FETS Ion Source Diagnostics: The Pepperpot

Slides:



Advertisements
Similar presentations
J. Pozimski-FETS IC 10 May 2006 First experiences with the FETS pepperpot detector.
Advertisements

Laser Speckle Extensometer ME 53
Pepperpot Emittance Measurements of the FETS Ion Source
Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
1 Laser Beam Coherence Purpose: To determine the frequency separation between the axial modes of a He-Ne Laser All sources of light, including lasers,
Spectrophotometer Jan 28, 2002 Deryck Hong Suryadi Gunawan.
TPAC update JC/31 st march TPAC1.2 Submitted – 2 nd March 2009 Lot started – 22 nd March 2009 Due date – 7 th May 2009.
Measuring cells.
AWAKE Electron Spectrometer Design Simon Jolly 4 th September 2012.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
F.E.T.S. Mechanical Engineering Update by P. Savage 13 th August 2008.
Electron Spectrometer Progress Report Simon Jolly 19 th October 2012.
1 Proposal for a Multi-Optical Transition Radiation System in ATF2 A. Faus-Golfe, D. McCormick IFIC – SLAC 11 June th TB/SGC Meeting.
Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting
1 Imaging Techniques for Flow and Motion Measurement Lecture 5 Lichuan Gui University of Mississippi 2011 Imaging & Recording Techniques.
Status Report on Mk.II Pepperpot Simon Jolly Imperial College 13 th June 2007.
Data Acquisition and Error Analysis for Pepperpot Emittance Measurements Simon Jolly Imperial College DIPAC ‘09.
Laser based Emittance Measurement for LINAC4 Project Overview & Current Status T. Hofmann, E. Bravin, U. Raich, F. Roncarolo, F.
Recent Progress in X-ray Emittance Diagnostics at SPring-8 S. Takano, M. Masaki, and H. Sumitomo * JASRI/SPring-8, Hyogo, Japan SES, Hyogo, Japan *
Noise Suppression Experiment - ATF A. Gover, A.Nause, E. Dyunin Tel-Aviv University Fac. Of Engin., Dept. of Physical Electronics, Tel-Aviv, Israel THANKS.
Transverse emittance Two different techniques were used to measure the transverse emittance. The multislit mask in the injector 9 MeV Quadrupole scan for.
RFQ CAD Model Beam Dynamics Studies Simon Jolly 3 rd August 2011.
D. Missiaen Summaries of the discussion. 2 H. Mainaud Durand The iris diaphragm laser alignment system for Spring 8 storage ring magnets Align multipoes.
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Recent Results from Dragonfire Armor Simulation Experiments Farrokh Najmabadi, Lane Carlson, John Pulsifer UC San Diego HAPL Meeting, Naval Research Laboratory.
Freiburg 7/07/20001 laser beam lens CCD (long arm) screen + grid CCD (short arm) glass plates at  45° STAMP : Saclay Telescope for the Alignment of Many.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
Development of a Gamma-Ray Beam Profile Monitor for the High-Intensity Gamma-Ray Source Thomas Regier, Department of Physics and Engineering Physics University.
A Transverse Profile Imager for SwissFEL Rasmus Ischebeck.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Simulations and Diagnostics for the Front End Test Stand Simon Jolly Imperial College 18 th April 2007.
1 Multi-Optical Transition Radiation System for ATF2 A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White,
MICROSCOPE DESIGN. beam expander and objective Why do we need a beam expander? What facts about the laser do we need to know? How much expansion do we.
Current Status of Pepperpot Emittance Measurement System Simon Jolly Imperial College FETS Meeting, 22/02/06.
FETS Pepperpot Simon Jolly 10 th February The Pepperpot Beam segmented by intercepting screen with regular array of holes. Beamlets drift short.
Summary of OTR measurements taken at the exit of the acceleration tube Recycler Weekly Departmental Meeting October 3 rd, 2007 L. Prost, A. Shemyakin A.
G. Ferioli, R. Jung - LHC-BI Review Workshop November 19&20 LHC Screen Profile Monitors G. Ferioli, R. Jung Introduction BTV LHC layout Monitor set-up.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Developments of the FETS Ion Source Scott Lawrie.
Pepperpot Emittance Measurement System: Current Status Simon Jolly Imperial College FETS Meeting, 10/05/06.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
RFQ GPT Input Beam Distributions Simon Jolly 22 nd August 2012.
RFQ Exit Bunch Modelling Simon Jolly 25 th July 2012.
Progress of Mk.II Pepperpot: Camera, Scintillator and Data Analysis Simon Jolly Imperial College 24 th January 2007.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
Measurement of Transverse Emittance in ASTA John Nocita Amber Johnson John Diamond August 8, 2013.
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
The RAL Front End Test Stand
GSI IPMs.
Laser-based Beam Diagnostics for the RAL Front End Test Stand
GPT Simulations of the Ion Source Beam
Pepperpot Emittance Measurements of the FETS Ion Source
Time-Reversed Particle Simulations In GPT (or “There And Back Again”)
at Royal Holloway Univ. London
BUNCH LENGTH MEASUREMENT SYSTEM FOR 500 KV PHOTOCATHODE DC GUN AT IHEP
Spectrometer Layout (Isometric View)
Status of the Front End Test Stand April 2007.
Optimisation of the FETS RFQ
Application of a Streak camera at PITZ
Pepperpot MkII assembly
Mechanical Engineering progress for the Front End Test Stand
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Simon Jolly UKNFIC Meeting 25th April 2008
Experience with photoinjector at ATF
Presentation transcript:

FETS Ion Source Diagnostics: The Pepperpot Simon Jolly Imperial College UKNF Meeting, 03/05/06

Ion Source Emittance Simulations of FETS LEBT require correlated X & Y emittance data and space charge compensation data. Current measurements only give x-x’ and y-y’ emittance measurements, with no x-y correlation. Requirement for correlated emittance data and information on space charge compensation… Pepperpot: reduce granularity to gain correlation …  03/05/06 Simon Jolly, Imperial College

Pepperpot Principle Beam segmented by tungsten screen. Drift length of ~12mm allows beamlets to expand. Beamlets produce image on phosphor screen. Copper block prevents beamlets from overlapping. CCD camera records image of light spots. Phosphor screen Copper block Fast CCD Camera H- Ion Beam Tungsten screen H- Beamlets 03/05/06 Simon Jolly, Imperial College

Purpose of Pepperpot Current measurements only give X-X’ and Y-Y’ emittance measurements, with no X-Y correlation. Pepperpot system reduces granularity of emittance measurement to give correlated measurements: Arrangement of spots gives (sampled) beam size: X-Y profile. Expansion and displacements of spots gives X-X’ and Y-Y’ emittance (and also X’-Y’ should we need it). Sampling at several positions gives space charge estimate (compare to GPT simulation). 03/05/06 Simon Jolly, Imperial College

Pepperpot Components Tungsten grid (25 x 25 holes, 100m diam, 3mm spacing). Copper block allows beamlets to expand. Phosphor screen images beamlets. Light from phosphor recorded by fast CCD camera (500ns shutter). Lens system mounted on camera improves resolution. Light path enclosed in light tight bellows. Whole system mounted on moving stage to allow longitudinal beam sampling (but camera-to-phosphor distance fixed). 03/05/06 Simon Jolly, Imperial College

FETS Pepperpot System (PJS) Complete Pepperpot assembly: Screen assembly produces beamlets and image on phosphor. Camera (+ lens) records phosphor image. Support structure “stolen” from previous system at RAL. Longitudinal motion from screw thread. 03/05/06 Simon Jolly, Imperial College

FETS Pepperpot System (2) Pepperpot screen assembly: Tungsten screen (100m holes with 3mm spacing). 10mm thick copper block. Phosphor screen (P46 or P47 phosphor on glass substrate). Aluminium mounting block. 03/05/06 Simon Jolly, Imperial College

FETS Pepperpot System (3) Pepperpot camera assembly: PCO 2000 camera with 2048 x 2048 pixel, 15.3 x 15.6 mm CCD. Firewire connection to PC. 105 mm Micro-Nikkor macro lens (not shown). Whole structure mounted on moving stage: 3-arm spider improves sability. 03/05/06 Simon Jolly, Imperial College

Complete Pepperpot System Assembled Pepperpot System at IC Pepperpot block + mount Bellows Camera + lens Vacuum flange 03/05/06 Simon Jolly, Imperial College

Pepperpot Calibration Images Calibration Images from setup at IC 03/05/06 Simon Jolly, Imperial College

Pepperpot Data Calibration Image Ion Source Background 03/05/06 Simon Jolly, Imperial College

Next steps Complete calibration & analysis software in Matlab: Need prediction of actual hole location before we can calculate emittance. Alignment comes from “ruler” image: correlate to hole position using test data. Fix vacuum leaks (new seals/bellows). Make improved hole size measurements on tungsten screen. Improved tungsten screen with 50m holes. Take some real data… 03/05/06 Simon Jolly, Imperial College