CPUC Resource Adequacy Program – LAO briefing May 25, 2009.

Slides:



Advertisements
Similar presentations
Procurement and Resource Adequacy Briefing August 2, 2006 Molly Sterkel, California Public Utilities Commission.
Advertisements

R RA Phase II Proposals Workshop (day 2) January 25, 2011 Court Yard room 10:00 am- 2:45 pm.
Cost of Services Pricing Enables a Net Zero Energy World © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
California Energy Action Plan Joint Public Meeting Electricity System Reliability Activities California Energy Commission July 17, 2003.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
Status Report: Resource Adequacy (RA) and Long Term Procurement Planning (LTPP) CPUC Energy Division Molly Tirpak Sterkel cpuc.ca.gov; Tel:
1 Resource Adequacy (RA) Workshop Presentation by: Sue Mara On Behalf of: Alliance for Retail Energy Markets (AReM) January 18, 2011.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
LOCAL REGULATION AND CLIMATE CHANGE QUICK TELECONFERENCE American Bar Association Section of Environment, Energy, and Resources Climate Change, Sustainable.
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
Resource Adequacy Forecast Adjustment(s) Allocation Methodology
Energy and Electricity Markets 101
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Energy Storage R Energy Storage Procurement & Policy Options Arthur O’Donnell/Aloke Gupta/Elizaveta Malashenko Energy Division Grid Planning.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Laura Doll Deputy Executive Director, CPUC October 18, 2006 Platt’s CA Power Market Forum C ALIFORNIA P UBLIC U TILITIES C OMMISSION Fulfilling Resource.
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
California’s Renewable Energy Credits (REC) Market Update
July 9, 2010, AB 920 Workshop Pacific Gas and Electric Company.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
CALIFORNIA ENERGY COMMISSION. California Perspective on Real Time Pricing Michael R. Jaske, Ph.D. California Energy Commission Committee on Regional Electric.
Tony Braun Bruce McLaughlin Braun & Blaising, P.C APPA Legal Seminar October 9, 2006 Resource Adequacy California Style An Overview and Examination of.
Refinements to CAM-Related Reliability Cost and Capacity Allocation Processes Jeremy Waen Regulatory Analyst| Marin Clean Energy February 2015.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
Resource Adequacy for Distributed Generation January 27, :15 am to 12 noon Energy Division staff discussion Megha Lakhchaura.
1 Monitoring Potential Emissions Leakage under the Regional Greenhouse Gas Initiative (RGGI): Possible Lessons for Load-Based Cap-and-Trade Programs Christopher.
Review of CAISO Wholesale Electricity Market Trends APEX Sydney Conference California Electricity Wholesale Market Trends October 13, 2008 Anjali Sheffrin,
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Resource Adequacy Steering Committee Meeting October 4, 2011.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Utility Procurement: What’s Next? IEP 2015 Annual Conference
An Overview of Demand Response in California July 2011.
1 California Energy Commission April 27, 2015 Valerie Winn Chief, State Agency Relations Contingency Planning and Diablo Canyon Power Plant.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
CEC Load Management Standards Workshop March 3, Update on the CPUC’s Demand Response and Advanced Metering Proceedings Bruce Kaneshiro Energy Division.
Renewables Portfolio Standard Status Report California Public Utilities Commission February 26 th, 2008.
Overview: California Renewables Portfolio Standard (RPS) Program Presented by Paul Douglas RPS Program Manager California Public Utilities.
1 R Workshop on 2016 RA proposals Energy Division Staff Procurement Oversight and Resource Adequacy California Public Utilities Commission Thursday,
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
April 5, 2016 CPUC. JDRP Proposal  Flexible RA Attributes and requirements should be unbundled from the underlying system RA and Local RA attributes.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
1 PG&E Proposals for Refinements to the Resource Adequacy (RA) Program Compliance Year 2017 RA Workshop February 18, 2016.
Resource Adequacy Coincident Adjustment Factor Methodology Miguel Cerrutti Demand Analysis Office Energy Assessments Division R Workshop California.
Electricity Outlook: Summer of 2005 and Beyond." Before the Senate Energy, Utilities and Communications Committee February 22, 2005 Steve Larson Executive.
Capping Local RA Requirements at System RA Requirements February 9, 2015 Karl Meeusen California ISO.
Overview of SB 350 California Public Utilities Commission Melicia Charles, Energy Division February 23,
May 9 th, 2016 California Public Utilities Commission Power Charge Indifference Adjustment (PCIA) Workshop.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
LNBA Subgroup: Avoided Transmission Value
Asia-Pacific Energy Regulatory Forum
Mike Jaske California Energy Commission
Resource Adequacy Demand Forecast Coincidence Adjustments
Combined Heat and Power Program Settlement
Independent Energy Producers 2019 Annual Meeting
Resource Adequacy Central Procurement Entity (CPE)
Presentation transcript:

CPUC Resource Adequacy Program – LAO briefing May 25, 2009

Public Utilities Code Section 380 (a) The commission, in consultation with the Independent System Operator, shall establish resource adequacy requirements for all load-serving entities. (b) …objectives: (1) Facilitate development of new generating capacity and retention of existing generating capacity that is economic and needed. (2) Equitably allocate the cost of generating capacity and prevent the shifting of costs between customer classes. (3) Minimize enforcement requirements and costs. (h) The commission shall determine and authorize the most efficient and equitable means of achieving…the objectives…

CPUC Jurisdiction The CPUC regulates privately owned electric companies operating in California. Currently there are 3 major Investor Owned Utilities (IOUs) and 9 Energy Service Providers (ESPs) providing retail service in the CAISO control area; there are currently 0 operating Community Choice Aggregators CPUC regulated entities represent about 90% of the CAISO peak load and energy use.

Procedural History Rulemaking and –D refined rules for counting generation capacity and established System Resource Adequacy program (year ahead and month ahead filings) –D and D established the Local Resource Adequacy program and adopted Local RA for 2007 and 2008 RA year. Rulemaking R –D adopted Local RA obligations for 2009 RA compliance –PD on agenda for June meeting refines counting rules for intermittent resources and adopts Local RA for 2010 year

System Resource Adequacy Requirement (RAR) RAR is calculated using an LSE’s forecast load by month, plus a reserve margin of 15%, for a total of 115% of forecast load. LSE forecast load is based on a 1 in 2 (50% probability) year and baselined against the CEC forecast. LSEs file their historical actual and forecast load and the CEC performs plausibility and coincidence adjustment. LSEs must demonstrate procurement of 90% RAR year ahead and 100% RAR month ahead

Local Resource Adequacy CAISO annually performs a Local Capacity Technical Analysis (also called the LCR study) that identifies and determines capacity obligations for 10 Local Areas in California that require in-area generation to meet peak loads reliably. Study is performed on extreme high peak (10% probability) load event Study provides Commission with 2 reliability options – NERC level B or NERC level C based on minimum operating criteria

What is the Resource Adequacy Obligation Contractual Obligation on Suppliers to: –Be scheduled into MRTU by the LSE –Bid into day-ahead market if not scheduled –Be subject to CAISO Residual Unit Commitment process at a $0 bid –Be available to real-time to the extent able –Abide by CAISO RA tariff section 40. –Performance and availability penalties discussed in PD

What counts toward RAR Generating plants listed on CAISO list by ID, name, Net Qualifying Capacity (NQC) and location Generating plants are purchased by LSEs in California RAR is a capacity requirement, not energy. Import resources our of the CAISO count based on an allocation of import capacity into CAISO. Dispatchable Demand Response programs paid by the public use charge are allocated to all LSEs RMR and CAM capacity allocated to LSEs pursuant to CPUC counting rules. DWR contracts count for their life. Intermittent (e.g. wind, solar, cogeneration) and energy limited resources using PUC adopted counting rules.

System Resource Adequacy Implementation D established System RA program in 2006 for 2006 compliance year, program has been in place since. Year Ahead showing for May-Sept due around Oct 31 each year Year-ahead system showing is 90% of RAR (peak load plus 15% reserves). Month ahead system showing 100% of RAR due 1 month and 1 day ahead (e.g. June showing due April 30) CPUC and CAISO staff cooperate to record and validate compliance by each LSE individually each month

Local RAR Implementation Decision established Local RAR, adding it to the RA program for 2007 RA year. LSEs must procure resources in 5 Local areas: LA Basin, Big Creek-Ventura, San Diego, Greater Bay Area, Other PG&E areas (combination of 6 local areas identified in CAISO study) LSE's Local RAR based on load shares in the IOUs service territories Reliability level adopted for 2007 – 2009 is NERC Category C (Two network elements forced out of service) level recommended by CAISO Currently no monthly Local RA filings (PD discusses this)

Rulemaking , Phase 2 – Capacity Markets Commission is deliberating establishment of a centralized capacity market based on markets from Eastern US states (i.e. NEISO and NYISO). Current system is a bilateral capacity market (each LSE contracts with each generator individually). Centralized market means one buyer, many generator sellers. Issue has been under deliberation since January Proceeding targets a mid 2009 decision.

Current PD posted May 15, 2009 Adopts exceedence with diversity benefit approach for wind/solar resources (significantly modified from CAISO-IOUs joint proposal) Decides to implement Monthly Local RA filings starting next year. Tentatively adopts CAISO performance and availability obligations. Reconsiders basis for LSE load forecast.