ICS interfaces Timo Korhonen ICS www.europeanspallationsource.se Apr 22, 2015.

Slides:



Advertisements
Similar presentations
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Advertisements

Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 Real-Time Data Transfer using the Timing System (Original slides and driver code by Babak Kalantari)
ESS Test and Prototyping Activities Daniel Piso Ferńandez December 4, 2014.
EUT 1040 Lecture 10: Programmable Logic Controllers.
2D Detectors DAQ Overview 2D detectors are organized as tiles providing 10G Ethernet serialized portions of the full.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
Distributed Control Systems Emad Ali Chemical Engineering Department King SAUD University.
EtherCAT Driver for Remote I/O James Rowland, Ronaldo Mercado and Nick Rees.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Hardware Platforms for ESS ICS Timo Korhonen ICS Nov.. 5, 2014.
Berliner Elektronenspeicherringgesellschaft für Synchrotronstrahlung mbH (BESSY) Accelerator and Experiment Control and Monitor Systems Ralph Lange BESSY,
Synchronous Device Interface at NSLS-II Yuke Tian Control Group, NSLS-II, BNL (May 1, 2009 EPICS Collaboration Meeting, Vancouver)
ESS Controls Infrastructure Timo Korhonen ICS Feb.. 4, 2015.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
EPICS Collaboration Meeting Spring 2010, Aix France, Jun 2, 2010 Page 1 ITER CODAC COntrol, Data Access and Communication System for ITER Anders Wallander.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
Power Supply Control at NSLS-II Yuke Tian Control Group, NSLS-II, BNL (May 1, 2009 EPICS Collaboration Meeting, Vancouver)
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
FAIR Accelerator Controls Strategy
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Oct 8-9, 2005ACS Collaboration Meeting – Archamps, France The MicroIOC From Custom To Production First customer: PSI 25 pieces.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
CERN Control Standards Front-End Computer Layer Stéphane Deghaye BE/CO/FE
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
CEA DSM Irfu July 19th 2013-Françoise Gougnaud - Status of EPICS control for ECCTD 1 Françoise Gougnaud Irfu/SIS.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 New Standards VLT Control System Mario Kiekebusch (On behalf everyone who took part.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
Beam Interlock System Technology Evaluation and Design MACS Week 1, 2011 Hannes Pavetits 1 R. Gutleber PR a-HPA, March 28 th, 2011 H. Pavetits.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
EtherCAT based RF Interlock System for SwissFEL LLRF 2015 Abstract As part of the overall development effort for SwissFEL's RF and LLRF systems, the RF.
Page Beam Instrumentation mini- workshop Conclusions from the Hardware, Timing and MPS mini-workshop Lund, Miha Reščič Deputy Head of
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Controls standards and support Daniel Piso Fernández Hardware and Integration Group Leader 10 February 2016.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
Motion ESS Thomas Gahl Head of Motion Control & Automation Group November 27, 2014.
Control System Tools for Beam Commissioning Timo Korhonen Controls Division Chief Engineer April 8, 2014.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
ESS LLRF and Beam Interaction
Status of I&C System Development for ITER Diagnostic Systems in Japan
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
ATF/ATF2 Control System
COntrol, Data Access and Communication System for ITER
RF Local Protection System
Way of working with ICS HWI Hardware and Integration
Plan for controls with the digital platform
Status of Control Services ICS WP10 (accelerator integration work package) Tuesday 20th November
EPICS: Experimental Physics and Industrial Control System
ESS Main Control Room & ICS Infrastructure
Control Systems for the APTM and GRID
Vacuum Control System for Monolith Vacuum
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

ICS interfaces Timo Korhonen ICS Apr 22, 2015

Overview 2 Controls interfaces Hardware platforms for I/O High-speed digital platform Middle range I/O Industrial I/O Timing and beam mode data Signals to connect Data archiving Alarms

Controls interfaces 3 Control system interfaces include Hardware for I/O signals, cabling Control and data requirements Speeds, accuracies, data amounts Interfaces to controls services Naming Configuration management Data archiving and retrieval GUIs for device operation Requirements for operating ESS Every signal in control room comes through the control system! Many other details that cannot all be covered today.

Hardware platforms for I/O 4 Control system must cover a spectrum of I/O requirements Fast, real-time signal processing State-of-the-art technology, evolving fast FPGA-based processing MHz to GHz range of signal acquisition Middle-range I/O requires synchronization, kHz range I/O Non-real time industrial I/O Typically PLC-based Off-the-shelf devices Serial, Ethernet or other fieldbus devices More detail can be found herehere

Fast, real-time signal acquisition 5 The high-end platform for ESS is MTCA.4 Consider this when you have requirements like: Signal acquisition faster than 100 kHz (100 kSPS) Precision timing pulses or clocks, RF synchronised Fast preprocessing of signals (with FPGA) Tight synchronisation with beam pulses Typical uses in LLRF and instrumentation Probably not much else Final design and selection of components underway To be done with stakeholders Crate and CPU standards will be provided by ICS

Middle-range I/O 6 High-end platform is expensive and centralized Use only where absolutely needed Some applications still need time synchronization Especially in a pulsed machine! PLCs are not ideal for this (asynchronous cycle times) EtherCAT is a good solution for this range Uses Ethernet cabling, special protocol Can run on a PC or a MTCA IOC Loop times of several kHz possible Distributed I/O (reduce cabling) Cost effective Many I/O modules, several manufacturers Widely used in the EPICS community

Industrial I/O 7 PLC is the standard choice for most industrial-type I/O High reliability Established technology A huge selection of I/O modules available Recommended manufacturer will be announced soon For safety applications, Siemens has already been awarded a framework contract For general, non-safety applications contract will be awarded within a few weeks Use for most I/O that does not need to be beam- synchronous E.g., vacuum, cryogenics, etc. Local (slow) protection

“Other” I/O 8 There is still a large number of devices not covered yet Serial devices (RS-232, RS-485) Use MOXA ethernet-to-serial converter Ethernet-based devices Ethernet as a fieldbus, use StreamDevice & ASYN Motion control For prototyping, use GeoBrick (Delta Tau) Final selection of hardware under evaluation Cameras GigE, 10GBE, CameraLink(HS) EPICS AreaDetector supports a large device base Contact ICS before making a selection

Cabling 9 We need to think and decide who does Cabling from devices to the I/O components MTCA.4 crates EtherCAT and PLC I/O terminals ICS will provide lists of supported I/O types I/O terminals for EtherCAT (exists already in fact) PLCs (as soon as vendor announced) – catalogue Timing – electrical, optical triggers, precision MTCA.4 case-by-case (typically end user defined) From the signal interface to control room is ICS responsibility Ethernet, timing, etc. networks

Timing 10 Synchronisation will be provided by ICS to all subsystems that need it Event system (Micro-Research Finland) One (could be more) central master (Event Generator) Several timing receivers Timing system distributes High-precision trigger signals Many possible electrical interfaces Synchronous data E.g. Beam mode data Timestamps For EPICS process variables More details: a presentation, if requested?

EPICS 11 All I/O signals will go to EPICS IOCs to be Monitored or manipulated by operators or system experts Archived for later analysis Used in physics or other applications to run the accelerator As a system owner, think: What signals you need to operate the devices? Currents, temperatures, status, on/off, etc. Speed? Precision? Do you want to check what happened a while ago? Archiving service provided by ICS How do I operate my device? Startup, calibration, operation modes, etc.

EPICS (continued) 12 How do I operate my device? Startup, calibration, operation modes, etc. Dependency on beam modes E.g., operating a wirescanner – only with low intensity beam When should operator take an action if something is not in a normal state? Alarm service provided by ICS, “soft” protection Beyond EPICS scope: need to protect the device from damage (local protection) Is it OK to have beam? (machine protection, beam interlock)

Summary 13 A lot of discussion revolves around the high-end platform But that is only a part of the story work-intensive and critical part, but still Other areas tend to get too little attention try to set up a comprehensive set of solutions We have selected MTCA.4 for the high-end Knowing that there will be issues to solve But they can be solved We try to establish and leverage collaborations Mutual help between institutes Other areas are equally, if not even more urgent Need to keep going there, too Start prototyping (in our new lab)

14 Questions?

EPICS IOC Control & Monitoring Control Services High- Level Application Control & Monitoring Control Services High- Level Application RF Cell/ Power Supply ICS Scope ( including programming for most WPs) ACCSYS WP8, WP2, WP6, WP 17 Controlled System/Device EPICS IOC Control & Monitoring Control Services High- Level Application Control & Monitoring Control Services High- Level Application Motion Controller* Motion Controller* ACCSYS WP4, WP5, WP7, WP10 Controlled System/Device EPICS IOC Control & Monitoring Control Services High- Level Application Control & Monitoring Control Services High- Level Application PLC Controller** PLC Controller** ACCSYS WP3, WP4, WP5, WP6, WP10, WP11, WP 12, WP15, WP16 EPICS IOC Control & Monitoring Control Services High- Level Application Control & Monitoring Control Services High- Level Application Controlled System/Device ACCSYS WP3, WP6, WP7, WP 12 * Motion Controllers. Standardization and prototyping under ICS scope. Cost under AD scope. ** PLC Controllers. Standardization and programming under ICS scope. Cost under AD scope AD Scope AD – ICS Interfaces and Division of Responsibilities March 2015