Capping Local RA Requirements at System RA Requirements February 9, 2015 Karl Meeusen California ISO.

Slides:



Advertisements
Similar presentations
NAESB Strawman January 24-25, Problem Statement Enough generators must have fuel to meet peak load New England Cold Snap crisis heightened interest.
Advertisements

1 WHY WE NEED AN ICAP MARKET IN NEW ENGLAND Presentation By: Dr. Richard A. Rosen Tellus Institute Boston, MA To: Massachusetts Electric Restructuring.
Procurement and Resource Adequacy Briefing August 2, 2006 Molly Sterkel, California Public Utilities Commission.
Out of Region Market Assumptions Resource Adequacy Technical Committee April 6 th, 2011.
R RA Phase II Proposals Workshop (day 2) January 25, 2011 Court Yard room 10:00 am- 2:45 pm.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
Overview of Loss of Load Expectation (LOLE) and Unforced Capacity (UCAP) Dan Huffman FirstEnergy Solutions November 20, 2007 OMS Board Workshop Resource.
Status Report: Resource Adequacy (RA) and Long Term Procurement Planning (LTPP) CPUC Energy Division Molly Tirpak Sterkel cpuc.ca.gov; Tel:
1 Resource Adequacy (RA) Workshop Presentation by: Sue Mara On Behalf of: Alliance for Retail Energy Markets (AReM) January 18, 2011.
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
© 2010 Day Pitney LLP NEPOOL GENERATION INFORMATION SYSTEM Paul N. Belval Day Pitney LLP January 2011.
1 RELIABILITY AND COMPETITIVE ELECTRICITY MARKETS POWER Research Conference UC Berkeley March 19, 2004 Paul Joskow MIT, CEEPR, CMI and Jean Tirole IDEI,
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
Resource Adequacy Forecast Adjustment(s) Allocation Methodology
1 RELIABILITY AND COMPETITIVE ELECTRICITY MARKETS POWER Research Conference UC Berkeley March 19, 2004 Paul Joskow MIT, CEEPR, CMI and Jean Tirole IDEI,
A Capacity Market that Makes Sense Peter Cramton & Steven Stoft 18 March 2005.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Draft SAWG/RAWG Agenda Survey A Presentation to the MISO Supply Adequacy Working Group by the OMS Resource Adequacy Working Group August 16, 2004.
Demand Response in Midwest ISO Markets February 17, 2008.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
THE PJM INTERCONNECTION STATE OF THE MARKET REPORT 2001 Joseph E. Bowring Manager PJM Market Monitoring Unit Federal Energy Regulatory Commission June.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
George A. Godding, Jr. Director, Management and Communications Office of Market Oversight and Investigations Comments are the speakers and do not necessarily.
Overview of the Capacity Markets in the United States 2008 APEX Conference in Sydney, Australia October 13-14, 2008 Hung-po Chao Director, Market Strategy.
1 Demand Response in Midwest ISO Markets 09 February 2007.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Tony Braun Bruce McLaughlin Braun & Blaising, P.C APPA Legal Seminar October 9, 2006 Resource Adequacy California Style An Overview and Examination of.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
EPA Cooling System Regulations Hall of States Briefing February 22, 2011.
Reliability Demand Response Product February 25, 2011
Benefits of a Multi-year Resource Adequacy Program May 20, 2014 Karl Meeusen, Ph.D., Market Design and Regulatory Policy Lead Market and Infrastructure.
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Review of CAISO Wholesale Electricity Market Trends APEX Sydney Conference California Electricity Wholesale Market Trends October 13, 2008 Anjali Sheffrin,
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Demand Response as Capacity in New York National Association of Regulatory Utility Commissioners Winter Committee Meetings Washington, DC February 17,
Measurement & Verification at the Wholesale Market Level David Kathan FERC NAESB DSM/EE Business Practices Washington, DC April 11, 2007 The author’s views.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
Peter Larsen and J.P. Carvallo Lawrence Berkeley National Laboratory Data Working Group ■ August 4, 2015.
Economic, Social and Environmental Benefits Better Planning and Operational Decisions in Water Management Decision Making Capacity and Institutions; Stakeholder.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Emergency Demand Response Concept Overview and Examples Presented to: ERCOT December 3, 2004 Presented by: Neenan Associates.
OPSI Annual Meeting October 13, Session 6 Reliability Pricing Model: Are Further Changes Necessary? Reluctantly…yes But States should also be.
© 2015 McNees Wallace & Nurick LLC OPSI Annual Meeting October 13, 2015 Session 6 – Reliability Pricing Model: Are Further Changes Necessary?
California’s Summer Outlook and Emerging Electricity Issues Dave Ashuckian, P.E., Manager Electricity Analysis Office Irwindale Energy Forum February 15,
OPSI Annual Meeting October 8 th Should all capacity resources be paid the same? -Demand Response operational deployment.
The RGGI Auction Allocation Process: Concerns and Recommendations Presented by James H. Savitt, Ph.D To The RFF Auction Workshop in NYC 20 July 2006.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
RA workshop presentation Karl Meeusen, Ph.D. Senior Advisor – Infrastructure Policy CPUC Resource Adequacy Workshop February 18, 2016.
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
1 PG&E Proposals for Refinements to the Resource Adequacy (RA) Program Compliance Year 2017 RA Workshop February 18, 2016.
Resource Adequacy Coincident Adjustment Factor Methodology Miguel Cerrutti Demand Analysis Office Energy Assessments Division R Workshop California.
Electricity Outlook: Summer of 2005 and Beyond." Before the Senate Energy, Utilities and Communications Committee February 22, 2005 Steve Larson Executive.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
ERS Procurement Methodology
Fundamental Supply Factors Driving Current Market Prices
ColumbiaGrid Summary of: COI Utilization Report dated May 4, 2011
December 9, 2005 Allison DiGrande, External Affairs Department, ISO/NE
Rates & Regulatory Updates
Out of Region Market Assumptions
Resource Adequacy Demand Forecast Coincidence Adjustments
ICAP Issues Massachusetts Roundtable February 16, 2001
Presentation transcript:

Capping Local RA Requirements at System RA Requirements February 9, 2015 Karl Meeusen California ISO

ISO proposes to cap the local RA requirement at the system requirement Addresses replacement requirement concerns for LSE’s with a local capacity requirement greater than a system capacity requirement –Local resource on planned outages are also automatically considered system resources and maybe subject to replacement requirement for the outage –The additional capacity offers limited additional local reliability benefits Consistent with proposal made by ISO in the Reliability Services stakeholder initiative Page 2

Benefits of the ISO proposal Prevents other load serving entities from taking outages and leaning on the over-committed capacity Due to ISO replacement rule, the LSE may be required to replace an outage resulting in the LSE’s total capacity in aggregate to be beyond the load serving entity’s peak demand and reserve margin requirement Page 3

Local requirement capped at the system requirement in monthly and annual showings Page 4