LINAC 4 CCDTL Accelerating Structure. 1 2 3 4 5 7 6 SO 51429-12 SO 50021-12 Aluminum foil H = 0,3…0,5 mm Module of CCDTL Accelerating Structure.

Slides:



Advertisements
Similar presentations
19.Dez Volker Prahl Space frame endplate. 1 1 WPM 186, Volker Prahl Guide ring necessary HV-Connector.
Advertisements

Vacuum Vessel Production Readiness Review
Part2: Cavities and Structures Modes in resonant cavity From a cavity to an accelerator Examples of structures JUAS 2015 Linacs-JB.Lallement - JUAS
27/9/2007, T Water =19°C No Box screwed onto cooling block: T min =37°C, T max =48 °C.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
LHC CRAB CAVITY He Tank DQW Prototype P.Freijedo-Menendez C.Zanoni L.Giordanino R.Leuxe.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
FNAL Meeting, July 2006 Basti, Bedeschi, Raffaelli, INFN-Pisa 1 ILC cryomodule mechanical work at INFN-Pisa  Ongoing work  Near term future  Manpower.
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
ELENA – Electron Cooler Vacuum design Benjamin Moles March 26 th 2015 on behalf of Electron Cooler team : Gerard Tranquille Jean Cenede Lars Soby Lars.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
Director’s Review Dec 1999 Tracker Integration and Installation W. E. Cooper 6 December 1999.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
Spacecraft Interface/Handling Ring Robert Besuner 12 August 2004.
SIMPLE CHARACTERIZATION METHOD OF SMALL HIGH GRADIENT PERMANENT MAGNET QUADRUPOLES Concetta Ronsivalle,Luigi Picardi, Monia Vadrucci (ENEA C.R. Frascati,
Girders fabrication: Difficulties to achieve tolerances and machining process Igor Madariaga (ESS-Bilbao) 13 September 2011 DTL mini-workshop, CERN.
ISTC Project #3888 Development, manufacture and experimental investigation of a unique pilot CCDTL accelerating section in the energy range of MeV.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
Xx-xx-2010, tanks arrive from Snezhinsk to Novosibirsk A.Tribendis, July 19-21, 2010, Snezhinsk 1. Check cavity dimensions on a CMM 2. Assemble and measure.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Ports: purpose –vacuum, rf location –accelerating cavity, coupling cavity dimensions … Already discussed, but some points need to be double checked …
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
BINP geometry (= cavity inner dimensions which define the boundary) is based on CERN geometry (as of August 4, 2008) with some adjustments made in order.
RF-FOIL MOUNTING SCENARIO CHEMICAL ATTACK TOOLING PVC FLANGE - THE PVC FLANGE UPSIDE DOWN ON “TABLE”
THE MAFF IH-RFQ TEST STAND AT THE IAP FRANKFURT A. Bechtold, J. Fischbach, D. Habs, O. Kester, M. Pasini, U. Ratzinger, J. Rehberg, M. Reichwein, A. Schempp,
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
Introduction to mechanical design of the SPES RFQ Ferrari Luigi, Technical Review, 09/21/15 Design review, 09/21/20151.
ESS RFQ B. POTTIN and RFQ team CEA-IRFU. RFQ design Strategy 3 RF codes to validate calculations Consideration of machining and assembly possibilities.
Treatment Machines for External Beam Radiotherapy
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The Alignment of DTL in CSNS Institute of High Energy Physics, CAS KE Zhiyong
Two-beam module layout
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
BM&N STS ladders assembly in VLHEP
CLIC Parameter Working Group Two Beam Module Design
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Linac4 M. Vretenar for the Linac4 design team
Linac4 Beam Characteristics
Complementary ISTC Projects #3888, 3889p
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
IR Detector - Test cryostat : Machining
Physics design on Injector-1 RFQ
Easycliner (Motorized Version) Assembly Instruction
List of changes and improvements for the next generation CLIC module
LCD Splicing Screens Wall-mounted Guide
Part2: Cavities and Structures
Duct casings for particulate filters DCA
Summary of the checking items of the Module-C design
IMP Cryomodule Assembly and Alignment
Comments on TRD rail system
Collective Effects and Beam Measurements in Particle Accelerators
Part2: Cavities and Structures
Alignment of Main Linac Cryomodule (MLC)
Progress and plans, Mechanics system of CEPC
V. Veshcherevich Cornell University
Presentation transcript:

LINAC 4 CCDTL Accelerating Structure

SO SO Aluminum foil H = 0,3…0,5 mm Module of CCDTL Accelerating Structure

General view of CCDTL module

Module Structure Bracket for fixing quadrupoles between the section tanks Bracket for fixing cooling collectors of the module section Bracket for lifting and additional fixing of waveguide Bracket for fixing quadrupoles between the sections

Dimensions of bracket for fixing quadrupoles between the section tanks

Dimensions of bracket for fixing cooling collectors of the module section

Dimensions of bracket for lifting and additional fixing of waveguide

Dimensions of bracket for fixing quadrupoles between the module sections Universal fastener or Inter-mod1 Inter-mod2

Adjustment Areas

Cam and Adjustment screws Alignment of Cavities in the Module

Lift and additional fixation of waveguide section Mounting pins

L 1025 Module Support Frame Dimensions

Calculation of Frame Deformation Finite-element model of the frame with installed cavities Frame displacements (mm) along Y axis

Frame Sizes

Thermal calculations of the cavities Tank 20 with waveguide flange, duty cycle 5% Temperature fields (°C) Waveguide flange

Tank 20, duty cycle 5% Temperature fields (°C) PIMS coupling flange

Tank 20, duty cycle 5% Temperature drifts (m) PIMS coupling flangeWaveguide flange

Tank 20, duty cycle 10% Temperature fields (°C) Waveguide flange

PIMS coupling flange Tank 20, duty cycle 10% Temperature fields (°C)

Tank 20, duty cycle 10% Temperature drifts (m) Waveguide flangePIMS coupling flange