype wires positioning straw bending check grounding.
08 September 2009 A.Kashchuk INFN-Ferrara and PNPI-St.Petersburg 1 A.Kashchuk
E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
1 VCI, Werner Riegler RPCs and Wire Chambers for the LHCb Muon System  Overview  Principles  Performance Comparison: Timing, Efficiency,
D. Peterson, “ILC Detector Work”, Cornell Group Meeting, 4-October ILC Detector Work This project is supported by the US National Science Foundation.
Time Projection Chamber for the R 3 B set-up Combination of detectors upstream (target) & downstream of the magnet  Improvement of A, Z & E * balances.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
1 Status of the Test System of the MWPC for the LHCb Muon System Andre’ Massafferri (Universita’ Tor Vergata – INFN sezione II - Roma) V. Bocci, R. Nobrega.
Straw spatial resolution (beam test 2007 and 2008) A.Zinchenko, S.Shkarovskiy.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
TPC R&D status in Japan T. Isobe, H. Hamagaki, K. Ozawa, and M. Inuzuka Center for Nuclear Study, University of Tokyo Contents 1.Development of a prototype.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
RAL Muon Beam Line Properties. ISIS 70 MeV H- injection Ring accelerates up to 800 MeV in about 10 ms 50 Hz cycle - Dual Harmonic System ~ 2 x 1.5 MHz;
Preliminary results of a detailed study on the discharge probability for a triple-GEM detector at PSI G. Bencivenni, A. Cardini, P. de Simone, F. Murtas.
Anatoli Romaniouk TRT Introduction TRT in ATLAS p. 2-4TRT in ATLAS p. 2-4 TRT design p. 5-7TRT design p. 5-7 TRT operation principles p. 8-9TRT operation.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
A TPC for ILC CEA/Irfu, Apero, D S Bhattacharya, 19th June Deb Sankar Bhattacharya D.Attie, P.Colas, S. Ganjour,
PNPI, R&D MUCH related activity ● Segmentation ● Simulation of the neutral background influence ● R&D of the detectors for MUCH ● Preparation to the beam.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
The BoNuS Detector: A Radial Time Projection Chamber for tracking Spectator Protons Howard Fenker, Jefferson Lab This work was partially supported by DOE.
LHCb Muon System TDR Outline: Introduction –Physics requirements –Background conditions Overview of the Muon System Physics Performance –L0 muon trigger.
29-Feb-16S.Movchan Straw status1 Choose of FEE chip for NA62 straw detector Beam tests results 2007 and 2008 (Straw spatial resolution) Comparison FEE.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
1 9 December 2002A.P.Kashchuk (LNF/INFN), Frascati) New approach to CPC design.
Drift Chamber Review Jefferson Lab 6-8 March 2007 CLAS12 Drift Chamber Electronics R. Chris Cuevas Group Leader -- Fast Electronics Jefferson Lab Physics.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
Performances of a GEM-based TPC prototype for the AMADEUS experiment Outline: GEM-TPC in AMADEUS experiment; Prototype design & construction; GEM: principle.
BMBF-JINR PANDA Meeting, Dubna, November 15, 2013 G.Alexeev (for muon group) Status of Project and Related Topics * Report to the Muon Review Panel ( CERN,
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Mitglied der Helmholtz-Gemeinschaft Hit Reconstruction for the Luminosity Monitor March 3 rd 2009 | T. Randriamalala, J. Ritman and T. Stockmanns.
H.-G. Moser Max-Planck-Institut fuer Physik DEPFET Meeting Heidelberg Sept DEPFET Geometry for SuperBelle Sensor Geometry Pixel Pitch Constant/variable.
STT Detector risk’s assessment. STT detector work packages Straw Tubes modules Straw Tracker mechanics Front-End Electronics Analog electronics Digital.
1 straw tube signal simulation A. Rotondi PANDA meeting, Stockolm 15 June 2010.
Prospect of SiPM application to TOF in PANDA
Status of the forward tracker design
News from Cracow on the forward tracking
We started last December: 32 channels prototype “Julich like” to:
Calorimeter Mu2e Development electronics Front-end Review
S.Movchan Straw prototype beam test into the NA48 infrastructure
Present Read Out Chain for the PANDA Barrel DIRC
Dubna/JINR Status & Plans
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
IHEP group Shashlyk activity towards TDR
PADI for straw tube readout and diamonds for MIPs and for high precision tracking beam test – Jülich, Feb Jerzy Pietraszko, Michael Träger, Mircea.
News on second coordinate readout
A Fast Binary Front - End using a Novel Current-Mode Technique
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
Status of the CARIOCA project
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Pre-installation Tests of the LHCb Muon Chambers
Engineering Design Review
Presentation transcript:

FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers Tests of prototype module Simulations with GARFIELD and PANDAroot Geometry of the tracking stations New design of end-plugs

2 Charge injector Q = V/56 x 1.2 pF TF = ~600ns TR = 1ns f = 1 kHz (V=100 mV  Q=2.1 fC) C=1.2 pF V R 50 V/56 Cdet

3 CARIOCA threshold characteristics discr. threshold = 820 mV, C det = 0 pF 180 mV  3.9 fC ±20 mV  ±0.4 fC

4 CARIOCA - charge vs discr. threshold CARIOCA amplification depends strongly on the detector capacitance

5 New PCB Discrimination threshold and test pulses controlled remotely

6 LUMICAL threshold characteristics Output pulses with 1 fC injected

7 module on stand gas connection preamp. connection New 4-layers PCB with 2 grounding layers horizontal bar to assure planarity of the module Straw module bends in the direction perpendicular to active area – mechanical element to assure planarity might be needed Effect of preamp. oscillations reduced

8 Straw HV characteristics with CARIOCA 55 Fe lowest possible threshold with no oscillations = 880 mV  ~10 fC Vthr= 880 mV 60 Co Working voltage of ~1800 V might be sufficient for tracking of charged particles

9 Straw electrical properties Z det ( ; >50 MHz)   L/C = 373 

10 FEE connection to detector CARIOCA ? ?

11 Termination of straws R2 =  Ω (resistor removed) R1 = 370 Ω R1 = 0 Ω R2 = 370 Ω Termination not needed (tests with CARIOCA discr. threshold = 880 mV)

12 HV characteristics with LUMICAL Minimal working voltage corresponding to 100% efficiency for 55 Fe was by about 100 V smaller with LUMICAL than with CARIOCA Lower (< 10 fC) threshold settings were not possible due to problem with ringing

13 Effect of „double threshold crossing” Long pulse tail + ringing  additional discriminator response

14 Gas gain gain= I / (N*Q) Current I and counts N measured with 55 Fe (primary charge Q ≈ 220 e)

15 Time over threshold measurement - simulations with GARFIELD 0.8 GeV/c proton Ar-CO2 (90:10) at 2 bar, HV=1500 V discr. threshold Transfer function 20·t·exp(-20·t), t[μs]

16 Time over threshold spectra one strawaverage from 20 straws 0.8 GeV/c protons 0.8 GeV/c pions 6 σ separation

17 Forward tracking simulations - choice of wire inclination Particles: 0.5 GeV/c muons Dipole magnet setting: for 7.8 GeV/c beam 5 deg. inclination chosen

18 Definition of local coordinate system for straw module y’ = 0 is a symmetry plane of the module - it lies in the middle of length of the module Position of the module center (x’=y’=z’=0) is given in the PANDA reference frame (x,y,x) with the origin in the target point For all modules z’ is parallel to z Module inclination angle  is the angle between y and y’; right handed rotation around z corresponds to positive angles Straw length l is by 2 cm longer than the expected sensitive length of straws (it takes into account end plugs (0.8 cm cm) and area of distorted electric field (0.2 cm +0.2 cm)

19 Inclination, coordinates and length of straw modules

20 Active areas Total number of modules: 336 Total number of straw tubes: 336 x 32 = Tracking station 1, 2

21 Openings for beam pipe Tracking station beam pipe  proposed opening x-y 1, mm 110x110 mm 2 3, 4 96 mm 104x104 mm 2 5, mm 166x166 mm 2

22 Space available for frames of tracking stations inside the dipole magnet gap

23 Tracking stations inside the dipole magnet gap double layer 12341’2’3’4’ preamp. card support frame

24 Proposed end-plugs (option without springs) no springs; grounding of straws by direct gluing to conductive pads no plastic pipes for gas; steel pipes connecting straw volumes with gas distribution channels gas gas tube gas channel print for grounding straws plastic socket brass socket crimp pin centering ring

25 Gas distribution gas inlet gas outlet distribution channel collecting channel

26 Backup slides

27 Alternative solution - application of springs at one end of straws space for spring

28 Quality control (single straws) Wire tension (frequency = nominal ±10%) Isolation (current < ~1nA at 1500 V)

29 Quality control (modules) Gas tightness (pressure drop in time) HV characteristics with 55 Fe (steepness of the slope (noise) and width of the plateau) Position of the sense wire and of the straw (x-ray measurements)