Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
E. Kako (KEK) Webex Meeting in May 24th, Status and Disassembly Plan of S1-G Cryomodule.
Progress and Plan for Superconducting RF Cavity RF Group.
LCLS-II Cryomodules Production Plans at Fermilab
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
S1 Global Module Cavity String Assembly Workflow Tug Arkan January 15, 2010.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 2/21/
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH HARDWARE PREPARATION FOR XFEL TTC topical workshop.
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Guillaume Olry, Sébastien Bousson CNRS/IN2P3/ IPN Orsay – Paris-Sud University Experience on Spiral2 cavity cleanliness degradation during clean room assembly.
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
Experience for vacuum plants during XFEL cavity production at companies and at LASA Paolo Michelato TTC Topical Workshop on SRF Cryomodule Clean Room Assembly,
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
Hao Guo LINAC Department Institute of Modern Physics.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
Vacuum experiences on XFEL Beam Position Quadrupole Units (BQU) preparation Marco Schalwat TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Paolo Michelato, July 19-22, 2006 Global Design Effort 1 Vacuum system segmentation Cold vacuum system segmentation reflects the cryogenic structure of.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Philippe Goudket ASTeC, STFC Daresbury Laboratory TTC –TOPICAL WORKSHOP SRF CLEANROOM ASSEMBLY.
Cryomodule Assembly Facility Fermilab Cleanroom Tug Arkan 1.
Cleanrooms Keith Middleman. Particulates and Clean rooms What is a particulate? Small discrete mass of solid or liquid. Human hair is microns in.
NEG pumps Used at CEBAF, FEL electron guns for >15 years Three varieties – Laminated strips: used inserted in CEBAF gun – Sintered disks – Beampipe coating.
Survey the cavity degradation mechanism under Dis assembly/assembly procedure for cERL cryomodule at KEK 1 Hiroshi Sakai, Takaaki Furuya, Masato Sato,
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
Review of clean room procedures for the HL-LHC Crab Cavity Program Reviewers: John Mammosser, ORNL (chair); Stephane Berry, CEA; Vittorio Parma, Mathieu.
Recent Result for the STF-2 Cryomodule Operation
CERN – Zanon discussions
Field Emission Minimization for LCLS-II
NL12 Girder Removal and Reinstallation
DESY Experiences on Use of Gas overlay during Assemblies
RTML Vacuum System RDR Summary FermiLab October 24, 2007
Operating SRF systems reliably in a “dirty” accelerator
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
Mathieu, Gabriel, Max, Spyros, Guillaume
Definition of work flow for string DESY Example on critical operation
Acceptance criteria for cleanroom infrastructure
S1-G Webex meeting Global Design Effort
C50 Cavity pair Assembly Changes
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Recent SCRF Activities in IHEP
WP 3 coordination meeting Saclay May 2008
UITF beamline installation
IMP Cryomodule Assembly and Alignment
IHEP Cryomodule Status
TTC Hot Topic Common Questions
Ari D. Palczewski, PhD SRF Staff Scientist 09/12/16
INSTITUTE OF HIGH ENERGY PHYSICS
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
UITF beamline installation
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA Saclay, November 2014

FP (with purge valve after VT) FPC HOM2 HOM1 Mass Flow Control V1 V2 V3 Relief valve 0.02 micron filter V5 Flow meter N2 Needle valve LD TMP V4 V11 V7V8 V9 V10 GV1 Angle Valve GV2 V11 Ion Gun (20-65psi) ( 0.1 micron filter ) 0.02 micron filter Class 10 (movable) Class 10 Pumping and Venting System Bellow 0.02 micron filter Slow pump down (130 ml/min, 3 torr/min) Slow vent (0.2 L/min) V6 V12

All components cleaned, dried and assembled in Class 10. All metal needed?

Angle Valve Cleaning Very hard to clean by blowing. Ethanol rinse and then blow.

How to clean long bellow to Class 10?

Beam Pipes Baking Beam pipes and bellow ultrasonic cleaned by UPW and dried. Bake 120 C (too low?), 12 hrs. Cavity vacuum 4E-5 Pa when cool down to 80K. Outgassing? Leak?

Vacuum Outside Cleanroom What is the component cleanness requirement? Assemble in local clean room? Repeat pump and slow backfill three times. Local clean room to connect beam pipes? Bake 120 C (time not enough). Ion pump too small. Will change to a 400L/s pump and add a 400L/s NEG pump, and all metal. Cavity upstream gate valve closed. Separate vacuum for the beam pipe.

N 2 Flushing Flush the cavity and beam pipes (~0.2 L/min), check particles of N 2 No flushing of the gate valve, power coupler and when connect beam pipes and gate valves (already installed on the cavity)

Bolt Holes Cleaning After cleaning four bolt holes, install and tight four clean bolts by hand (wrench), blow and clean the other holes, cavity flushing. Particles into the cavity?

Angle Valve Screw Lubricant MoS 2 ?

Thank you