TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission.

Slides:



Advertisements
Similar presentations
Industry Brainstorm on increasing Export Capacity From Alberta to B.C. January, 2006.
Advertisements

Arizona Corporation Commission 2008 Biennial Transmission Assessment Workshop I CATS-EHV 2007 Studies Ten Year Snapshot and N-1-1 Jose Silva Salt River.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Arizona Corporation Commission Workshop
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
Special Open Meeting of the Arizona Corporation Commission Energy Workshop February 16, 2001 Arizona Public Service Company Cary B. Deise Director, Transmission.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
2006 BTA 8/5/ SSC-1 ACC BTA Requirements SRP’s Ten Year Plan Presentation Chuck Russell Salt River Project June 6, 2006 Phoenix, Arizona Arizona.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
1 FRCC Compliance Organization and Entity Registration 2008 FRCC Compliance Workshop.
NW Transmission System Bottlenecks and Impacts of 2005 Summer Operation BPA Transmission Business Line Mike Viles January 2006.
Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos BTA Workshop May
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
5/23/08ACC 5 th BTA Workshop – Phoenix - SWAT – RE Kondziolka 1 SWAT Subregional Planning Group Update Arizona Corporation Commission Fifth Biennial Transmission.
 2005 Pinnacle West Capital Corporation Special Open Meeting of the Arizona Corporation Commission 2005 Summer Assessment March 18, 2005 Arizona Public.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
Arizona Corporation Commission Docket No. E-00000D Biennial Transmission Assessment Workshop II September 18, 2008.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
APS Ten-Year Plans th BTA Presentation John Lucas Manager Transmission Planning May 22, 2008.
BTA Workshop May 22, 2008 Ten-Year Transmission Plan for the Santa Cruz Water & Power Districts Association (“Santa Cruz”) 10/26/2015K.R. Saline & Assoicates,
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
Arizona Corporation Commission Energy Workshop February 16, 2001.
03/22/07 ACC Open MeetingSummer Preparedness SRP Summer Preparedness 2007 Mike Hummel Manager – Supply & Trading and Gary Harper Manager - System.
Arizona Corporation Commission Power Plant & Transmission Siting Summary ACC Staff Presentation October 30,
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
1 Arizona Renewable Transmission Task Force BTA Response Chairman of SWAT RTTF Peter Krzykos Peter Krzykos ACC Meeting Oct
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
Reliability Must-Run Analysis 2006 – th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
1 CATS HV Status Report Presented to the 2008 BTA Workshop May 22, 2008.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
December 14, 2015 TEP & SWTC 2 nd Quarter Stakeholder Meeting 1 4 th Quarter Stakeholder Transmission Planning Meeting December 14, 2015 Unisource Energy.
A new Nomogram Development POM- based tool - Application results in the Idaho Power System. Orlando Ciniglio, IPC Marianna Vaiman, V&R Energy WECC TSS.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
Arizona Extreme Contingency Analysis 2009 & th BTA Presentation Jonathan Stahlhut, Ph.D. Transmission Planning Engineer, APS May 22-23, 2008.
3/18/ FUTURE LINES EXISTING LINES FUTURE 500kV SUBSTATIONEXISTING 500kV SUBSTATION ATTACHMENT A SALT RIVER PROJECT 500kV SYSTEM January 23,
Arizona Corporation Commission Biennial Transmission Assessment Workshop May 22 & 23, 2008 Phoenix, AZ.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Navajo Transmission System
RTCA Display for Increased Situational Awareness
ERCOT 2009 Five-Year Transmission Plan Update
Proposal to Remove from Service the PV-COI RAS
Western Electricity Coordinating Council
Deliverability Maps for 2017 Peaking Capacity RFP
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Mid-Continent Area Power Pool
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Idaho Power Transmission System
TONBRIDGE POWER GREEN LINE
Palo Verde-COI RAS Retirement
Proposal to Remove from Service the PV-COI RAS
Palo Verde-COI RAS Retirement
Nogales DC Tie Capacity
Big Stone II Study Update
Presentation transcript:

TEP RMR Workshop Presentation1 Workshop on ACC RMR study submitted with 2004 ten year plan Tucson Electric Power January 15, 2004 Ed Beck Supervisor Transmission Planning

TEP RMR Workshop Presentation2 TEP RMR Study TEP operates its system to WECC / NERC Level C (N-2) criteria Studies for RMR analysis were done to WECC / NERC Level B (N-1) based on Biennial assessment Cases used in study developed jointly with APS, SRP, WAPA, SWTC

TEP RMR Workshop Presentation3 TEP System TEP system historically has been voltage stability constrained –Local Var responsive units can be committed in TEP load area to supply var support and lower imports as necessary –Automated remedial action scheme that responds to selected single and double contingencies within maximum 0.7 seconds In future years we have identified thermal and internal voltage SIL constraints

TEP RMR Workshop Presentation4 UES System This report does not address issues with the UES Santa Cruz County area TEP is extensively studying issues in Santa Cruz county as part of a separate study for the Commission

TEP RMR Workshop Presentation5 Greenlee Westwing North Loop South TEP Service Area Vail 500 kV 345 kV Irvington Voltage 2005 New Facilities Nogales Tortolita Saguaro Winchester (04) Copper Verde (04) Gateway Sub (05) Internal 138 kV upgrades

TEP RMR Workshop Presentation6 Greenlee Westwing North Loop South TEP Service Area Vail 500 kV 345 kV Irvington Voltage 2008 New Facilities Nogales Tortolita Saguaro Pinal West Internal 138 kV upgrades

TEP RMR Workshop Presentation7 Greenlee Westwing North Loop South TEP Service Area Vail 500 kV 345 kV Irvington Voltage 2012 New Facilities Nogales Tortolita Saguaro Pinal West to Tortolita Nogales Tortolita to South

TEP RMR Workshop Presentation8 Simultaneous Import Limit YearSIL MW Losses Total MW Critical Outage Nature of Constraint Cholla – Sag. 500 kV line WECC volt. Stability criteria South T2 345/138kV xfmr Irv/VL 138 kV line limit SPR-VL 345kV lineInternal volt. Criteria

TEP RMR Workshop Presentation9 Peak Load YearPEAK MW Losses Total MW RMR MW Critical OutageNature of Constraint South T2 345 / 138 kV Xfmr Irvington / Vail 138kV line loading limit South T2 345 / 138 kV Xfmr Irvington / Vail 138kV line loading limit Tortolita 500/138 Xfmr (#1 or #2) Remaining Tortolita 500/138 kV Xfmr loading limit

TEP RMR Workshop Presentation10 MLSC YearPEAK MW Losses Total MW Gen. Critical OutageNature of Constraint South T2 345 / 138 kV Xfmr Irvington / Vail 138kV line loading limit South T2 345 / 138 kV Xfmr Irvington / Vail 138kV line loading limit Tortolita 500/138 Xfmr (#1 or #2) Remaining Tortolita 500/138 kV Xfmr loading limit

TEP RMR Workshop Presentation11 Summary – Cost RMR Inc. RMR gen. costs SIL MLSC Peak Load RMR Annual Cost$68,061$307,179$301,885

TEP RMR Workshop Presentation12 Environmental RMR Output SO2NOxPMCO , ,2211,5085, ,

TEP RMR Workshop Presentation13 Questions?